Inspections for the day of: Monday, June 25, 2018.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00938 General Inspection6/22/20186/25/20186/27/2018 3:55:28 PMPCANC
ESC17-01515 BMP Violation6/25/20186/25/20186/25/2018 4:52:47 PMPFAIL
No concrete washout facility provided. Uncontained dumping is occuring.
ESC17-00535 General Inspection6/25/20186/25/20186/25/2018 2:47:59 PM PASS
ESC18-00558 Site Preparation6/25/20186/25/20186/25/2018 2:01:26 PMPPART
No site preparation inspection requested. Lots excavated and foundations in progress.

Two adjacent sites by same contractor. Permit sign posted, lined concrete washout and construction entrance installed. Subdivsion stormdrains have sediment bags.

No trackout, discharge, or fugitive dust at sites.
After backfill is conducted, will need to re-install perimter controls on the west lot. Follow up inspeciton scheduled.

Will remind GC and excavator of site preparation requirement.
ESC18-00392 Site Preparation6/25/20186/25/20186/25/2018 2:01:14 PMPPART
No site preparation inspection requested. Lots excavated and foundations in progress.

Two adjacent sites by same contractor. Permit sign posted, lined concrete washout and construction entrance installed. Subdivsion stormdrains have sediment bags.

No trackout, discharge, or fugitive dust at sites.
After backfill is conducted, will need to re-install perimter controls on the west lot. Follow up inspeciton scheduled.

Will remind GC and excavator of site preparation requirement.
ESC18-00114 Tracking Control6/25/20186/25/20186/25/2018 1:18:12 PMPFAIL
Trackout from unpaved driveway observed. Will check back for clean up.
ESC18-00302 General Inspection6/25/20186/25/20186/25/2018 1:16:13 PMPPASS
WIP on frame and interior. Trash contained, permit sign posted. No trackout or discharges.
ESC17-00249 Site Final6/25/20186/25/20186/25/2018 12:48:27 PMPPASS
ESC permit conditions satisfied.

Site Final inspections and monitoring of landscaping and vegetation for Tablerock Sub will occur on ESC16-00945
ESC17-00215 Site Final6/25/20186/25/20186/25/2018 12:47:20 PMPPASS
Townhomes complete and landscaped. Remaining ESC inspecitons conducted under main site permit ESC16-00945.
ESC16-00945 General Inspection6/25/20186/25/20186/25/2018 12:46:24 PMPPASS
Exterior construction and landscaping is now complete. Sand window drainage added at site entrance as requested.

Flexterra hydroseed with tackifier has been applied to the steeper portions of the bank between access drive and fence line of homes to the south.

Construction trash and debris has been cleaned up.

Will keep permit open for monitoring vegetation. PW bond is up for review/expiration in July.
ESC17-00249 General Inspection6/25/20186/25/20186/25/2018 12:45:34 PM PASS
Exterior construction and landscaping is now complete. Sand window drainage added at site entrance as requested.

Flexterra hydroseed with tackifier has been applied to the steeper portions of the bank between access drive and fence line of homes to the south.

Construction trash and debris has been cleaned up.

Will keep permit open for monitoring vegetation. PW bond is up for review/expiration in July.
ESC14-00788 Aging Inspection6/25/20186/25/20186/25/2018 12:02:34 PM PASS
No subdivision activity. Storm drains have sediment protection. Lots and open areas are well vegetated. Frontage landscaping complete. No runoff /discharges from subdivsion.

Two new SFH excavations now in progress.
ESC17-01298 General Inspection6/22/20186/25/20186/25/2018 11:46:43 AMAPART
Wattles are now trenched and staked in at proper intervals as requested.

The overlaps have been installed on top of each other rather than side by side, leaving a gap in wattle perimeter.

Notified Mike with Provision landscaping of the change needed.
ESC17-00679 General Inspection6/25/20186/25/20186/25/2018 11:38:55 AM PASS
Painting and landscaping in progress. Subdivision BMPs installed.
ESC17-00780 General Inspection6/25/20186/25/20186/25/2018 11:32:17 AM CANC
ESC16-00242 General Inspection6/25/20186/25/20186/25/2018 11:28:51 AM PASS
Perimeter inspeciton.

No fugitive dust observed at time of inspection, construction access within Micron campus is clean and free of trackout. South storm water pond is filled, no offsite discharge.

Lined berm around construction staging area and parking is installed. No disharges to Micron parking lots and lanes observed.

No corrections requested.
ESC18-00006 General Inspection6/25/20186/25/20186/25/2018 11:26:06 AMPPASS
Vertical construction in progress. No trackout, discharges, or fugitive dust observed from site perimeter. Construction track pad entrance and sediment controls installed on storm drains.

No corrections requested.
ESC17-01200 Random Inspection6/25/20186/25/20186/25/2018 10:59:09 AMPPASS
Gowen Industrial park buildings and site improvements are in progress.

SWPPP and Boise ESC permit sign posted on Eisenman and Beechcraft. No trackout from site entrances, concrete washout facility located on site. MS4 stormdrains have sediment protection.

No corrections requested. See also ESC17-01043
ESC17-01043 Random Inspection6/25/20186/25/20186/25/2018 10:58:49 AMAPASS
Gowen Industrial park buildings and site improvements are in progress.

SWPPP and Boise ESC permit sign posted on Eisenman and Beechcraft. No trackout from site entrances, concrete washout facility located on site. MS4 stormdrains have sediment protection.

No corrections requested. See also ESC17-01200
ESC17-00203 General Inspection6/25/20186/25/20186/25/2018 10:51:34 AM PASS
WIP on interior. Exterior shell, parking lots, and stormwater pond are complete.

Site final follow up scheduled for 7/10 to request that DI bags installed on Elite be removed and to check for disturbed areas or stockpiles no stabilized.

No trackout, fugitive dust, or discharges observed.
ESC16-00438 Aging Inspection6/25/20186/25/20186/25/2018 9:35:11 AM PASS