ESC16-01429
| Site Final | 7/7/2017 | 7/13/2017 | 7/13/2017 2:24:08 PM | P | PASS |
|
|
Project complete, stabilized/re-vegetated. ESC conditions satisfied.
|
ESC16-01429
| DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 2:23:42 PM | P | PASS |
|
|
|
ESC16-00938
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 1:20:11 PM | P | PASS |
|
|
revegetation and stabilization near complete. Temporary wattle still installed.
|
ESC16-01259
| DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 12:55:42 PM | P | PASS |
|
|
|
ESC16-00853
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 12:38:24 PM | | PART |
|
|
No trackout, loose trash or discharges.
Correction request to relocate stucco crew staging area off adjacent lot that has been source of track out and contention.
|
ESC17-00478
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 12:16:21 PM | P | FAIL |
|
|
Trash container is over full. Wind blown trash and debris blown around multiple sites in RH#7. Request issued to empty containers and have crew do a litter pick up in the common areas and site perimeter.
|
ESC15-01288
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 12:13:21 PM | | PART |
|
|
WIP on multiple SFHs in RH#7. No significant trackout, no discharges leaving site. No fugitive dust observed.
Corrections: - concrete washout is ready for service and over 75% full - trash bins at site are over full, wind blown trash and wrappings in drainage area and site perimeters should be picked up. Issued request to Brighton Homes RP in addition to subdivision development. - remove expired wattle netting strewn along side Warm Springs in front of project.
Will check in on conditions next week
|
ESC17-00674
| Site Preparation | 7/13/2017 | 7/13/2017 | 7/13/2017 12:03:43 PM | P | PASS |
|
|
Clint Phone #: ###-####
Subdivision BMPs installed. Current projects in compliance. Approved for construction
|
ESC17-00675
| Site Preparation | 7/13/2017 | 7/13/2017 | 7/13/2017 12:03:20 PM | P | PASS |
|
|
Clint Phone #: ###-####
Subdivision BMPs installed. Current projects in compliance. Approved for construction
|
ESC16-01561
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:50:45 AM | P | PASS |
|
|
No activity. New streets and stormwater infrastructure installed. DI's fitted with sediment bags. Wattles and vegetation preserved next to Walling Creek pathway
|
ESC16-01169
| Aging Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:37:22 AM | | PASS |
|
|
Harris Crossing townhome complete, landscaped. Temp BMPs in sub to remain till all construction activities stop. No corrections.
|
ESC16-01169
| DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 11:37:14 AM | P | PASS |
|
|
|
ESC16-01170
| Aging Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:36:58 AM | | PASS |
|
|
Harris Crossing townhome complete, landscaped. Temp BMPs in sub to remain till all construction activities stop. No corrections.
|
ESC16-01170
| DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 11:36:50 AM | P | PASS |
|
|
|
ESC16-01171
| Aging Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:36:41 AM | | PASS |
|
|
Harris Crossing townhome complete, landscaped. Temp BMPs in sub to remain till all construction activities stop. No corrections.
|
ESC16-01171
| DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 11:36:35 AM | P | PASS |
|
|
|
ESC16-01172
| Aging Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:36:19 AM | | PASS |
|
|
Harris Crossing townhome complete, landscaped. Temp BMPs in sub to remain till all construction activities stop. No corrections.
|
ESC16-01172
| DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 11:34:53 AM | P | PASS |
|
|
|
ESC16-00489
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:26:36 AM | | PASS |
|
|
|
ESC14-01083
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:08:58 AM | | PASS |
|
|
WIP on west end of subdivision. STormdrains have sediment bags installed. Okay to remove DI bags east of Mare Street. Concrete washout facility provided. Trash and materials are contained. Approved.
|
ESC17-00347
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 11:05:32 AM | A | PASS |
|
|
Demolition and excavation of site is in progress. Water trucks on site for dust control. No trackout or fugitive dust.
Stockpiles are covered in plastic sheeting, perimeter wattle installed, and surrounding storm drains have inlet protection. Approved.
|
ESC16-01533
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 9:32:50 AM | | PASS |
|
|
|
ESC16-01233
| General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 7:58:00 AM | | CANC |
|
|
|
ESC16-01494
| General Inspection | 7/12/2017 | 7/13/2017 | 7/13/2017 7:57:47 AM | A | CANC |
|
|
|