Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00618 General Inspection6/6/20186/8/20186/13/2018 1:37:38 PMPPASS
check for corrections

Sidewalk and gutter have been swept as requested. Scaffolding for exterior stucco is being removed. DI bags still installed. No new corrections.
ESC16-01472 General Inspection6/8/20186/8/20186/11/2018 3:57:01 PMPPEND
ESC17-00780 General Inspection6/8/20186/8/20186/11/2018 3:56:52 PM CANC
ESC17-01009 Site Preparation6/8/20186/8/20186/11/2018 8:04:53 AMPPASS
RP on site with ESC plan. Will use Suez pump station driveway for bathroom and some material staging. Wattle to be installed along Hill Road to capture runoff. RP to have excavator move dirt from foundation to make a berm to divert run on to Collister rather than through site.

RP request WUI firewise seed mix information.
ESC17-00249 General Inspection6/8/20186/8/20186/8/2018 1:00:31 PM PASS
WIP on shoulder and sidewalk at the access drive. Access drive is paved and storm drain system hooked up. Landscaping the bank between retaining wall and fence of existing homes below.

They are still using bark and shrubberies, not grasses as Public Works had ordered. There is a sediment control wattle along the toe of the slope at the fence as well as some drain rock in several areas.

No erosion or runoff issues observed.
ESC17-00774 General Inspection6/5/20186/8/20186/8/2018 12:54:45 PMPPEND
NO flow through creek. No activity. No repair to large gully @ Harris Ranch Road and Parkcenter as requested. Sediment from gully is trapped behind barrier blocks and will need removed.
ESC17-00695 Aging Inspection6/8/20186/8/20186/8/2018 12:53:03 PM PASS
Townhome complete, BLD finaled. Remaining ESC inspections for common areas and DI bag removal will be under ESC14-01083
ESC17-00695 DOC - Permit Finaled6/8/20186/8/20186/8/2018 12:52:56 PMPPASS
ESC17-01050 Aging Inspection6/8/20186/8/20186/8/2018 12:52:43 PM PASS
Townhome complete, BLD finaled. Remaining ESC inspections for common areas and DI bag removal will be under ESC14-01083
ESC17-01050 DOC - Permit Finaled6/8/20186/8/20186/8/2018 12:39:01 PMPPASS
ESC17-00679 Random Inspection6/8/20186/8/20186/8/2018 12:07:51 PMPPASS
WIP on landscaping. No discharges or trackout off Taboo. Storm drains have sediment protection. Trash contained.
ESC17-00504 Site Final6/8/20186/8/20186/8/2018 12:05:56 PMPPASS
Home complete and landscaped. No temp BMP removal required.
ESC17-00505 Site Final6/8/20186/8/20186/8/2018 12:05:36 PMPPASS
Home complete and landscaped. No temp BMP removal required.
ESC17-01317 Site Preparation6/8/20186/8/20186/8/2018 12:01:25 PMPPASS
Clint Phone #: ###-####

Permit sign posted at upper end of lot. Trash box provided. Rear slope has been recently seeded and a sprinkler line installed to water the new vegetation.

Approved for construction.
ESC17-01444 General Inspection6/8/20186/8/20186/8/2018 11:54:04 AMPFAIL
Backfill from foundations pushed to rear of lot. No perimeter control for sediment and earthen berm that was installed to prevent water from going down slope has been graded over.

Correction request to Clint to re-grade berm and install wattle at bottom of subdivision fence.
ESC17-01298 General Inspection6/8/20186/8/20186/8/2018 11:53:18 AMPFAIL
Backfill from foundations pushed to rear of lot. No perimeter control for sediment and earthen berm that was installed to prevent water from going down slope has been graded over.

Correction request to Clint to re-grade berm and install wattle at bottom of subdivision fence.
ESC16-01650 Conference6/8/20186/8/20186/8/2018 11:40:03 AMPDONE
Site walk through with Steve with CMG to show where there are issues.

- remove black section of silt fence that has been undercut and is concentrating water on slope.
- upturn edges of orange silt fence below homes in progress.
- clean up loose dirt and address erosion and sediment runoff from the pathway down to the greenbelt.

Sections of slope are not yet vegetated to 80% for site final.

RP to schedule work for next week. Will follow up.
ESC17-01362 General Inspection6/8/20186/8/20186/8/2018 11:31:48 AMPPASS
RP notified that dewatering has resumed to install east side sewer for the building. Deep well (16 ft) discharging groundwater to Envirotanks. DIscharge to Walling Creek is clear. Once water level to get into trench is low enough, the trench water will be discharged to the east side holding pond. As a contigency, there is a hard pipe installed to the west side retention area.

Permit signs posted, construction entrances preventing trackout, spill kits and concrete washouts located on site. RP on duty.

No violations cited. Requested that earthwork crew get water truck on site for dust control for operations today on west side of site..
ESC17-00919 General Inspection6/8/20186/8/20186/8/2018 8:14:34 AM PASS
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
ESC17-00919 DOC - Permit Finaled6/8/20186/8/20186/8/2018 8:14:28 AMPPASS
ESC17-00918 General Inspection6/8/20186/8/20186/8/2018 8:14:21 AM PASS
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
ESC17-00918 DOC - Permit Finaled6/8/20186/8/20186/8/2018 8:14:14 AMPPASS
ESC17-00917 General Inspection6/8/20186/8/20186/8/2018 8:14:07 AM PASS
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
ESC17-00917 DOC - Permit Finaled6/8/20186/8/20186/8/2018 8:14:00 AMPPASS
ESC17-00917 DOC - Permit Finaled6/8/20186/8/20186/8/2018 8:13:28 AMPPASS
ESC17-00915 General Inspection6/8/20186/8/20186/8/2018 8:13:21 AM PASS
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
ESC17-00915 DOC - Permit Finaled6/8/20186/8/20186/8/2018 8:13:15 AMPPASS
ESC17-00914 General Inspection6/8/20186/8/20186/8/2018 8:13:02 AM PASS
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
ESC17-00914 DOC - Permit Finaled6/8/20186/8/20186/8/2018 8:11:32 AMPPASS