Inspections for the day of: Friday, June 7, 2019.
Number of inspections: 20
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00791 BMP Violation5/29/20195/31/2019 A 
ESC17-01491 General Inspection6/7/20196/7/20196/10/2019 10:23:48 AM CANC
ESC18-00754 General Inspection6/7/20196/7/20196/10/2019 8:08:23 AM PASS
No acitiviity, site being used for staging construction equipment and materials. Silt fence installed to protect irrigation ditch.
ESC18-01531 Complaint Inspection6/7/20196/7/20196/7/2019 2:05:12 PMPFAIL
Unserviced and overflowing trash bin caused windblown trash to be blown around culdesac and surrounding slopes during wind storm.

Correction:
- all construction trash around Win Hollow needs to be picked up. This is the only active site with a trash structure, so all trash must be assumed to be from the site
- get trash box serviced, relocate inside garage or increase frequency of service, provide a tarp or board to cover during periods of inactivity.

ESC17-01414 General Inspection6/7/20196/7/20196/7/2019 1:25:09 PM PASS
Grading and infrastructure complete. Site now under coverage by Blackrock Home parkcenter BLVD townhome permits. Temp BMPs and final clean up to be covered by Blackrock, no further inspections on this permit.
ESC17-01414 DOC - Permit Finaled6/7/20196/7/20196/7/2019 1:24:05 PMPPASS
ESC19-00396 Site Preparation6/4/20196/7/20196/7/2019 1:23:36 PMAPEND
follow up on silt fence installation
ESC18-00358 General Inspection6/7/20196/7/20196/7/2019 1:21:27 PM CANC
ESC18-00437 Aging Inspection6/7/20196/7/20196/7/2019 1:20:32 PM CANC
ESC18-00437 DOC - Permit Finaled6/7/20196/7/20196/7/2019 1:20:29 PMPPASS
ESC18-00339 Aging Inspection6/7/20196/7/20196/7/2019 1:20:19 PM CANC
ESC18-00339 DOC - Permit Finaled6/7/20196/7/20196/7/2019 1:20:14 PMPPASS
ESC18-01029 General Inspection6/7/20196/7/20196/7/2019 1:19:40 PM CANC
rescheduled for site final
ESC18-00886 Aging Inspection6/7/20196/7/20196/7/2019 1:19:08 PM PASS
ESC18-00886 DOC - Permit Finaled6/7/20196/7/20196/7/2019 1:19:03 PMPPASS
ESC18-00150 Aging Inspection6/7/20196/7/20196/7/2019 1:18:36 PM PASS
ESC18-00150 DOC - Permit Finaled6/7/20196/7/20196/7/2019 1:18:23 PMPPASS
ESC18-00731 Aging Inspection6/7/20196/7/20196/7/2019 1:18:01 PM CANC
ESC18-01244 Random Inspection6/7/20196/7/20196/7/2019 10:56:25 AMPFAIL
Overflowing trash and loose debris next to driveeway.

Request to RP to clean up. Texted picture of violation.
ESC18-00783 General Inspection6/7/20196/7/20196/7/2019 10:49:31 AMPPART
RP on site, permit sign posted, storm drains have sediment protection.

Corrections needed:

- clean up spilled washout on 6th street entrance and dried slurry in gutter
- improve and lengthen construction entrance on 6th
- relocate concrete washouts further inside of site to prevent runoff offsite.

verbal request to Adam