ESC15-00403
| General Inspection | 7/11/2016 | 7/11/2016 | 7/12/2016 2:59:48 PM | | PASS |
|
|
|
ESC15-00556
| General Inspection | 7/11/2016 | 7/11/2016 | 7/12/2016 2:47:39 PM | | PART |
|
|
WIP on sewer & water line installation on HV Road. Received dust complaint from neighbor. Dust not bad at time of inspection, worker using water to spray down stockpile of dirt being used for fill in the trench.
Corrections: - sweep roadways between work area and site staging area in EV subdivision. - continue to use water for dust control.
|
ESC16-00872
| Site Preparation | 7/8/2016 | 7/11/2016 | 7/11/2016 4:28:02 PM | P | PASS |
|
|
Scheduled to start Tuesday AM
Flat infill lot. Low risk. Reviewed ESC conditions with builder. Approved for construction.
|
ESC14-01063
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 4:07:10 PM | | PART |
|
|
No activity. No hillside erosion or damaged BMPs.
Correction: - sweep up trapped sediment around the wattles protecting storm drains.
|
ESC15-00857
| General Inspection | 7/7/2016 | 7/11/2016 | 7/11/2016 3:50:29 PM | A | PASS |
|
|
WIP. No fugitive dust observed. Hillsides that were vegetated are undisturbed. No trackout or discharges. No corrections at this time.
|
ESC15-01161
| General Inspection | 7/8/2016 | 7/11/2016 | 7/11/2016 3:39:21 PM | A | PASS |
|
|
WIP. Silt fence installed at bottom corner where runoff exits lot. No trackout. Trash and materials are contained.
|
ESC16-00052
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 3:02:54 PM | P | PART |
|
|
Clint Phone #: ###-####
Permit sign posted. BMPs installed. Active projects in compliance
|
ESC15-01526
| General Inspection | 7/8/2016 | 7/11/2016 | 7/11/2016 2:52:28 PM | P | PASS |
|
|
Near completion. Yard not landscaped, BLD still open. No trackout, discharges or unkept materials. No corrections
|
ESC16-00734
| Site Final | 7/11/2016 | 7/11/2016 | 7/11/2016 2:51:17 PM | P | PASS |
|
|
Demo phase complete. Construction activity at Storage Plus site is now covered under ESC16-00522
|
ESC16-00522
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 2:50:21 PM | P | PASS |
|
|
Onsite contact - Milt ###-####
BMPs installed include: - permit posted - silt fence perimeter control to protect neighboring property and keep in sediment - rock construction entrance to limit trackout - water truck on site for dust control.
Closed out initial demo & grading permit ESC16-00734
|
ESC16-00704
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 2:00:45 PM | P | PASS |
|
|
Brett Phone #: ###-####
Permit sign posted. Subdivision BMPs installed, including lined concrete washout. Active projects in compliance. Approved for construction.
|
ESC16-00598
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 2:00:29 PM | P | PART |
|
|
Brett Phone #: ###-####
Permit sign posted. Lined washout provided but need to install new sediment protection on the two DIs on Coolwater.
Verbal correction request to Brett.
|
ESC16-00677
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 1:56:00 PM | P | PASS |
|
|
Brett Phone #: ###-####
Permit sign posted. Subdivision BMPs installed, including lined concrete washout. Active projects in compliance. Approved for construction.
|
ESC16-00532
| Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 1:50:08 PM | P | PASS |
|
|
Trenna Phone #: ###-####
Large flat lot currently pasture. No MS4 in area, lot is below grade of street. Review ESC permit conditions. New SFH, homeowner is builder.
|
ESC14-00588
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 11:38:44 AM | A | PASS |
|
|
WIP. No trackout. No fugitive dust occuring. BMPs installed. Perimeter is clean, trash and materials contained in site. Washout and liquid waste boxes provided.
|
ESC16-00751
| Site Preparation | 7/8/2016 | 7/11/2016 | 7/11/2016 10:19:00 AM | A | PASS |
|
|
Bill Phone #: ###-####
Permit sign posted on front of home. Construction access via paved alley. No stockpiling on site but some trench for drain line repair is needed. GC familiar with ESC permit conditions, clean site. Approved
|
ESC14-00594
| Aging Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 9:23:37 AM | | PASS |
|
|
WIP on at the District. Earth work for this structure and building frame are complete. No further ESC inspections on this permit, all site development work included/inspected under main permit ESC14-00588
|
ESC14-00594
| DOC - Permit Finaled | 7/11/2016 | 7/11/2016 | 7/11/2016 9:23:29 AM | P | PASS |
|
|
|
ESC14-00593
| Aging Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 9:23:21 AM | | PASS |
|
|
WIP on at the District. Earth work for this structure and building frame are complete. No further ESC inspections on this permit, all site development work included/inspected under main permit ESC14-00588
|
ESC14-00593
| DOC - Permit Finaled | 7/11/2016 | 7/11/2016 | 7/11/2016 9:23:03 AM | P | PASS |
|
|
|
ESC14-00592
| Aging Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 9:22:55 AM | | PASS |
|
|
WIP on at the District. Earth work for this structure and building frame are complete. No further ESC inspections on this permit, all site development work included/inspected under main permit ESC14-00588
|
ESC14-00592
| DOC - Permit Finaled | 7/11/2016 | 7/11/2016 | 7/11/2016 9:22:47 AM | P | PASS |
|
|
|
ESC14-00591
| Aging Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 9:22:30 AM | | PASS |
|
|
WIP on at the District. Earth work for this structure and building frame are complete. No further ESC inspections on this permit, all site development work included/inspected under main permit ESC14-00588
|
ESC14-00591
| DOC - Permit Finaled | 7/11/2016 | 7/11/2016 | 7/11/2016 9:21:07 AM | P | PASS |
|
|
|
ESC14-00886
| General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 9:04:39 AM | | PASS |
|
|
|