Inspections for the day of: Tuesday, July 24, 2018.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01210 General Inspection7/24/20187/24/20187/26/2018 11:56:32 AM PASS
7 new SFH in progress, one project in plan review, and one pool under construction. Storm drains along Mockbee have been left open (no DI bags) to prevent runoff from existing subdivsion down Sherman. Sites are individually permited, no discharges, trackout, significant dust, or loose trash around.

No corrections requested.
ESC17-01791 BMP Violation7/23/20187/24/20187/25/2018 3:15:21 PMAFAIL
Verbal correction request issued to RP Tyler.

- sweep up staging area to remove any wallboard, demo dust, or concrete dust Do not use blower. If rinsed, contain wash waters.
- sweep sidewalk and gutter on Main Street.
ESC16-00945 General Inspection7/24/20187/24/20187/25/2018 8:17:04 AM CANC
ESC16-00625 General Inspection7/24/20187/24/20187/25/2018 8:12:22 AM CANC
ESC15-01138 General Inspection7/24/20187/24/20187/25/2018 8:12:13 AM CANC
ESC17-01473 Conference7/20/20187/24/20187/24/2018 12:31:43 PMAPASS
check on suez project...

Dewatering & water line flushing was conducted yesterday and was land applied to the grassy area in Julia Davis Park. No discharge to waterway through the Zoo occurred. Excavation and temporary holding pit have been filled in. Wattles were not disturbed.

Reveiwed dewatering and flushing rules with water line project operator Justin with Gully Excavation.

No violations.
ESC18-00222 General Inspection7/24/20187/24/20187/24/2018 8:24:01 AMPCANC
ESC16-01410 General Inspection7/24/20187/24/20187/24/2018 8:08:27 AM CANC
ESC18-00365 Site Preparation7/23/20187/24/20187/23/2018 12:00:00 AMACANC
Maite Phone #: ###-####