ESC18-01167
| General Inspection | 7/17/2020 | 7/17/2020 | 7/22/2020 4:33:54 PM | P | PASS |
|
|
Vertical construction in progress. No trackout or discharges from site. No fugitive dust observed. Perimeter is clean and has sediment controls installed. No corrections at this time.
|
ESC18-01168
| General Inspection | 7/17/2020 | 7/17/2020 | 7/22/2020 4:33:39 PM | P | PASS |
|
|
Vertical construction in progress. No trackout or discharges from site. No fugitive dust observed. Perimeter is clean and has sediment controls installed. No corrections at this time.
|
ESC19-00917
| Aging Inspection | 7/17/2020 | 7/17/2020 | 7/21/2020 12:57:41 PM | | PASS |
|
|
Demo complete. Area used by Layton Construction for staging for the NW parking garage and shipping/receiving facilty. See ESC18-01167-68
|
ESC20-00697
| Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 3:24:30 PM | P | PASS |
|
|
See ESC20-01159. This project complete. BLD still open
|
ESC20-00066
| Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 3:24:03 PM | P | PASS |
|
|
See ESC20-01159. This project complete. BLD still open
|
ESC20-00554
| BMP Violation | 7/17/2020 | 7/17/2020 | 7/17/2020 3:02:44 PM | P | PASS |
|
|
compliance inspection. RP states corrections have been completed.
Dumped concrete washout slurry and rock has been cleaned up as requested. Fee for violation has been paid. RP called for an inspection. Approved. Parcel hold removed.
Will inspect next week for a liquid waste/rinsing station/receptacle
|
ESC19-00995
| Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 2:54:20 PM | P | PASS |
|
|
Phase of KAP improvements complete. No disturbed area remaining, no loose dirt in parking lot, no equipment on site. ESC permit conditions satisfied.
Phase 2 will include parking lot renovation and storm drain improvements. McMillan Jacobs with Jerry and Greg will also be contractor for this phase.
|
ESC19-01078
| Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 12:44:07 PM | P | PASS |
|
|
|
ESC19-00890
| Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 12:43:46 PM | P | PASS |
|
|
Wolf Tree Square BMPs to remain installed for ongoing townhome construction
|
ESC19-00913
| Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 12:43:31 PM | P | PASS |
|
|
Wolf Tree Square BMPs to remain installed for ongoing townhome construction
|
ESC19-01078
| Aging Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:20:56 AM | | CANC |
|
|
|
ESC19-01193
| Aging Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:20:23 AM | | CANC |
|
|
|
ESC19-00890
| Aging Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:19:47 AM | | CANC |
|
|
|
ESC19-00913
| Aging Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:19:30 AM | | CANC |
|
|
|
ESC19-00193
| General Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:18:02 AM | | CANC |
|
|
see ESC19-00181
|
ESC19-00194
| General Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:17:41 AM | | CANC |
|
|
see ESC19-00181
|
ESC19-00191
| General Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:14:12 AM | | CANC |
|
|
see ESC19-00181
|
ESC19-00190
| General Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 8:13:52 AM | | CANC |
|
|
see ESC19-00181
|
ESC20-01159
| Site Preparation | 7/17/2020 | 7/17/2020 | 7/17/2020 12:00:00 AM | P | PASS |
|
|
Dillon - */Screened*/ Phone #: ###-####
Initial BMPs installed including construction entrance, SWPPP signage, and storm drain inlet sediment protection.
Will use ecopan for concrete washout and there is a water truck onsite to control fugitve dust.
Approved.
|