PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, June 23, 2020
.
Number of inspections:
9
Percentage of inspections complete:
89 %
Percentage of inspections not complete:
11 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC19-00618
Site Final
6/17/2020
6/17/2020
P
ESC19-00351
General Inspection
6/23/2020
6/23/2020
7/1/2020 4:40:59 PM
PASS
WIP on townhomes on Tierra. Storm drains have sediment protection, permit sign posted at entrance. No dumped material or trackout observed. Trash contained.
No corrections requested.
ESC19-00909
Site Final
6/22/2020
6/23/2020
7/1/2020 2:25:43 PM
P
PASS
ESC19-00535
Aging Inspection
6/23/2020
6/23/2020
6/26/2020 4:52:39 PM
CANC
ESC19-00371
General Inspection
6/23/2020
6/23/2020
6/23/2020 5:19:14 PM
P
PASS
Dewatering discharge turbidity sampling and site meeting to check differences in readings between City turbidimeters and site turbidimeters furnished by Syman Company.
Sampling results for 8:50- 9:25 AM:
Pen Can background: 3.75- 5.3 NTU
dewatering water before discharge into canal:
319-361 NTU
Sample of visible plume of dewatering in discharge in Pen Canal 49.1-57.7* NTU.
* Syman test on same grab sample: 29.8 -30.5
Sampling results of dewatering system:
-water detained in pond: 128- 138 NTU
-water after passing through sediment bag and wattle: 85.1 - 92
- dewatering water entering unnamed stream at flume: 109
Additional sampling at 11:30 - 11:40 AM
- Pen Can background: 3.94 NTU
- Dewatering water before discharge into canal:
129 NTU
Sample of visible plume of dewatering in discharge in Pen Canal 34.5 NTU .
The discharge at the recieving water at 11:40 AM was in compliance, increasing turbidity of water in Pen Canal by approximately 31 NTU.
Conclusion:
Dewatering is being treated but then picks up turbidity between the discharge at the site and the discharge into the receiving water, Pen Canal. Mud and eroded sediment from the site and other source is being flushed by the dewatering water. The visible plume when compared to background is in compliance.
Dewatering should be completed by tomorrow if not today. Once pond is dewatered site will continue with stabilization and revegetation of the remaiing disturbed areas.
Syman is taking sample visble plume grab sample that all four meters (Boise (2), ACHD (1), Syman (1)) tested. If taken within 48 hours and successfully kept below high temperature, the result could be meaningful in determining why Hach turbidimeters used by City and ACHD get different (higher NTU) readings than the Lamotte meter used by Syman.
ESC17-00078
General Inspection
6/23/2020
6/23/2020
6/23/2020 2:21:10 PM
PASS
All homes near completion. Will have DI bags removed and should be able to close permit.
ESC20-00387
Site Preparation
6/22/2020
6/23/2020
6/23/2020 2:20:38 PM
A
PASS
Project is located behind a lock gate. Call me prior to inspection and I can let you in. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Approved for construction.
ESC39-00007
Aging Inspection
6/23/2020
6/23/2020
6/23/2020 2:20:10 PM
CANC
ESC39-00008
Aging Inspection
6/23/2020
6/23/2020
6/23/2020 2:19:46 PM
PASS