ESC17-00847
| General Inspection | 7/22/2019 | 7/22/2019 | 7/25/2019 2:29:38 PM | | PASS |
|
|
|
MIS19-00205
| ESC-Conference | 7/19/2019 | 7/22/2019 | 7/24/2019 10:56:46 AM | P | PEND |
|
|
Brian 2083055694
Soil backfilled into hole has been compacted. Another load is need to complete filling the depression, which will also be compacted. After work is done will visit site to discuss revegetation and stabilization of surface.
|
ESC18-00006
| General Inspection | 7/22/2019 | 7/22/2019 | 7/24/2019 10:46:33 AM | | PEND |
|
|
to be rescheduled for inspection of all Micron campus ESC permits. Email sent to environmental compliance division.
|
ESC18-01715
| BMP Violation | 7/22/2019 | 7/22/2019 | 7/22/2019 4:25:39 PM | P | FAIL |
|
|
Dumped stucco washout on site, in gutter, and covering storm drain protection.
Need to clean up and train stucco crews to contain slurry or place mixer in an area away from storm drains.
Notified Clint with Black Rock
|
ESC18-00956
| General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 4:20:35 PM | | PASS |
|
|
|
ESC19-00371
| Tracking Control | 7/22/2019 | 7/22/2019 | 7/22/2019 4:18:10 PM | P | PASS |
|
|
check on construction entrance and dust control set up.
Construction entrance has been lengthened and Trent Point between entrance and Windsong has been well swept. No grading acitivity at time of inspection, crews working on putting in sewer lines. No trackout, no dust observed.
Wattle installed on the slope above the entrance have been removed to install run-on diversion channel above the slope and new road. After installation, slope will be spread with top soil, tracked, and slope interupting wattles installed.
Sweeper needs to hit gutter on Windsong between Boulder Heights and Birdsong.
|
ESC18-00492
| Site Final | 7/22/2019 | 7/22/2019 | 7/22/2019 1:54:06 PM | P | NR |
|
|
Project complete and landscaped. Need to remove storm drain sediment bag installed north of site on Franklin Road.
Notified RP Chuck
|
ESC18-00804
| General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 1:49:49 PM | P | PASS |
|
|
WIP. Structure is up, but no parking lot of vegetation. Road not patched from water line work. No trackout or discharges.
|
ESC19-00839
| Site Preparation | 7/18/2019 | 7/22/2019 | 7/22/2019 1:42:02 PM | A | PASS |
|
|
Scott ###-####
Site BMPs are installed, stormwater team (Scott, Tyler, John w/ ESI) onsite for inspections, SWPPP plan available. ESI to do SWPPP inspections and mantain binder.
- Site access and ESC permit sign posting is on Cloverdale. No access along Fairview at this time. Screened fence installed, Fairview along the south is above grade of the site. - Construction entrance on Cloverdale is the preserved asphalt from previous development. Area will also be used for employee parking and staging. This surface must be kept clean to prevent any turbid runoff to Cloverdale MS4. Sheet flow from this area flows north to low lying grassy-vegetated area. A watlle has been installed as a sediment control to treat runoff to this area.
- Clearing limits have been estabished. Entire perimeter except along Fairview has sediment control wattle installed properly.
- Leakproof concrete washout facility with sign must be provided prior to placement of any concrete.
- Rough grading and site grubbing is in progress, water truck in use to control dust and refill hydrant is onsite. No dust isssues observed.
- Large stockpiles inactive for 7 days must have stabilization measure implemented to prevent wind blown dust and sediment runoff. Current stockpile in NW corner is active. To prevent wind blown dust, top should be leveled and water truck should spray to form crust on top.
Approved for construction.
|
ESC18-01121
| Site Final | 7/19/2019 | 7/22/2019 | 7/22/2019 12:46:44 PM | A | NR |
|
|
Tyler 208 724 3135
Project near completion: BLD permit for structures is also still open.
Construction and staging areas are now landscaped and stabilized. Work areas anc surrounding parking areas are freee of loose sediment or construction debris. Irrigation installed. Silt fence sediment barrier along Farmer's Union Canal has been removed.
New greenbelt pathways are complete and open to public. Slope between pathway and Veterans Pond has jute matting and has been hydroseeded. It is a rocky uneven surface, netting is not trenched and is installed horizontally. Minimal overlap, some areas already loose.
ESC requests for site final approval: - remove storm drain sediment bags installed on Stilson and on VMP between greenelt access and stilson. - remove flber rolls around bridges that are in the water. - provide specs/details on jute matting installation.
|
ESC18-00106
| Aging Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 12:30:50 PM | | PASS |
|
|
WIP. Minimal exterior disturbance
|
ESC17-00984
| Aging Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 12:30:16 PM | | CANC |
|
|
|
ESC17-00984
| Site Final | 7/22/2019 | 7/22/2019 | 7/22/2019 12:30:03 PM | P | PASS |
|
|
Project complete and stabilized. No temp. BMPs All permits finaled.
|
ESC18-00363
| General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 8:09:52 AM | | CANC |
|
|
|
MIS19-00205
| ESC-Conference | 7/16/2019 | 7/22/2019 | 7/19/2019 3:17:33 PM | A | PEND |
|
|
possible sinkhole - there is caution tape Phone #: ###-####
hole to be filled and compacted with native soil. Follow up scheduled.
|