Inspections for the day of: Wednesday, June 3, 2020.
Number of inspections: 15
Percentage of inspections complete: 80 %
Percentage of inspections not complete: 20 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00971 Site Final5/22/20205/28/2020 P 
ESC18-01227 General Inspection5/22/20205/28/2020 P 
MIS20-00070 ESC-Conference5/28/20206/2/2020 P 
ESC18-01447 General Inspection6/2/20206/3/20206/8/2020 5:38:02 PMPFAIL
check for perimter controls and DI bag clean up

DI bag was replace and a new gator guard perimeter control was installed on low corner of lot.

Flow was too great for loosely installed wattle and DI bag is now full of dirt from the site.

Correction request to RP James to replace wattle with silt fence or add additional wattles/check dams to slow the flow of the runoff from the roof and to maintain the sediment bag....
ESC18-01121 General Inspection6/3/20206/3/20206/8/2020 5:35:53 PM PASS
ESC19-00574 General Inspection6/2/20206/3/20206/8/2020 5:34:49 PMPPASS
No trackout from site. Perimeter controls installed. No requests at this time
ESC19-00557 General Inspection6/3/20206/3/20206/3/2020 2:58:05 PM PASS
ESC19-00771 Aging Inspection6/3/20206/3/20206/3/2020 2:57:16 PM CANC
ESC19-01027 Aging Inspection6/3/20206/3/20206/3/2020 2:37:23 PM CANC
ESC19-01027 DOC - Permit Finaled6/3/20206/3/20206/3/2020 2:37:18 PMPPASS
ESC19-00995 General Inspection6/3/20206/3/20206/3/2020 2:33:06 PM CANC
ESC19-01269 Site Final6/3/20206/3/20206/3/2020 2:27:50 PMPPASS
Work complete. Site cleaned and landscaped. No ESC requests
ESC20-00167 General Inspection6/3/20206/3/20206/3/2020 2:06:31 PMPPASS
WIP. Excavation contained by grass and curbing above grade of disturbance. Dumpster on site. NO trackout, or loose dirt in parking area.
ESC20-00810 Site Preparation6/2/20206/3/20206/3/2020 1:59:43 PMPPASS
Permit sign provided to contractor. Work area is the playground, which is surrounded by grass and park features. Will use exsting concrete path for access from Phillipi Street from the east of playground.

Will need concrete washout containment, preserve existing features to remain including tree protection as needed.

Approved for construciton.
ESC19-00932 Site Final6/2/20206/3/20206/3/2020 1:57:56 PMPPASS
Project complete. No temp BMPs to remove. Area stabilized