ESC17-00824
| General Inspection | 6/6/2018 | 6/6/2018 | 6/11/2018 4:01:56 PM | | CANC |
|
|
|
ESC17-00508
| Aging Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 4:27:11 PM | | PASS |
|
|
WIP on framing. No ESC issues. Existing driveway and yard preserved.
|
ESC17-01112
| Site Final | 6/6/2018 | 6/6/2018 | 6/6/2018 4:09:25 PM | P | PASS |
|
|
Pathway complete. Disturbed areas stabilized. No stockpiles or temporary BMPs left on site. Warm Springs Creek permitted seperately, see ESC17-00774
ESC permit conditions satisfied.
|
ESC18-00020
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 3:40:45 PM | P | PART |
|
|
Corrections completed from compliance conference requests on 5/17:
- DI bags have been changed out and grates placed correct direction. Reminder to cut down upper side of fabric to allow entrance into drain. All inlets at bottom of hill will have the DI bags removed to prevent clogging and discharge off site. If a muddy event occurs the sump & interceptor will need cleaning.
- HHS has scheduled SFH site preparation inspections weekly as requested. Notified Les that this should continue every week there are new homes started.
- sedimentation basin and improved construction entrance have been installed on the top section @ Barber & Trapper.
- streets are clean and weekly street sweeping has occured. Some areas with landscaping dirt on road. Request that they sweep up dirt rather than rinse down the road. Any remaining dirt will be captured by the weekly street sweeping.
- two concrete washout bins with construction entrance on Hootowl.
Corrections that are not yet complete:
- fix rip rap channel to Council Springs Creek. Will fix channel lining and stabilize/armor sides to prevent further erosion and widening of channel.
- need to rake out rills/channels on area between rip rap channel and road going up to the subdivision. This should also be tracked or have tacifier and/or additional wattles or water bars to direct sheet flow into the the channel. Wattles have already been installed to try and prevent run-on to this spot from the road and sidewalk.
|
ESC18-00179
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 3:25:10 PM | P | PASS |
|
|
WIP on grading, fill, and compaction of old Warm Springs Creek Channel. No significant trackout, construction entrances installed, SWPPP info posted.
Water truck onsite, no fugitive dust at time of insepction. Witnessed some fugitive dust yesterday and issued reminder/warning to Rex with Knife River.
|
ESC17-00808
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 3:22:43 PM | | PASS |
|
|
Home complete, BLD finaled. Project landscaped. Subdivision BMPs to remain for active construction.
|
ESC17-00808
| DOC - Permit Finaled | 6/6/2018 | 6/6/2018 | 6/6/2018 3:21:57 PM | P | PASS |
|
|
|
ESC17-00618
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 3:07:04 PM | P | PART |
|
|
No trackout, discharges, or piles of loose trash. Permit signs posted.
Correction request: - sweep gutter on 15th Street - clean up sediment and debris around storm drain inlet bags - pick up loose trash and cigarette butts in gutter and sidewalks along 15th and Front.
Verbal correction request to RP Chad. He stated he will have it cleaned up today and tomorrow.
|
ESC18-00709
| Site Preparation | 6/6/2018 | 6/6/2018 | 6/6/2018 2:59:39 PM | P | PASS |
|
|
Les Phone #: ###-####
BMPs installed. RP on duty, will post ESC sign.
Approved for construction.
|
ESC18-00495
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 2:56:12 PM | P | PASS |
|
|
Follow up to site preparation.
Rock construction entrance installed as requested due to large parcel size. Workers using entrance as intended. No violations, approved.
|
ESC18-00629
| Site Preparation | 6/6/2018 | 6/6/2018 | 6/6/2018 2:48:27 PM | P | PASS |
|
|
Les Phone #: ###-####
Perimeter wattles installed. Subdivision strom drains have inlet protection; designated concrete washout area on Hootowl. Rear silt fence trenched in.
Approved for construction.
|
ESC16-01472
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 1:08:06 PM | P | PEND |
|
|
Co-inspection with ACHD ESC Inspector.
Corrections still in progress. Remaining corrections needed:
- re-install wattles properly. See ESC plan/IDEQ BMPs for construction details.
- if subcontractors need to access an area above the wattle, they must remove the wattle and then re-install rather than driving over them.
- pick up all loose lumber and trash around lower staging area.
- extend wattle sections in areas where runoff from the site could still flow to Logan in order to act as a perimeter sediment control, alternatively divert runoff to the onsite seepage bed if possible.
- excavator to dig retention area and or earthen berm along upper section or alternative solution to slow/divert runoff
- Recommendation to fill and compact the large gully off Shaw Mtn Rd. that directs water to site through the vegetated section by the tree. Block runoff access and install wattles or sand bags to direct water down the shoulder in less of a concentrated flow through the exposed area on your site.
Follow up Friday 6/8 PM
|
ESC15-01420
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 8:11:00 AM | | CANC |
|
|
|
ESC17-00909
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 7:56:35 AM | | PASS |
|
|
Apartment complex near completion, landscaping and final clean up in progress. All remaining inspections conducted under main site ESC permit, ESC17-00102
|
ESC17-00909
| DOC - Permit Finaled | 6/6/2018 | 6/6/2018 | 6/6/2018 7:56:28 AM | P | PASS |
|
|
|
ESC17-00908
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 7:56:21 AM | | PASS |
|
|
Apartment complex near completion, landscaping and final clean up in progress. All remaining inspections conducted under main site ESC permit, ESC17-00102
|
ESC17-00908
| DOC - Permit Finaled | 6/6/2018 | 6/6/2018 | 6/6/2018 7:56:14 AM | P | PASS |
|
|
|
ESC17-00907
| General Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 7:55:58 AM | | PASS |
|
|
Apartment complex near completion, landscaping and final clean up in progress. All remaining inspections conducted under main site ESC permit, ESC17-00102
|
ESC17-00907
| DOC - Permit Finaled | 6/6/2018 | 6/6/2018 | 6/6/2018 7:55:02 AM | P | PASS |
|
|
|
ESC17-00219
| Aging Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 7:53:14 AM | | CANC |
|
|
|