ESC15-00048
| Aging Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 4:48:14 PM | | CANC |
|
|
|
ESC13-00213
| General Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 4:04:32 PM | | PASS |
|
|
|
ESC15-00131
| Aging Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 2:20:46 PM | | PASS |
|
|
UST maintenance complete. Parking lot paved over stabilized. Permit closed.
|
ESC15-00131
| DOC - Permit Finaled | 7/10/2015 | 7/10/2015 | 7/10/2015 2:20:20 PM | P | PASS |
|
|
|
ESC15-00654
| Conference | 7/9/2015 | 7/10/2015 | 7/10/2015 1:54:48 PM | A | PEND |
|
|
Hayden Homes in process of cleaning up Aralar Park. Will conduct inspection after clean up to see where addition sediment containment BMPs or stabilization is needed.
|
ESC15-00509
| Random Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 12:51:56 PM | P | PART |
|
|
GC on site at time of inspection. Hillside home with silty clay soil, all activity has been suspended during the wet weather to avoid erosion and compaction issues.
Permit is posted, downslope perimeter silt fence is properly trenched in. No site prep was scheduled, informed GC M. Visser of the requirement and its purpose.
Need to pick up some trash (cans, bottles) and provide a trash bin.
|
ESC15-00094
| Tracking Control | 7/10/2015 | 7/10/2015 | 7/10/2015 11:58:48 AM | P | PEND |
|
|
Clean up and additional sediment controls are being installed along slopes that have sheet flow that concentrates at Windsong. Sand and gravel from the prepped road base have migrated down hill. 2 sweepers and skidster are on site. Response has been proactive.
Walked the site, no significant hillside rills or gullies observed. Upper portion abutting existing homes did not have issues and sediment control wattle and buffer were effective.
Preparing for more rainfall this weekend.
|
ESC14-01151
| General Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 11:55:00 AM | | PASS |
|
|
No sediment leaving site. Street and sidewalk free of trackout. Some rill erosion within area of disturbance will need repairs, part of issue is that roof top gutters and downspouts are not yet installed. No sediment runoff to Hard Rock
|
ESC15-00023
| Tracking Control | 7/10/2015 | 7/10/2015 | 7/10/2015 11:28:20 AM | P | FAIL |
|
|
Wattles onsite but were never installed. Mud and dirt washed out to sidewalk, street, and gutter.
2nd violation. If not clean and all BMPs installed by Monday enforcement escalation will occur.
Called RP Rustin and send picture of site.
|
ESC13-00230
| General Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 10:55:25 AM | | PART |
|
|
No significant blowouts or erosion occured during storm. SFHs in progress, workers staying off muddy areas, no trackout observed. No discharges occuring.
Correction:
Sweep around two DIs and change out sediment bags at RH#5 entrance.
Notified Brighton RP.
|
ESC14-00657
| Tracking Control | 7/10/2015 | 7/10/2015 | 7/10/2015 10:49:56 AM | P | PART |
|
|
Some erosion along the banks of the entrance blew out onto the intersection with Warm Springs and filled drop inlet with mud. Cleaning and maintenance crew was already working upon arrival - shoveling mud and dirt, emptying out inlet bags and sweeping. A street sweeper should come in later this after once the dirt has had time to dry.
I think sediment control wattles or silt fence should be installed at the entrance or else landscaping needs to be scheduled.
|
ESC15-00556
| Tracking Control | 7/10/2015 | 7/10/2015 | 7/10/2015 10:32:41 AM | P | PART |
|
|
Drainage channel along Highland Valley blew out onto Warm Springs. Also in East Valley #1 the southeast corner had sediment deposition on the streets.
RP called to alert ESC division about issue. Shovel crew is working on the street in EV #1. A sweeper tractor is coming to clean Warm Springs at noon per RP.
Does not appear muddy discharge extended into the drainage ditch on the south side of road.
Channel should have check dams or be lined with rip rap. Also does not appear there is a receiving gutter to convey water along the north side of Warm Springs to west...
Corrective actions/clean up is in progress. Will check back this afternoon. Warm Springs should be cleaned by early afternoon.
|
ESC15-00130
| Aging Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 9:07:10 AM | | PASS |
|
|
Maverik tank maintenance complete. All surfaces stabilized, no loose dirt.
|
ESC15-00130