Inspections for the day of: Tuesday, July 17, 2018.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01104 General Inspection7/17/20187/17/20187/24/2018 12:39:43 PM CANC
rescheduled
ESC15-00306 General Inspection7/17/20187/17/20187/19/2018 10:37:33 AMPPEND
check for temp BMPs that need removing and/or maintenance.
ESC16-01706 General Inspection7/17/20187/17/20187/19/2018 10:26:39 AM PASS
Site entrance and curbing is complete. Concrete washout containment was used. Permit posted. No trackout. Minimal actitivity at time of inspection. No dust. Approved.
ESC18-00792 General Inspection7/6/20187/17/20187/19/2018 10:16:13 AMAPASS
check for construction entrance, dust control (if needed)

WIP on site grading and infrastructure. Dust is being kicked up by heavy equipment but not leaving site boundaries. Large stockpile in process of being hauled away. Water truck onsite spraying haul route and stockpile before loading. Construction entrance installed. No trackout to Denton. Permit signs posted. Site is in compliance.
ESC17-01370 General Inspection7/17/20187/17/20187/17/2018 3:48:55 PMPPASS
Project near completion. Will check back next for site final inspeciton. No violations observed.
ESC16-01354 General Inspection7/17/20187/17/20187/17/2018 3:46:37 PM PASS
No corrections requested. ESC permit open to make sure all DI bags installed around project perimeter are removed. Buildings permited seperately
ESC18-00565 General Inspection7/17/20187/17/20187/17/2018 3:45:43 PMPPASS
WIP on foundation. No trackout. Permit sign and SWPPP info posted inside entrance. MS4 inlet at 13th & Myrtle has sediment protection instaled.

Ecopan concrete washout pans being utilized to contain washout. No corrrections requested.
ESC18-00529 General Inspection7/17/20187/17/20187/17/2018 3:45:31 PMPPASS
WIP on foundation. No trackout. Permit sign and SWPPP info posted inside entrance. MS4 inlet at 13th & Myrtle has sediment protection instaled.

Ecopan concrete washout pans being utilized to contain washout. No corrrections requested.
ESC16-01446 Site Final7/16/20187/17/20187/17/2018 3:42:51 PMPNR
Please call either myself or Scott at ###-#### when you are on site. We will come and meet with you.

Thanks Phone #: ###-#### Inspection requested via web by David Banks

ESC permit will be ready to final upon completion of paver installation on the NW corner of building and parking lot clean. No temp DI bag removal from MS4 required.

Checking on status to final GRD permit.
ESC14-01063 Random Inspection7/17/20187/17/20187/17/2018 1:57:07 PMPPASS
ESC15-00857 Conference7/11/20187/17/20187/17/2018 1:56:23 PMAPASS
10 AM walk through with Jill, Colin, Michael regarding phase 10 construction (to begin in August pending approvals). No issues or corrections requestd for phase 9

- reviewed grading plan and draft ESC BMP placement
- main construction entrance installation and SWPPP sign will be posted at Eyrie Way.
- large retention pond at bottom of subdivision to be cleaned out and graded during this first phase of work so that stormwater runoff can be contained onsite. Silt fence perimeter will be installed between pond and adjacent lot that borders Stewart Gulch/Sand Creek.
- storm drains on Eyrie Way will have sediment protection.
- staging area of equipment to be northeast of the stormwater pond. Will have water tank(s) onsite for dust control and soil compaction moisture.
- top soil will stockpiled at winter camp culdesac to be re-applied to graded slopes. Any long term stockpiles kept on site after grading will need to be stabilized.
- after first phase of mass grading & earthwork additional BMPs will need to be installed. (slope tracking, wattles at intervals on steep slopes, drainage controls, and check dams in any conveyances.

- as a safety control and rock barrier, straw bales will be installed below area of disturbance and above homes on the north side of Arrow Villa. It is is noted that this is not a perimeter sediment control. Preservation of hillside vegetation outside clearing limits and grading to direct water away from slope and toward future road will conducted. Additional permeter sediment controls may be required upon completion of earthwork.

Full ESC plan review has not yet been conducted and items discussed today will be included in the SWPPP narrative.
ESC17-01125 General Inspection7/17/20187/17/20187/17/2018 1:42:29 PMPPASS
Trash contained. No trackout or sediment disccharges. BMPs installed.
ESC17-00837 General Inspection7/17/20187/17/20187/17/2018 1:42:01 PMPPASS
ESC17-00977 Site Final7/11/20187/17/20187/17/2018 1:10:21 PMAPASS
Project complete. Disturbed area stabilized with retaining walls and landscaping. ESC permit conditions satisfied.
ESC18-00503 General Inspection7/11/20187/17/20187/17/2018 1:09:09 PMAPART
No trackout or discharges occuring. Silt fence perimeter in good condition.

No correction made to the construction entrance rock that has rolled out into the sidewalk and street. Rock needs to be placed back in entrance and installed so that it will not roll off site.

No correction requested, will check conditions next general inspection.
ESC17-01674 General Inspection7/17/20187/17/20187/17/2018 1:06:25 PMPPASS
Home near completion. Yard has been landscaped with trees and sod, disturbed slopes around the perimeter have been hydroseeded. No violations observed.
ESC17-01003 General Inspection7/17/20187/17/20187/17/2018 1:04:49 PMPPASS
WIP on interior. Trash contained, no trackout or spills. No corrections requested
ESC17-01281 General Inspection7/17/20187/17/20187/17/2018 12:08:09 PMPPASS
Rock Placing Company on site. No trackout or discharges observed. Project has stayed within clearing limits. No corrections.
ESC17-01057 General Inspection7/17/20187/17/20187/17/2018 12:05:29 PM PART
No activity or crew onsite at time of inspection. Pool is installed but not yet complete. All permits open.

WIP installing wrought iron fence around yard which is not yet landscaped.

Silt fence below project will require maintenance/ re-installation if yard is not stabilized as part of the project.

No corrections requested at this time, no violations observed. Will check back in 3 weeks.
ESC17-00663 General Inspection7/17/20187/17/20187/17/2018 8:17:18 AM CANC
ESC17-00897 Aging Inspection7/17/20187/17/20187/17/2018 8:14:18 AM PASS
ESC17-00897 DOC - Permit Finaled7/17/20187/17/20187/17/2018 8:14:11 AMPPASS
ESC17-00678 General Inspection7/17/20187/17/20187/17/2018 8:06:03 AM CANC
ESC16-00329 General Inspection7/17/20187/17/20187/17/2018 8:05:36 AM CANC