PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, June 26, 2019
.
Number of inspections:
27
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00406
Site Final
6/24/2019
6/26/2019
7/1/2019 4:13:50 PM
A
CANC
ESC19-00759
Site Preparation
6/26/2019
6/26/2019
6/28/2019 3:32:27 PM
P
PASS
Onsite storm drain has sediment protection installed. Surrounding hardscape and vegetation preserved. No trackout or other issues
ESC19-00300
Site Preparation
6/26/2019
6/26/2019
6/28/2019 3:32:14 PM
P
PASS
Onsite storm drain has sediment protection installed. Surrounding hardscape and vegetation preserved. No trackout or other issues
ESC18-01002
General Inspection
6/26/2019
6/26/2019
6/27/2019 4:28:05 PM
FAIL
Need to sweep up along San Jose
Will send correction to RP
ESC18-00983
General Inspection
6/26/2019
6/26/2019
6/27/2019 4:27:15 PM
CANC
ESC16-00225
General Inspection
6/26/2019
6/26/2019
6/27/2019 1:34:49 PM
PASS
ESC17-01749
General Inspection
6/26/2019
6/26/2019
6/27/2019 12:19:49 PM
CANC
ESC17-00078
General Inspection
6/26/2019
6/26/2019
6/27/2019 11:38:40 AM
PART
No trackout or discharges from subdivision. Utilizing lined concrete washout pit. Storm drains have sediment protection. No significant amounts of loose trash or windblown debris/dust.
Correction:
- remove damage orange silt fence and replace with sf or wattle.
- check inlets on east end of subdivision for maintenance/replacement. Some are over 50% full.
ESC18-01244
BMP Violation
6/25/2019
6/26/2019
6/26/2019 4:41:23 PM
P
FAIL
Site not cleaned as requested. Extension granted because onsite crew member said they intend to clean it all up today and are behind schedule. Follow up scheduled, no further extensions on this request..
ESC18-01675
Complaint Inspection
6/26/2019
6/26/2019
6/26/2019 4:06:24 PM
P
PEND
complaint regarding unfinished DRH requirements for the 4 homes 1###-#### S. Kerr
notified planner, case pending. Permit open for upcoming alley paving.
ESC18-01714
DOC - Permit Finaled
6/26/2019
6/26/2019
6/26/2019 4:04:57 PM
P
PASS
ESC18-01701
DOC - Permit Finaled
6/26/2019
6/26/2019
6/26/2019 4:04:44 PM
P
PASS
ESC18-01676
DOC - Permit Finaled
6/26/2019
6/26/2019
6/26/2019 4:04:36 PM
P
PASS
ESC18-00809
Aging Inspection
6/26/2019
6/26/2019
6/26/2019 3:41:11 PM
CANC
ESC18-01472
Site Final
6/26/2019
6/26/2019
6/26/2019 3:40:29 PM
P
PASS
ESC permit conditions satisfied.
ESC18-01470
Site Final
6/26/2019
6/26/2019
6/26/2019 3:40:17 PM
P
PASS
ESC permit conditions satisfied.
ESC18-01473
Site Final
6/26/2019
6/26/2019
6/26/2019 3:40:05 PM
P
PASS
ESC permit conditions satisfied.
ESC18-01468
Site Final
6/26/2019
6/26/2019
6/26/2019 3:39:53 PM
P
PASS
ESC permit conditions satisfied.
ESC18-00992
General Inspection
6/24/2019
6/26/2019
6/26/2019 3:34:27 PM
P
PASS
Homes on Robert are complete, landscaped, cleaned. No temporary BMPs remaining. ESC permit conditions satisfied.
ESC18-00992
DOC - Permit Finaled
6/26/2019
6/26/2019
6/26/2019 3:33:39 PM
P
PASS
ESC19-00376
Conference
6/26/2019
6/26/2019
6/26/2019 2:17:53 PM
P
DONE
Work conducted prior to issued ESC permits for scope of work completed. Corrections needed at site and site preparation inspection must be scheduled after paying re-inspection fee charged.
ESC18-01022
General Inspection
6/25/2019
6/26/2019
6/26/2019 10:27:11 AM
A
PEND
Site is mobilizing to install utiilities, complete Eyrie Way, and widen and complete Arrow Villa extension to Winter Camp to finish phase 10.
ESC corrections in progress, discussed with site RP who will notify operators and developer:
- install/improve lower and upper construction entrances with 50 ft min length and heavy duty rock. Sweep loose dust at entrances regularly to prevent windblow fugitive dust.
- ensure that water truck is onsite today to control fugitve dust as necessary along haul roads and on material stockpiles.
- post new ESC sign on both upper and lower entrance.
Other comments:
- all construction traffic that can safely enter site from the lower entrance or Arrow Crest should do so to avoid using Arrow Villa. Employees should park at bottom entrance, project managers should travel through construction site.
- Arrow Villa extension should remain closed to the public and other thru traffic until Eyrie Way is open.
ESC18-00583
Aging Inspection
6/26/2019
6/26/2019
6/26/2019 8:23:25 AM
CANC
ESC18-00564
Aging Inspection
6/26/2019
6/26/2019
6/26/2019 8:23:00 AM
CANC
ESC18-00467
General Inspection
6/26/2019
6/26/2019
6/26/2019 8:20:24 AM
CANC
ESC16-01395
General Inspection
6/26/2019
6/26/2019
6/26/2019 8:19:00 AM
CANC
ESC17-00455
General Inspection
6/26/2019
6/26/2019
6/26/2019 8:18:44 AM
CANC