ESC17-01104
| General Inspection | 7/17/2018 | 7/17/2018 | 7/24/2018 12:39:43 PM | | CANC |
|
|
rescheduled
|
ESC15-00306
| General Inspection | 7/17/2018 | 7/17/2018 | 7/19/2018 10:37:33 AM | P | PEND |
|
|
check for temp BMPs that need removing and/or maintenance.
|
ESC16-01706
| General Inspection | 7/17/2018 | 7/17/2018 | 7/19/2018 10:26:39 AM | | PASS |
|
|
Site entrance and curbing is complete. Concrete washout containment was used. Permit posted. No trackout. Minimal actitivity at time of inspection. No dust. Approved.
|
ESC18-00792
| General Inspection | 7/6/2018 | 7/17/2018 | 7/19/2018 10:16:13 AM | A | PASS |
|
|
check for construction entrance, dust control (if needed)
WIP on site grading and infrastructure. Dust is being kicked up by heavy equipment but not leaving site boundaries. Large stockpile in process of being hauled away. Water truck onsite spraying haul route and stockpile before loading. Construction entrance installed. No trackout to Denton. Permit signs posted. Site is in compliance.
|
ESC17-01370
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 3:48:55 PM | P | PASS |
|
|
Project near completion. Will check back next for site final inspeciton. No violations observed.
|
ESC16-01354
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 3:46:37 PM | | PASS |
|
|
No corrections requested. ESC permit open to make sure all DI bags installed around project perimeter are removed. Buildings permited seperately
|
ESC18-00565
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 3:45:43 PM | P | PASS |
|
|
WIP on foundation. No trackout. Permit sign and SWPPP info posted inside entrance. MS4 inlet at 13th & Myrtle has sediment protection instaled.
Ecopan concrete washout pans being utilized to contain washout. No corrrections requested.
|
ESC18-00529
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 3:45:31 PM | P | PASS |
|
|
WIP on foundation. No trackout. Permit sign and SWPPP info posted inside entrance. MS4 inlet at 13th & Myrtle has sediment protection instaled.
Ecopan concrete washout pans being utilized to contain washout. No corrrections requested.
|
ESC16-01446
| Site Final | 7/16/2018 | 7/17/2018 | 7/17/2018 3:42:51 PM | P | NR |
|
|
Please call either myself or Scott at ###-#### when you are on site. We will come and meet with you.
Thanks Phone #: ###-#### Inspection requested via web by David Banks
ESC permit will be ready to final upon completion of paver installation on the NW corner of building and parking lot clean. No temp DI bag removal from MS4 required.
Checking on status to final GRD permit.
|
ESC14-01063
| Random Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 1:57:07 PM | P | PASS |
|
|
|
ESC15-00857
| Conference | 7/11/2018 | 7/17/2018 | 7/17/2018 1:56:23 PM | A | PASS |
|
|
10 AM walk through with Jill, Colin, Michael regarding phase 10 construction (to begin in August pending approvals). No issues or corrections requestd for phase 9
- reviewed grading plan and draft ESC BMP placement - main construction entrance installation and SWPPP sign will be posted at Eyrie Way. - large retention pond at bottom of subdivision to be cleaned out and graded during this first phase of work so that stormwater runoff can be contained onsite. Silt fence perimeter will be installed between pond and adjacent lot that borders Stewart Gulch/Sand Creek. - storm drains on Eyrie Way will have sediment protection. - staging area of equipment to be northeast of the stormwater pond. Will have water tank(s) onsite for dust control and soil compaction moisture. - top soil will stockpiled at winter camp culdesac to be re-applied to graded slopes. Any long term stockpiles kept on site after grading will need to be stabilized. - after first phase of mass grading & earthwork additional BMPs will need to be installed. (slope tracking, wattles at intervals on steep slopes, drainage controls, and check dams in any conveyances.
- as a safety control and rock barrier, straw bales will be installed below area of disturbance and above homes on the north side of Arrow Villa. It is is noted that this is not a perimeter sediment control. Preservation of hillside vegetation outside clearing limits and grading to direct water away from slope and toward future road will conducted. Additional permeter sediment controls may be required upon completion of earthwork.
Full ESC plan review has not yet been conducted and items discussed today will be included in the SWPPP narrative.
|
ESC17-01125
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 1:42:29 PM | P | PASS |
|
|
Trash contained. No trackout or sediment disccharges. BMPs installed.
|
ESC17-00837
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 1:42:01 PM | P | PASS |
|
|
|
ESC17-00977
| Site Final | 7/11/2018 | 7/17/2018 | 7/17/2018 1:10:21 PM | A | PASS |
|
|
Project complete. Disturbed area stabilized with retaining walls and landscaping. ESC permit conditions satisfied.
|
ESC18-00503
| General Inspection | 7/11/2018 | 7/17/2018 | 7/17/2018 1:09:09 PM | A | PART |
|
|
No trackout or discharges occuring. Silt fence perimeter in good condition.
No correction made to the construction entrance rock that has rolled out into the sidewalk and street. Rock needs to be placed back in entrance and installed so that it will not roll off site.
No correction requested, will check conditions next general inspection.
|
ESC17-01674
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 1:06:25 PM | P | PASS |
|
|
Home near completion. Yard has been landscaped with trees and sod, disturbed slopes around the perimeter have been hydroseeded. No violations observed.
|
ESC17-01003
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 1:04:49 PM | P | PASS |
|
|
WIP on interior. Trash contained, no trackout or spills. No corrections requested
|
ESC17-01281
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 12:08:09 PM | P | PASS |
|
|
Rock Placing Company on site. No trackout or discharges observed. Project has stayed within clearing limits. No corrections.
|
ESC17-01057
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 12:05:29 PM | | PART |
|
|
No activity or crew onsite at time of inspection. Pool is installed but not yet complete. All permits open.
WIP installing wrought iron fence around yard which is not yet landscaped.
Silt fence below project will require maintenance/ re-installation if yard is not stabilized as part of the project.
No corrections requested at this time, no violations observed. Will check back in 3 weeks.
|
ESC17-00663
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 8:17:18 AM | | CANC |
|
|
|
ESC17-00897
| Aging Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 8:14:18 AM | | PASS |
|
|
|
ESC17-00897
| DOC - Permit Finaled | 7/17/2018 | 7/17/2018 | 7/17/2018 8:14:11 AM | P | PASS |
|
|
|
ESC17-00678
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 8:06:03 AM | | CANC |
|
|
|
ESC16-00329
| General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 8:05:36 AM | | CANC |
|
|
|