Inspections for the day of: Wednesday, July 22, 2020.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC20-00554 General Inspection7/17/20207/22/20207/27/2020 8:05:13 AMAPASS
check for liquid waste rinse out box/bin/container.

Two concrete washout containment boxes placed on site and were used during last cement pour
ESC19-00396 General Inspection7/22/20207/22/20207/24/2020 1:20:46 PM CANC
ESC20-00449 Site Preparation7/21/20207/22/20207/24/2020 1:12:19 PMAPASS
Mike Mann ###-####

BMPs installed. ESC plan being implemented. RP on duty. Will pour next week, RP aware of washout requiements and will use drip tarp/secondary containment under the pump truck

Approved.
ESC18-01447 General Inspection7/22/20207/22/20207/24/2020 12:30:59 PM CANC
ESC19-01562 General Inspection7/22/20207/22/20207/22/2020 4:35:46 PMPPASS
Building has been demolished. Area surround by fencing. NO activitiy. NO trackout or discharges. Will continue to monitor and will conduct ESC site prep when BLD for new building is issued.
ESC19-01251 General Inspection7/22/20207/22/20207/22/2020 4:34:15 PM CANC
ESC19-01250 General Inspection7/22/20207/22/20207/22/2020 4:34:03 PM CANC
ESC19-00971 Aging Inspection7/22/20207/22/20207/22/2020 4:32:30 PM PASS
BLD finaled, no ESC requests or issues at site. Permit closed.
ESC19-00971 DOC - Permit Finaled7/22/20207/22/20207/22/2020 4:32:03 PMPPASS
ESC19-01372 Aging Inspection7/22/20207/22/20207/22/2020 4:00:05 PM DEFR
ESC20-00682 Site Preparation7/22/20207/22/20207/22/2020 3:59:51 PMPPASS
provide ESC sign

WIP on back of home and new basement. Posted sign on Washington Street. Access off alley. Will follow up for washout containment
ESC20-00572 Site Preparation7/20/20207/22/20207/22/2020 3:40:47 PMPPASS
after 2pm- Ted- screened Phone #: ###-####

Bridge work to begin Monday. Most construction activity will occur during night during reduced traffic and greenbelt use.

Will work on bridge deck in phases, each section of deck being worked upon will have a containment "diaper" under deck to capture any debris or other material.

Plan is to have trucks washout back at their own facility. Pumptruck and concrete will be stationed on 9th during night. Request that spill containment/drip pans be placed under transfer area.

Provided ESC permit signs. Will use some area in library parking lot for staging. If on pavers, will have secondary containment.

Approved for construction.
ESC17-01632 Conference7/22/20207/22/20207/22/2020 9:56:08 AMPDONE
New project manager Kieth Larue w/ Point Core Construction

775 ###-####

Plan is to do some maintenance and re-install of BMPs and Keith will call for a follow up inspection.
ESC18-01455 General Inspection7/22/20207/22/20207/22/2020 8:35:31 AM CANC
ESC17-00954 General Inspection7/22/20207/22/20207/22/2020 8:35:08 AM CANC