Inspections for the day of: Friday, June 2, 2017.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00935 General Inspection6/2/20176/2/20176/6/2017 2:23:40 PM CANC
ESC16-01431 General Inspection6/2/20176/2/20176/2/2017 3:50:48 PMPPART
WIP. No trackout or sediment runoff down Bogus Basin Road. Site has 1 water truck in service. No dust on upper hillside but areas around entrance have layer of loose dirt that blows in the wind. Need roadmix or temorary mulch to settle loose dirt. Will inform RP on Monday.

ESC16-01707 General Inspection6/2/20176/2/20176/2/2017 3:24:46 PMPPASS
WIP. Trash container has been serviced. No trackout or spills around site. No DI bag installed below home, but perimeter wattle is installed and working well to contain unstabilized yard.
ESC13-00193 General Inspection6/2/20176/2/20176/2/2017 3:22:36 PM PASS
WIP on clubhouse and last home on Mesa Grande. DI bag below clubhouse is in good condition. Lower site has perimeter wattle installed. No loose trash or debris. No corrections at this time.
ESC16-00209 General Inspection6/2/20176/2/20176/2/2017 2:55:25 PM PASS
WIP on exterior siding. Frame is complete. No trackout from building or staging area. No loose trash around the perimeter. Site is currently in compliance.
ESC16-01226 Aging Inspection6/2/20176/2/20176/2/2017 12:13:55 PM PASS
Home complete, landscaped, cleaned, and occupied. ESC conditions satisfied. All permits finaled.
ESC16-01226 DOC - Permit Finaled6/2/20176/2/20176/2/2017 12:13:30 PMPPASS
ESC16-01119 Site Final6/2/20176/2/20176/2/2017 12:05:34 PMPPASS
Home complete, landscaped and occupied. No corrections. Temp DI bag at end of street to be removed when all landscaping complete. No corrections needed.
ESC17-00197 Tracking Control5/30/20176/2/20176/2/2017 11:59:59 AMPCANC
rescheduled
ESC16-01118 DOC - Permit Finaled6/2/20176/2/20176/2/2017 11:58:41 AMPPASS
Home complete, landscaped and occupied. No corrections. Temp DI bag at end of street to be removed when all landscaping complete. No corrections needed.
ESC16-01117 DOC - Permit Finaled6/2/20176/2/20176/2/2017 11:58:19 AMPPASS
Home complete, landscaped and occupied. No corrections. Temp DI bag at end of street to be removed when all landscaping complete. No corrections needed.
ESC16-01177 Site Final6/2/20176/2/20176/2/2017 11:56:26 AMPPASS
Home complete and occupied. Hunter Homes has removed temporary DI bags on Shadywood @ Wolf Tree. ESC permit finaled.
ESC16-01176 Site Final6/2/20176/2/20176/2/2017 11:56:07 AMPPASS
Home complete and occupied. Landscaping in progress by homeowner. Hunter Homes has removed temporary DI bags on Shadywood @ Wolf Tree. ESC permit finaled.
ESC16-01143 General Inspection6/2/20176/2/20176/2/2017 11:52:26 AMPFAIL
Corrections needed. Site not in compliance.

- pick up loose construction trash in Warm Springs Creek across from project.
- remove stockpile of dirt and stucco grout.
- remove full DI bags southwest of site in alley @ Shadywood.

Verbal correction request to Clint. Will follow up 6/8
ESC16-00159 General Inspection6/2/20176/2/20176/2/2017 11:48:16 AMPFAIL
Need to remove DI bags that full at south end of Shadywood. All homes are complete and stabilized and DI bags could cause flooding or break loose into system.

Lots of trash in Warm Springs Creek east of Millbrook projects by Tahoe Homes. Verbal correction request to RP Clint.
ESC16-00561 General Inspection6/2/20176/2/20176/2/2017 11:35:11 AM PASS
WIP on exterior. Project scheduled to be complete end of July. No trackout discharges to Mesa Verde . Rear hillside vegetation has established and perimeter silt fence and wattles are still installed till final landscaping/stabilization.
ESC17-00203 Conference6/2/20176/2/20176/2/2017 11:28:30 AMADONE
note - onsite project manager Ruedebuesch Construction is Daryl ###-####

Stated he would have two water trucks provided on hot dry days where fugitve dust is an issue during this initial grading and earth moving. Currently only have one water truck in operation
ESC16-00288 General Inspection6/2/20176/2/20176/2/2017 11:28:07 AM PASS
WIP on exterior finish. No activity at time of inspection. No trackout or significant amounts of loose sediment/debris in sidewalk and gutter. Receiving storm drains have maintained DI ags. Permit sign posted. Approved.
ESC16-01608 General Inspection6/2/20176/2/20176/2/2017 11:21:32 AMAPASS
Framing in progress. Trash and materials contained. No sediment runoff or trackout issues. Approved.
ESC16-00713 DOC - Permit Finaled6/2/20176/2/20176/2/2017 10:56:15 AMPPASS
ESC16-00808 General Inspection6/2/20176/2/20176/2/2017 10:48:40 AM PEND
BLD open for final geotechnical approval. Disturbed hillside is over 70% vegetaion. Will final with BLD permit