PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, June 3, 2020
.
Number of inspections:
15
Percentage of inspections complete:
80 %
Percentage of inspections not complete:
20 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC19-00971
Site Final
5/22/2020
5/28/2020
P
ESC18-01227
General Inspection
5/22/2020
5/28/2020
P
MIS20-00070
ESC-Conference
5/28/2020
6/2/2020
P
ESC18-01447
General Inspection
6/2/2020
6/3/2020
6/8/2020 5:38:02 PM
P
FAIL
check for perimter controls and DI bag clean up
DI bag was replace and a new gator guard perimeter control was installed on low corner of lot.
Flow was too great for loosely installed wattle and DI bag is now full of dirt from the site.
Correction request to RP James to replace wattle with silt fence or add additional wattles/check dams to slow the flow of the runoff from the roof and to maintain the sediment bag....
ESC18-01121
General Inspection
6/3/2020
6/3/2020
6/8/2020 5:35:53 PM
PASS
ESC19-00574
General Inspection
6/2/2020
6/3/2020
6/8/2020 5:34:49 PM
P
PASS
No trackout from site. Perimeter controls installed. No requests at this time
ESC19-00557
General Inspection
6/3/2020
6/3/2020
6/3/2020 2:58:05 PM
PASS
ESC19-00771
Aging Inspection
6/3/2020
6/3/2020
6/3/2020 2:57:16 PM
CANC
ESC19-01027
Aging Inspection
6/3/2020
6/3/2020
6/3/2020 2:37:23 PM
CANC
ESC19-01027
DOC - Permit Finaled
6/3/2020
6/3/2020
6/3/2020 2:37:18 PM
P
PASS
ESC19-00995
General Inspection
6/3/2020
6/3/2020
6/3/2020 2:33:06 PM
CANC
ESC19-01269
Site Final
6/3/2020
6/3/2020
6/3/2020 2:27:50 PM
P
PASS
Work complete. Site cleaned and landscaped. No ESC requests
ESC20-00167
General Inspection
6/3/2020
6/3/2020
6/3/2020 2:06:31 PM
P
PASS
WIP. Excavation contained by grass and curbing above grade of disturbance. Dumpster on site. NO trackout, or loose dirt in parking area.
ESC20-00810
Site Preparation
6/2/2020
6/3/2020
6/3/2020 1:59:43 PM
P
PASS
Permit sign provided to contractor. Work area is the playground, which is surrounded by grass and park features. Will use exsting concrete path for access from Phillipi Street from the east of playground.
Will need concrete washout containment, preserve existing features to remain including tree protection as needed.
Approved for construciton.
ESC19-00932
Site Final
6/2/2020
6/3/2020
6/3/2020 1:57:56 PM
P
PASS
Project complete. No temp BMPs to remove. Area stabilized