PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, June 22, 2020
.
Number of inspections:
11
Percentage of inspections complete:
82 %
Percentage of inspections not complete:
18 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01022
General Inspection
6/15/2020
6/15/2020
P
post rainfall inspection
ESC19-00618
Site Final
6/17/2020
6/17/2020
P
ESC18-00162
General Inspection
6/22/2020
6/22/2020
6/26/2020 4:53:04 PM
CANC
ESC17-00471
Aging Inspection
6/22/2020
6/22/2020
6/26/2020 4:52:51 PM
CANC
ESC20-00554
BMP Violation
6/22/2020
6/22/2020
6/23/2020 2:19:32 PM
P
PASS
Discussed BMPs with RP. Homeowners also doing some of the work. Requested they use concrete washout on site and dump no more rinse or washwater in the shoulder next irrigation nor the gutter on Rim.
ESC19-00371
General Inspection
6/22/2020
6/22/2020
6/22/2020 5:08:34 PM
A
PASS
Dewatering in progress. Pumping from plugged resevoir holding captured stormwater from last weeks rain events.
Conducted turbidity sampling at the discharge point of the unamed stream from the Mesa into Penitentiary Canal at Warm Springs Road:
Background water upstream in Pen Canal of discharge point at Warm Springs Road: 3.91 NTU @ 12:26 PM
Water in unnamed stream prior to discharge to Pen canal: 152 NTU @ 12:28 PM
Water downstream in Pen Canal after discharge: 47.6 NTU @ 12:38 PM (this is still in compliance being less than 50 NTU increase of background water)
Other measurements:
Water flowing from Pen Canal into culvert to ACHD pont 9.83 NTU
Water joining stream after passing through dewatering bag, passing through vegetation and controls installed was 104 NTU @ 12:51 PM
Water in site stormwater holding pond 171 NTU @ 1:03 PM
Water below dewatering bag 100 NTU @ 12:58 PM
Double check of water in bottom of stream prior to discharge to Pen Canal: 149 NTU @ 13:28 PM
The dewatering water is actually getting dirtier (more turbid) as it travels down stream picking up residual mud from previous runoff events and perhaps due to the steepness of this section of stream.
This inspection is a PASS because the background and downstream turbidity at the discharge point is less than 50 NTU and the dewatering water is clear to the naked eye where it is joining the unnamed stream and the system is effectively reducing the turbidity of the water from the holding pond, allowing for the discharge to continue.
Follow up inspection scheduled tomorrow with ACHD and Syman to conduct turbidity testing with different meters to compare results.
ESC16-01560
General Inspection
6/22/2020
6/22/2020
6/22/2020 2:52:01 PM
PASS
ESC19-00245
General Inspection
6/22/2020
6/22/2020
6/22/2020 2:51:36 PM
PASS
Revegetating, No active construction. Permit to remain open for next phase of work
ESC14-00788
Aging Inspection
6/22/2020
6/22/2020
6/22/2020 2:49:49 PM
PASS
WIP on SFHs. Subdivision BMPs installed. Approved.
ESC19-01428
DOC - Permit Finaled
6/22/2020
6/22/2020
6/22/2020 8:23:30 AM
P
PASS
ESC19-01199
DOC - Permit Finaled
6/22/2020
6/22/2020
6/22/2020 8:14:18 AM
P
PASS