Inspections for the day of: Thursday, July 23, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00655 General Inspection7/23/20157/23/20157/24/2015 11:01:16 AM FAIL
Loose dirt, uncontained trash and building materials along Raymond street. Loose trash, no liquid waste washout provided and messy within apartment complex as well. Stormdrains do have inlet protection.

Corrections:
1. Pick up all uncontained trash and litter around new Aberdeen phase perimeter and within site.
2. Provide additional trash containers/dumpster for site as needed.
3. Empty full trash containers.
4. Sweep Raymond Street.
5. Provide liquid waste washout (lined pit or leakproof container)

Correction issued to Biltmore RP. Will reinspect Monday afternoon

ESC14-01120 General Inspection7/23/20157/23/20157/24/2015 10:28:35 AM CANC
ESC14-01023 General Inspection7/23/20157/23/20157/23/2015 4:10:40 PMPPASS
Site is now landscaped. Crew reapairing section of sidewalk.

Permit will be finaled upon removal of temp BMPs (2 inlet bags)
ESC14-00299 BMP Violation7/23/20157/23/20157/23/2015 3:49:41 PMPPART
Corrections completed:

1. Street, sidewalk, and gutter were swept.
2. DI bag was emptied out and re-installed
3. Trash container that was overflowing was emptied.
4. Dirt swept off of lower retaining walls
5. Wattles brought to site (but not properly installed)

Correction needed and due next week or re-inspection fee will be needed:

Install wattles per manufacturer's details (staked and trenched in.
ESC14-00731 General Inspection7/23/20157/23/20157/23/2015 3:31:36 PM PASS
WIP. Section of sidewalk & gutter are being repaired. Existing sidewalk is clear of sediment and no discharges or other issues observed.
ESC14-00930 Complaint Inspection7/23/20157/23/20157/23/2015 3:19:59 PMPPART
No discharges, hillside erosion or other issues around. Landscaping is currently in progress.

Corrections:

-Properly dispose the wattles that were used for perimeter sediment control. Currently piled across street on vacant lot
- sweep up dirt piles on road from the landscape crew tractor hauling dirt up and down the street.

VM left for home owner RP D. Wali. Will check back to see when corrections can be made.
ESC15-00138 Aging Inspection7/23/20157/23/20157/23/2015 2:58:34 PM PASS
ESC14-01124 General Inspection7/23/20157/23/20157/23/2015 2:06:37 PM PASS
WIP on landscaping and finishing touches. Near completion. Street, sidewalk and gutter are clean, front yard has been sodded. No corrections issued.
ESC15-00861 Site Preparation7/22/20157/23/20157/23/2015 1:29:18 PMPCANC
rescheduled
ESC13-00117 General Inspection7/23/20157/23/20157/23/2015 1:23:31 PM PASS
ESC14-00608 General Inspection7/23/20157/23/20157/23/2015 11:11:59 AM PASS
WIP on homes. No new subdivision work occuring. All DIs protected. No trackout or spills observed. No violations observed.
ESC15-00465 Random Inspection7/23/20157/23/20157/23/2015 11:02:36 AMPPASS
Preschool in progress. Permit sign posted, BMPs installed (DI bag, construction entrance, waste containment). Will need to clean up temporary ramp in gutter once curb is cut.
ESC15-00116 Aging Inspection7/23/20157/23/20157/23/2015 10:48:47 AM PASS
Home complete, landscaped, and stabilized. ESC permit conditions satisfied.
ESC15-00116 DOC - Permit Finaled7/23/20157/23/20157/23/2015 10:48:06 AMPPASS
ESC14-00788 Conference7/23/20157/23/20157/23/2015 10:39:07 AMAPEND
Road within Privada was swept and DI bag installed as requested.

NO new erosion controls implemented on slopes, but retaining walls to be constructed next week. Will reinspect to see which BMPs are needed.

ESC15-00033 General Inspection7/23/20157/23/20157/23/2015 8:36:55 AM PASS