Inspections for the day of: Thursday, June 25, 2015.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00006 General Inspection6/25/20156/25/20156/25/2015 4:43:55 PMPPASS
WIP. Frame is up, though exterior shell still under construction. No trackout to street, trash and materials are contained; permit sign posted with contact details on security fencing which surrounds the project. Approved.
ESC15-00024 General Inspection6/24/20156/25/20156/25/2015 4:06:27 PMAPART
WIP. No discharges or hillside rills/gullys on or around foothills SFH project.

Correction needed:
sweep up loose sediment and dirt on the sidewalk and gutter in front of house.

Verbal correction request given to Westminster RP
ESC14-00932 Site Final6/25/20156/25/20156/25/2015 3:11:57 PMPPASS
Parking lot and site improvement project is complete. Area between project and Gowen Road has been stabilized with tacifier and mulch. Wattles will remain on site till full revegetation. No further ESC inspections needed, site in very good condition.
ESC14-00526 Site Final6/25/20156/25/20156/25/2015 2:36:26 PMPPART
(This activity was added in error so we have changed the case status back to Issued.)

Project complete. No loose dirt or disturbed area. Need to remove DI bag that was installed in front of site. Notified Syman Co. who was contracted for SWPPP.
ESC13-00213 General Inspection6/25/20156/25/20156/25/2015 2:19:43 PM PASS
ESC14-00788 Random Inspection6/25/20156/25/20156/25/2015 2:07:37 PMPPASS
No activity at time of inpection. Warm Springs along project frontage does not have significant amounts of trackout or loose sediment. No runoff or discharges from site. No fugitive dust observed.

Roads and gutters have been completed, the entranceway is in progress with installation of Pavedrain permeable pavers has been staged &prepped but not yet installed. RP Lance informed me that the bricks are defective and either a new shipment is coming or will find alternative product.
ESC15-00094 General Inspection6/19/20156/25/20156/25/2015 1:35:18 PMAPASS
Follow inspection from corrections issued 6/19

Entrance has been swept as requested. No activity. No dust or other issues observed. Approved.
ESC13-00230 General Inspection6/25/20156/25/20156/25/2015 12:02:15 PM PASS
ESC14-00962 Site Final6/25/20156/25/20156/25/2015 11:13:48 AMPPASS
Landscaping and stabilization at renovated Station 17 is complete and sidewalks and gutters have been swept. BLD finaled on TO. No ESC issues that need correcting. ESC permit finaled.
ESC15-00043 Aging Inspection6/25/20156/25/20156/25/2015 11:01:18 AM PASS
SFH near completion. Frame is up and exterior painted. Needs landscaping and final site cleanup. No trackout or sediment runoff occuring.
ESC14-00418 General Inspection6/25/20156/25/20156/25/2015 10:50:21 AM PASS
Construction and landscaping complete. Temporary perimeter BMPs removed after revegetation/stabilization of hillsides.

ESC permit conditions satisfied. All other permits finaled.
ESC14-00418 DOC - Permit Finaled6/25/20156/25/20156/25/2015 10:48:12 AMPPASS
ESC15-00623 General Inspection6/25/20156/25/20156/25/2015 10:31:28 AMAPASS
ESC permit sign posted. Perimeter gator guard wattle installed and working effectively. Some minor trackout on sidewalk can be swept this week during housekeeping..

No sediment leaving site. Approved.
ESC14-00273 General Inspection6/25/20156/25/20156/25/2015 10:27:19 AM PASS
Landscaping and stabilization complete. Temp BMPs removed and perimeter areas of yard have had tacifier and seed applied. ESC permit conditions satisfied.
ESC14-00273 DOC - Permit Finaled6/25/20156/25/20156/25/2015 10:26:29 AMPPASS
ESC15-00541 General Inspection6/25/20156/25/20156/25/2015 10:22:23 AMAPASS
Grading complete, no vertical construction has occurred. Does not look like utilities have been stubbed in yet. Some sand has been added to lower terraces and the terraces have been track perpendicular to the slopes properly. No issues at site.
ESC13-01167 General Inspection6/25/20156/25/20156/25/2015 9:57:41 AM PASS
Revegetation in progress as noted previous inspection. No rills or issues observed on the slope. Approved.
ESC11-00192 General Inspection6/25/20156/25/20156/25/2015 9:56:02 AM PASS
No hillside erosion, fugitive dust, or discharges observed from active projects. Open areas have revegetated well or are compacted dirt/sand.
ESC13-00193 General Inspection6/25/20156/25/20156/25/2015 9:38:41 AM PASS
No activity at site. Perimeter BMPs (silt fence and wattles) are installed with no significant breaches. Culdesac is free of loose sediment. Inlet bag has been recently emptied and reinstalled. No corrections necessary at this time.
ESC15-00052 Aging Inspection6/25/20156/25/20156/25/2015 9:06:21 AM PASS
Sidewalk project complete. No ESC issues at site, permit closed.
ESC15-00052 DOC - Permit Finaled6/25/20156/25/20156/25/2015 9:05:43 AMPPASS