Inspections for the day of: Wednesday, June 29, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00507 General Inspection6/29/20166/29/20167/1/2016 12:23:45 PMPCANC
ESC16-00548 General Inspection6/29/20166/29/20166/30/2016 4:04:50 PMPPASS
Near completion. Permit sign posted. No trackout or sediment runoff. Early messes cleaned up.
ESC15-00541 General Inspection6/29/20166/29/20166/30/2016 3:59:20 PM CANC
ESC15-01408 General Inspection6/29/20166/29/20166/29/2016 4:31:17 PM PASS
WIP. Minor trackout to Orchard, no MS4 in area. Airport hangar frame is complete, parking lot area paved. No fugitive dust or discharges observed. Trash and materials are contained on site.
ESC15-01078 Aging Inspection6/29/20166/29/20166/29/2016 3:38:28 PM PART
Home is complete and landscaped.

ESC permit to remain open. 2 DI bags on Old Sport are full and need to be removed to final permit. Will put in request to CBH. Will check back next week.
ESC14-00788 General Inspection6/29/20166/29/20166/29/2016 3:08:46 PMAPASS
No activity, no SFH construction in Privada yet. Lots are for sale. All BMPs (DI bags, hillside wattles)are installed and in good condition. Disturbed slopes are in process of revegetating. No violations. SWPPP box on site.
ESC15-01579 General Inspection6/29/20166/29/20166/29/2016 3:07:07 PMPPASS
WIP. No trackout from construction entrance. Inlet filter bags installed on MS4. No sediment or other material crossing silt fence perimeter & Greenbelt. No fugitive dust at time of inspection, water truck on site.

No immediate corrections issued but will request that straw wattle utilized in dewatering operation along Walling Creek bank area east of lift station should be removed.
ESC15-01397 General Inspection6/29/20166/29/20166/29/2016 1:59:16 PM PASS
WIP on major TI. No trackout or discharges. Clean staging area.
ESC15-01398 General Inspection6/29/20166/29/20166/29/2016 9:52:36 AM PASS
Tennant improvement complete. All permits finaled. No ESC corrections needed.
ESC15-01398 DOC - Permit Finaled6/29/20166/29/20166/29/2016 9:51:52 AMPPASS
ESC13-00193 General Inspection6/29/20166/29/20166/29/2016 9:35:46 AM PASS
ESC15-01256 General Inspection6/29/20166/29/20166/29/2016 8:59:45 AM PASS
ESC15-00339 General Inspection6/29/20166/29/20166/29/2016 8:31:54 AMAPASS
WIP on storage unit. Construction entrance and DI protection installed on Gage. No loose sediment on Orchard sidewalk. Site is in good condition
ESC14-00588 Conference6/29/20166/29/20166/29/2016 12:00:00 AMADONE
Notified to change RP from Kevin to Cory. Cory onsite and certified RP. Approved