ESC17-00618
| General Inspection | 6/6/2018 | 6/8/2018 | 6/13/2018 1:37:38 PM | P | PASS |
|
|
check for corrections
Sidewalk and gutter have been swept as requested. Scaffolding for exterior stucco is being removed. DI bags still installed. No new corrections.
|
ESC16-01472
| General Inspection | 6/8/2018 | 6/8/2018 | 6/11/2018 3:57:01 PM | P | PEND |
|
|
|
ESC17-00780
| General Inspection | 6/8/2018 | 6/8/2018 | 6/11/2018 3:56:52 PM | | CANC |
|
|
|
ESC17-01009
| Site Preparation | 6/8/2018 | 6/8/2018 | 6/11/2018 8:04:53 AM | P | PASS |
|
|
RP on site with ESC plan. Will use Suez pump station driveway for bathroom and some material staging. Wattle to be installed along Hill Road to capture runoff. RP to have excavator move dirt from foundation to make a berm to divert run on to Collister rather than through site.
RP request WUI firewise seed mix information.
|
ESC17-00249
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 1:00:31 PM | | PASS |
|
|
WIP on shoulder and sidewalk at the access drive. Access drive is paved and storm drain system hooked up. Landscaping the bank between retaining wall and fence of existing homes below.
They are still using bark and shrubberies, not grasses as Public Works had ordered. There is a sediment control wattle along the toe of the slope at the fence as well as some drain rock in several areas.
No erosion or runoff issues observed.
|
ESC17-00774
| General Inspection | 6/5/2018 | 6/8/2018 | 6/8/2018 12:54:45 PM | P | PEND |
|
|
NO flow through creek. No activity. No repair to large gully @ Harris Ranch Road and Parkcenter as requested. Sediment from gully is trapped behind barrier blocks and will need removed.
|
ESC17-00695
| Aging Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 12:53:03 PM | | PASS |
|
|
Townhome complete, BLD finaled. Remaining ESC inspections for common areas and DI bag removal will be under ESC14-01083
|
ESC17-00695
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 12:52:56 PM | P | PASS |
|
|
|
ESC17-01050
| Aging Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 12:52:43 PM | | PASS |
|
|
Townhome complete, BLD finaled. Remaining ESC inspections for common areas and DI bag removal will be under ESC14-01083
|
ESC17-01050
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 12:39:01 PM | P | PASS |
|
|
|
ESC17-00679
| Random Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 12:07:51 PM | P | PASS |
|
|
WIP on landscaping. No discharges or trackout off Taboo. Storm drains have sediment protection. Trash contained.
|
ESC17-00504
| Site Final | 6/8/2018 | 6/8/2018 | 6/8/2018 12:05:56 PM | P | PASS |
|
|
Home complete and landscaped. No temp BMP removal required.
|
ESC17-00505
| Site Final | 6/8/2018 | 6/8/2018 | 6/8/2018 12:05:36 PM | P | PASS |
|
|
Home complete and landscaped. No temp BMP removal required.
|
ESC17-01317
| Site Preparation | 6/8/2018 | 6/8/2018 | 6/8/2018 12:01:25 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted at upper end of lot. Trash box provided. Rear slope has been recently seeded and a sprinkler line installed to water the new vegetation.
Approved for construction.
|
ESC17-01444
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 11:54:04 AM | P | FAIL |
|
|
Backfill from foundations pushed to rear of lot. No perimeter control for sediment and earthen berm that was installed to prevent water from going down slope has been graded over.
Correction request to Clint to re-grade berm and install wattle at bottom of subdivision fence.
|
ESC17-01298
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 11:53:18 AM | P | FAIL |
|
|
Backfill from foundations pushed to rear of lot. No perimeter control for sediment and earthen berm that was installed to prevent water from going down slope has been graded over.
Correction request to Clint to re-grade berm and install wattle at bottom of subdivision fence.
|
ESC16-01650
| Conference | 6/8/2018 | 6/8/2018 | 6/8/2018 11:40:03 AM | P | DONE |
|
|
Site walk through with Steve with CMG to show where there are issues.
- remove black section of silt fence that has been undercut and is concentrating water on slope. - upturn edges of orange silt fence below homes in progress. - clean up loose dirt and address erosion and sediment runoff from the pathway down to the greenbelt.
Sections of slope are not yet vegetated to 80% for site final.
RP to schedule work for next week. Will follow up.
|
ESC17-01362
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 11:31:48 AM | P | PASS |
|
|
RP notified that dewatering has resumed to install east side sewer for the building. Deep well (16 ft) discharging groundwater to Envirotanks. DIscharge to Walling Creek is clear. Once water level to get into trench is low enough, the trench water will be discharged to the east side holding pond. As a contigency, there is a hard pipe installed to the west side retention area.
Permit signs posted, construction entrances preventing trackout, spill kits and concrete washouts located on site. RP on duty.
No violations cited. Requested that earthwork crew get water truck on site for dust control for operations today on west side of site..
|
ESC17-00919
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 8:14:34 AM | | PASS |
|
|
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
|
ESC17-00919
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 8:14:28 AM | P | PASS |
|
|
|
ESC17-00918
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 8:14:21 AM | | PASS |
|
|
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
|
ESC17-00918
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 8:14:14 AM | P | PASS |
|
|
|
ESC17-00917
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 8:14:07 AM | | PASS |
|
|
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
|
ESC17-00917
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 8:14:00 AM | P | PASS |
|
|
|
ESC17-00917
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 8:13:28 AM | P | PASS |
|
|
|
ESC17-00915
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 8:13:21 AM | | PASS |
|
|
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
|
ESC17-00915
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 8:13:15 AM | P | PASS |
|
|
|
ESC17-00914
| General Inspection | 6/8/2018 | 6/8/2018 | 6/8/2018 8:13:02 AM | | PASS |
|
|
Cimmaron Apartments near completion. Final landscaping and clean up in progress. Some buildings now occupied. ESC final conditions to be met under main site permit, ESC17-00102
|
ESC17-00914
| DOC - Permit Finaled | 6/8/2018 | 6/8/2018 | 6/8/2018 8:11:32 AM | P | PASS |
|
|
|