ESC16-00159
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 4:21:24 PM | P | PASS |
|
|
Streets and gutters now installed. Landscaping in progress. New inlets have sediment filter bags installed. No changes to Warm Springs Creek BMPs. May need to re-seed in Fall.
No corrections issued.
|
ESC16-00561
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 3:23:34 PM | P | PASS |
|
|
Perimeter wattles now installed. GC has permission to temporarily use adjacent lot for rock stockpile, will re-vegetate/restore as needed.
Permit sign posted, GC responded to corrections promptly.
|
ESC15-00556
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 2:50:59 PM | | PASS |
|
|
|
ESC15-01498
| DOC - Permit Finaled | 6/24/2016 | 6/24/2016 | 6/24/2016 2:36:30 PM | P | PASS |
|
|
Parkcenter townhome complete and landscaped. Final clean up complete. Temp BMPs to remain while Blvd. townhomes are in progress. Active sites in compliance.
|
ESC15-01497
| DOC - Permit Finaled | 6/24/2016 | 6/24/2016 | 6/24/2016 2:36:21 PM | P | PASS |
|
|
Parkcenter townhome complete and landscaped. Final clean up complete. Temp BMPs to remain while Blvd. townhomes are in progress. Active sites in compliance.
|
ESC15-01496
| DOC - Permit Finaled | 6/24/2016 | 6/24/2016 | 6/24/2016 2:36:12 PM | P | PASS |
|
|
Parkcenter townhome complete and landscaped. Final clean up complete. Temp BMPs to remain while Blvd. townhomes are in progress. Active sites in compliance.
|
ESC15-01500
| DOC - Permit Finaled | 6/24/2016 | 6/24/2016 | 6/24/2016 2:12:33 PM | P | PASS |
|
|
Townhome complete and landscaped. Active construction in progress so no BMP removal.
|
ESC15-00403
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 2:10:09 PM | | PASS |
|
|
Vertical construction in progress. No earthwork. No violations observed.
|
ESC13-00806
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 1:47:37 PM | | PASS |
|
|
|
ESC16-00175
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 1:43:20 PM | P | PASS |
|
|
WIP. BMPs installed, vegetative perimeters have been preserved. No fugitive dust, trackout or other issues. No complaints received by division. Approved.
|
ESC11-00879
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 1:40:29 PM | | PART |
|
|
Request to Jayo Homes to sweep gutter on Painted Rock.
No trackout or discharges leaving subdivsion. DI bags and perimeter wattles installed.
|
ESC16-00353
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 1:39:36 PM | P | PASS |
|
|
United Water recently installed water lines. No activity at time of inspection. Hillside sediment control wattles are installed and mostly trenched in. Rock construction entrance installed and permit sign posted with SWPPP info.
No corrections requested. Hillsides between parces have been tracked and some are vegetating on their own.
|
ESC16-00209
| Site Preparation | 6/24/2016 | 6/24/2016 | 6/24/2016 1:23:09 PM | P | PASS |
|
|
Work previously started under demolition ESC permit, ESC16-00787. Receiving DIs have inlet protection, site is has construction fencing and is aware of fugitive dust requirements. No violations.
Approved.
|
ESC16-00787
| Site Final | 6/24/2016 | 6/24/2016 | 6/24/2016 1:21:37 PM | P | PASS |
|
|
Demo phase complete and all materials removed. No trackout or accumulations around perimeter. Work now covered with ESC16-00209
|
ESC16-00805
| Site Preparation | 6/23/2016 | 6/24/2016 | 6/24/2016 11:50:07 AM | A | PASS |
|
|
Clint Phone #: ###-####
BMPs installed. Active projects in compliance. Approved for construction.
|
ESC16-00665
| Site Preparation | 6/23/2016 | 6/24/2016 | 6/24/2016 11:49:52 AM | A | PASS |
|
|
Clint Phone #: ###-####
BMPs installed. Active projects in compliance. Approved for construction.
|
ESC16-00664
| Site Preparation | 6/23/2016 | 6/24/2016 | 6/24/2016 11:49:14 AM | A | PASS |
|
|
Clint Phone #: ###-####
BMPs installed. Active projects in compliance. Approved for construction.
|
ESC16-00663
| Site Preparation | 6/23/2016 | 6/24/2016 | 6/24/2016 11:48:38 AM | A | PASS |
|
|
Clint Phone #: ###-####
BMPs installed. Active projects in compliance. Approved for construction.
|
ESC12-00403
| Complaint Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 11:46:48 AM | P | PEND |
|
|
Anonymous trackout complaint of "mud all over 9th Street"
Simplot WHQ contractor operating in ROW on 9th Street to connect to sewer. Cutting into road and installing sewer manhole structures. Trackout from loading trucks is being swept manually by broom. Will need to use street sweeper at end of project. Down gradient stormdrains on 9th and Myrtle have sediment filter bags installed. No discharges at time of inspection.
Requested that dewatering be reported and monitored. Will likely direct water back to onsite dewatering system, which may actually prevent the need for dewatering.
9th Street is closed til Sunday, and potentially till Wednesday.
|
ESC14-01063
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 10:40:21 AM | | PASS |
|
|
No recent changes or activity. BMPs installed, lots have been regraded. No SFH construction yet. No corrections at this time. Hillsides above lots have vegetated well over 70%
|
ESC14-00886
| General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 10:25:36 AM | | PASS |
|
|
|
ESC15-01414
| Aging Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 8:56:48 AM | | PASS |
|
|
Work complete. Subdivision BMPs installed and townhomes on west end of phase I are in progress. See ESC14-01083 for main permit
|
ESC15-01414
| DOC - Permit Finaled | 6/24/2016 | 6/24/2016 | 6/24/2016 8:56:28 AM | P | PASS |
|
|
|
ESC15-01415
| Aging Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 8:56:07 AM | | PASS |
|
|
Work complete. Subdivision BMPs installed and townhomes on west end of phase I are in progress. See ESC14-01083 for main permit
|
ESC15-01415
| DOC - Permit Finaled | 6/24/2016 | 6/24/2016 | 6/24/2016 8:55:45 AM | P | PASS |
|
|
|