PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, June 5, 2018
.
Number of inspections:
15
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-01253
Site Final
6/4/2018
6/5/2018
6/8/2018 12:19:49 PM
P
NR
Homeowner in process of landscaping. No sediment runoff observed. All other permits finaled. Not ready for ESC final.
ESC14-01083
General Inspection
6/5/2018
6/5/2018
6/8/2018 11:27:18 AM
PASS
Phase II near completion. BMPs installed. No trash issues observed.
ESC17-00286
Aging Inspection
6/5/2018
6/5/2018
6/6/2018 4:19:30 PM
PASS
No activity at site. No trackout or ESC violations. RP stated he will be finishing the common driveway prioer to another builder doing the SFHs.
Notified RP Keith that Code Enforcement posted a 10 day notice to abate weeds on May 30th. He said will notify lot owners to weed whack/clean up.
ESC16-01650
Complaint Inspection
6/5/2018
6/5/2018
6/6/2018 12:19:08 PM
A
FAIL
Complaint regarding runoff and sediment deposition on section of Greenbelt (also under construction)
Corrections needed at site:
- clean up eroded sediment on pathway from subdivsion to Greenbelt. Install drainage controls to direct water on north side of path against vegetated hill
- remove temporary controls on slope. Slope is vegetated. This includes silt fence(SF) and wattles. Clean up silt and sand behind section of SF east of pathway below homes in progress.
Verbal correction request to Steve with CMG. He will respond with corrective action plan. CMG has closed the CGP and PW has released bond. ESC permit conditions not yet satisfied.
MIS18-00216
ESC-Conference
6/5/2018
6/5/2018
6/6/2018 8:28:02 AM
P
FAIL
Correction request posted to sweep up street, install sediment protection on receiving storm drain. Posted Monday 6/4. No response from Urban Escapes.
Project appears to be a landscaped fish pond.
ESC17-00774
General Inspection
6/5/2018
6/5/2018
6/5/2018 4:34:51 PM
PEND
Creek channel is now open. Rip rap channel at Warm Springs by-pass was rinsed prior to allowing flow to river. Rinse water was dewater to adjacent vegetation.
No repair on gully at Parkcenter and Harris Ranch Road.
ESC15-01288
General Inspection
6/5/2018
6/5/2018
6/5/2018 4:27:17 PM
PASS
ESC16-01720
General Inspection
6/5/2018
6/5/2018
6/5/2018 4:27:08 PM
CANC
ESC16-01720
Site Final
6/5/2018
6/5/2018
6/5/2018 4:26:00 PM
P
PASS
Construction complete. All temporary storm drain bags have been removed. No ESC corrections.
ESC17-01119
Site Final
6/5/2018
6/5/2018
6/5/2018 4:25:32 PM
P
PASS
Home complete and landscaped. Temp BMPs for subdivision to remain installed.
ESC16-01457
Conference
6/4/2018
6/5/2018
6/5/2018 12:57:02 PM
P
FAIL
Correction requests:
- clean up sediment and sand on sidewalk and gutter
- install perimeter wattles
- install erosion controls on the lot to slow runoff and divert away from road.
- get permits and approvals for work completed and planned work.
1 week given to clean up and begin installation of temporary controls installed to prevent further sediment runoff.
ESC04-01476
DOC - Permit Finaled
6/5/2018
6/5/2018
6/5/2018 7:57:03 AM
P
PASS
ESC04-00571
DOC - Permit Finaled
6/5/2018
6/5/2018
6/5/2018 7:56:58 AM
P
PASS
ESC16-01027
Aging Inspection
6/5/2018
6/5/2018
6/5/2018 7:55:43 AM
CANC
ESC17-00446
General Inspection
6/5/2018
6/5/2018
6/5/2018 7:54:15 AM
CANC