ESC16-01108
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 4:06:30 PM | | PASS |
|
|
WIP on SFHs in Whitecloud by Hayden Homes. No significant trackout to streets. DI bags installed on storm drains. Lined concrete washout pit being used at west end of Azure. No corrections requested.
|
ESC17-00470
| Complaint Inspection | 6/29/2017 | 6/30/2017 | 6/30/2017 4:01:06 PM | P | PEND |
|
|
Dust complaint
No activity at time of inspection. No equipment operating. Water trailer is still onsite. NO wind blown dust.
On Thursday developer Jim responded to request by having a full time employee pulling the water trailer.
|
ESC15-01004
| Complaint Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 3:24:44 PM | P | PEND |
|
|
Report of no fugitive dust control
No dust control at time of arrival. Front end hoist driving from alley on Myrtle to Capitol creating dust. Lots of loose dirt in staging lanes and at perimeter. RP on permit no longer on site, no new contact provided.
Dustin with Tuffy did order water truck, push broom sweeping of the drive lane, and told equipment operators to drive slower.
Will check back Monday on conditions. Storm drain system on Capitol/Myrtle has inlet protection and will be retrofit next week.
Water truck arrived onsite before I had left the area.
|
ESC15-01175
| DOC - Permit Finaled | 6/30/2017 | 6/30/2017 | 6/30/2017 3:12:19 PM | P | PASS |
|
|
|
ESC16-01379
| Aging Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 1:10:52 PM | | CANC |
|
|
|
ESC17-00190
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:40:45 PM | P | PASS |
|
|
Note: initial inspections for this development were entered under ESC16-01431, which is now Finaled. Remaining inspections will be conducted under this permit, which is attached to hillside GRD permit.
SWPPP binder and ESC permit sign posted on site. SWPPP inspection reports have been completed, currently inspecting every 14 days. No trackout or sediment runoff.
Hillsides has been horizontally tracked and mulch application has been applied. Too hot for revegetation currently,, will check on schedule. No hillside wattles have been installed as indicated on the ESC site plan.
No immediate corrections, need to review hillside erosion controls to be implemented (slope interupting wattles, revegetation)
|
ESC16-01431
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:39:04 PM | P | PASS |
|
|
Note: remaining inspections shall be entered under ESC17-00190, which is connected to the hillside zone GRD permit for Hackberry North II. This permit shall be finaled.
SWPPP binder and ESC permit sign posted on site. SWPPP inspection reports have been completed, currently inspecting every 14 days. No trackout or sediment runoff.
Hillsides has been horizontally tracked and mulch application has been applied. Too hot for revegetation currently,, will check on schedule. No hillside wattles have been installed as indicated on the ESC site plan.
No immediate corrections, need to review hillside erosion controls to be implemented (slope interupting wattles, revegetation)
|
ESC16-01431
| DOC - Permit Finaled | 6/30/2017 | 6/30/2017 | 6/30/2017 12:38:50 PM | P | PASS |
|
|
|
ESC15-00853
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:34:10 PM | P | PART |
|
|
WIP on townhomes. No trackout or discharges leaving subdivision to Hill Road. Private storm drains on Hill Terrace has sediment protection.
Trash at each duplex is contained.
Corrections needed: - stake in wattles so they are secure - clean gutters in front of DI bags - need to provide a designated washout facility or pit for upcoming projects.
No immediate corrections, will follow up next week.
|
ESC16-01335
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:28:34 PM | | PASS |
|
|
|
ESC16-01334
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:28:23 PM | | PASS |
|
|
|
ESC16-01333
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:28:12 PM | | PASS |
|
|
|
ESC16-01332
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 12:27:39 PM | | PASS |
|
|
|
ESC16-00500
| DOC - Permit Finaled | 6/30/2017 | 6/30/2017 | 6/30/2017 12:26:29 PM | P | PASS |
|
|
Earth disturbance phase complete. BLD open for remainder. No temp BMPs installed, no trackout or issues. ESC permit finaled.
|
ESC15-00857
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 11:40:16 AM | | PASS |
|
|
BMPs installed and maintained. NO trackout and no discharges. Hillside vegetation growing well.
Below Winter Camp a new tractor road has been cut to access basin area. Unclear what the activity is for, but it is outside the limits of Eyrie Canyon #9 and may require addition of acreage to permit and erosion & sediment controls installed. Will follow up on issue.
|
ESC16-01370
| General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 11:04:52 AM | P | PASS |
|
|
WIP. No trackout or discharges from site. Not yet landscaped. Will need to remove the temp. DI sediment bag 2 blocks downhill in order to get ESC final.
|
ESC16-00770
| BMP Violation | 6/30/2017 | 6/30/2017 | 6/30/2017 10:54:38 AM | P | FAIL |
|
|
MS4 DI bags left in storm drains at bottom of culdesac. Second request issued to RP. RP stated that builder is to remove bags.
Will check back, will need to charge re-inspections fees until the temporary BMPs are gone.
|
ESC15-01322
| Site Final | 6/28/2017 | 6/30/2017 | 6/30/2017 9:14:21 AM | P | NR |
|
|
Project stabilized and site development near full completion.
Need to remove temporary DI bag at 10th & Idaho to final ESC permit.
|
ESC16-01383
| Aging Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 7:30:36 AM | | CANC |
|
|
|