Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00778 General Inspection7/23/20187/23/20187/23/2018 4:35:16 PMPPASS
ESC18-00313 Conference7/23/20187/23/20187/23/2018 4:24:21 PMPDONE
Project manager notified that the interior of the site will be completed at this time with the rest of the active construction. Cleared by BLD inspector and PW Drainage. No change in permitted area of disturbance.
ESC17-00838 General Inspection7/23/20187/23/20187/23/2018 4:17:55 PM PASS
TI in progress. No discharges, loose dirt or dust around work area. No corrections requested.
ESC18-00503 BMP Violation7/20/20187/23/20187/23/2018 1:25:38 PMAPEND
check on rocks

Email from neighbor & contractor discussing that rock clean up was completed.

Will schedule conference with RP to discuss alternative to rock construction entrance or utilize proper installation technique.
ESC17-00687 General Inspection7/23/20187/23/20187/23/2018 1:24:08 PM CANC
ESC16-00812 Aging Inspection7/23/20187/23/20187/23/2018 1:23:45 PM PEND
No activity at site. BLD not yet fully expired. No sediment runoff or other ESC issues occuring at site. Grass & vegetation is drying out and dying
ESC17-00682 General Inspection7/23/20187/23/20187/23/2018 1:10:50 PM CANC
rescheduled for site final
ESC16-00290 Aging Inspection7/23/20187/23/20187/23/2018 1:02:18 PM CANC
ESC18-00849 Site Final7/23/20187/23/20187/23/2018 1:01:58 PMPPASS
Demolition complete, lot graded flat. No debris or trackout. ESC permit conditions satisfied. BLD finaled.
ESC18-00850 Site Final7/23/20187/23/20187/23/2018 12:56:33 PMPPASS
Demolition complete. No debris, stockpiles or materials left on site. No ESC corrections, permit finaled.
ESC15-01420 General Inspection7/23/20187/23/20187/23/2018 12:51:08 PM PASS
All lots except one are occupied/stabilized with completed SFHs. No temporary BMPs remaining, all disturbed areas stabilized. Common areas vegetated. ESC permit conditions for subdivision construction are satisfied, ESC permit finaled.
ESC15-01420 DOC - Permit Finaled7/23/20187/23/20187/23/2018 12:49:48 PMPPASS
ESC16-01560 Conference7/23/20187/23/20187/23/2018 12:16:01 PMADONE
dewatering conference

Brighton and operator Brown to connect 20 lineal feet of sewer west of the Veranda site onto adjacent parcel.

Will utilize existing bermed area to land apply and allow infiltration & evaporation. 3 areas of the berm along Walling Creek need additional fill to prevent any discharge.

Project scheduled Wednesday to Friday. Follow up inspection scheduled.