PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, June 4, 2019
.
Number of inspections:
12
Percentage of inspections complete:
75 %
Percentage of inspections not complete:
25 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00020
General Inspection
5/29/2019
5/29/2019
P
post rainfall inspection
ESC18-00109
General Inspection
5/30/2019
5/30/2019
ESC17-00791
BMP Violation
5/29/2019
5/31/2019
A
ESC18-01675
General Inspection
6/3/2019
6/4/2019
6/6/2019 2:56:48 PM
P
FAIL
Correction request to have Kerr Street swept on both sides of road and gutters and to focus on area where landscaping materials were staged.
Landscapers to finish tomorrow or this weeekend, street sweeper Monday or Tuesday, and then gutters by end of next week.
ESC19-00123
General Inspection
5/30/2019
6/4/2019
6/5/2019 10:47:32 AM
A
PEND
No silt fence installed along southern perimeter as requested. Framing in progress
ESC18-00803
General Inspection
6/4/2019
6/4/2019
6/5/2019 10:22:08 AM
CANC
ESC18-00641
General Inspection
6/4/2019
6/4/2019
6/5/2019 9:11:00 AM
PEND
ESC19-00444
Site Preparation
6/4/2019
6/4/2019
6/4/2019 2:14:51 PM
P
PASS
please call Magnum Phone #: ###-####
Permit sign posted. RP onsite with ESC plan.
Installing silt fence to preserve clearing limits above excavation area rather than as a sediment barrier. RP to leave grass buffer to the right of the site access, additional wattle onsite to install after excavation.
Using large Outpak for washout containment.
Approved for construction.
ESC18-00264
General Inspection
6/4/2019
6/4/2019
6/4/2019 2:14:02 PM
PASS
Home completed. Revegetation. Need to remove sediment controls from storm drain at Sherman and Mockbee. Adajacent house still not stabilized.
ESC19-00443
BMP Violation
5/28/2019
6/4/2019
6/4/2019 8:32:58 AM
P
PEND
ESC18-00006
General Inspection
6/4/2019
6/4/2019
6/4/2019 8:32:42 AM
PEND
to be inspected with fab 51 final
ESC19-00396
Site Preparation
6/3/2019
6/4/2019
6/3/2019 4:59:44 PM
A
PART
Permit posted, construction entrance installed. Vegetation has been preserved around the clearing limits.
Perimeter silt fence installed but is not properly trenched.
Correction request issued to excvator Angel (2088666030):
- trench in silt fence per installation details.
- reminder to Angel regarding site preparation inspections