Inspections for the day of: Thursday, June 9, 2016.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00556 General Inspection6/9/20166/9/20166/10/2016 12:13:32 PM CANC
no inspection conducted, site is currently inactive for subdivision devepment
ESC15-00403 General Inspection6/9/20166/9/20166/10/2016 12:12:55 PM PASS
No trackout. Vegetated perimeter is undisturbed. Working on the interior. Site infrastructure already installed.
ESC15-01224 General Inspection6/9/20166/9/20166/10/2016 12:03:52 PM PASS
ESC15-01468 Aging Inspection6/9/20166/9/20166/10/2016 11:08:54 AM PASS
Project complete and stabilized. All permits finaled.
ESC15-01437 Aging Inspection6/9/20166/9/20166/10/2016 8:10:18 AM CANC
rescheduled
ESC14-00886 General Inspection6/9/20166/9/20166/9/2016 2:23:25 PM CANC
ESC15-01345 Aging Inspection6/9/20166/9/20166/9/2016 2:14:38 PM CANC
rescheduled for next week
ESC15-01343 Aging Inspection6/9/20166/9/20166/9/2016 2:11:57 PM CANC
rescheduled for next week
ESC15-00541 General Inspection6/9/20166/9/20166/9/2016 2:06:12 PM PASS
No activity at site. No violations. Access road and utilities are installed. Some loose sediment within site, but not runoff issues. No corrections at this time.
ESC11-00879 General Inspection6/9/20166/9/20166/9/2016 1:57:37 PM PART
Need to sweep curb and gutter due to trackout and loose dirt from SFH construciton. No dirt coming outside of subdivision to Boise Hills Dr and onsite inlets have sediment protection. Just needs house cleaning.
ESC15-01283 General Inspection6/9/20166/9/20166/9/2016 1:56:23 PM PASS
Near completion. Getting prepped for landscaping. No discharges or trackout from site observed.
ESC16-00412 Site Preparation6/8/20166/9/20166/9/2016 1:33:24 PMAPASS
Jim Phone #: ###-####

Permit sign posted on fence - visible from road. Access will be from dirt alley. Site has good drainage/vegetation that will be preserved for onsite stormwater retention. Approved.
ESC15-01473 Aging Inspection6/9/20166/9/20166/9/2016 1:22:03 PM PASS
ESC16-00403 Site Preparation6/9/20166/9/20166/9/2016 1:10:54 PMPPASS
Jill Phone #: ###-####

BMPs installed including sediment control mats on DIs, perimeter wattle along the south border, and construction fencing with dust screens.

Permit posted. Approved for demolition. Water supply to be onsite to control dust.
ESC14-01063 General Inspection6/9/20166/9/20166/9/2016 12:18:57 PMPPASS
No activity in EC #8. All DIs on Goshawk and Arrow Villa have been cleaned this week. Hillside vegetation and silt fence perimeter at runoff point are in good condtion and should contain sediment onsite. Lots that were under water have been re-graded and SFH construction should begin soon.

No corrections, site is in compliance. Permit and SWPPP info onsite.
ESC13-00764 General Inspection6/9/20166/9/20166/9/2016 12:16:13 PMPPART
WIP on SFHs on Bent Bow in EC #7. Lined concrete washout pit is located at bottom of hill on Arrow Villa.

Correction request to developer and Canyon Crest Homes:

-all DI bags on Bent Bow need to be emptied out and reisntalled.

No other corrections. Hillsides well vegetated. Individual projects are mostly clean.
ESC14-00432 General Inspection6/9/20166/9/20166/9/2016 10:07:50 AM CANC
ESC15-00871 Complaint Inspection6/9/20166/9/20166/9/2016 10:06:44 AMAPASS
Dust complaint received:

Water supply and hoses on site for dust control. Requested that in afternoon need to spray down stockpiles.

BMPs installed on site, DIs have sediment filters, lined concrete washout area is provided.

Requested that trash bin be used. Hauling off materials as they go. No windblown trash across street or along canal.

Permit sign posted. No dust at time of inspection.
ESC16-00428 Site Preparation6/8/20166/9/20166/9/2016 9:20:21 AMAPASS
Call me 30 prior to the inspection is you would like to meet me on site. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

Direct power line bury. Low risk flat site. Will notify when complete. Approved for construction.
ESC13-00806 General Inspection6/9/20166/9/20166/9/2016 9:16:34 AM PASS