Inspections for the day of: Wednesday, July 24, 2019.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01491 General Inspection7/24/20197/24/20197/24/2019 2:06:47 PM PASS
ESC18-00583 Site Final7/24/20197/24/20197/24/2019 1:57:10 PMPPASS
see ESC16-01561 for final site corrections for Park Place phase 4/5. This unit complete
ESC18-00564 Site Final7/24/20197/24/20197/24/2019 1:56:57 PMPPASS
see ESC16-01561 for final site corrections for Park Place phase 4/5. This unit complete
ESC18-01402 Site Final7/24/20197/24/20197/24/2019 1:56:42 PMPPASS
see ESC16-01561 for final site corrections for Park Place phase 4/5. This unit complete
ESC18-01401 Site Final7/24/20197/24/20197/24/2019 1:56:31 PMPPASS
see ESC16-01561 for final site corrections for Park Place phase 4/5. This unit complete
ESC18-01410 Site Final7/24/20197/24/20197/24/2019 1:56:19 PMPPASS
see ESC16-01561 for final site corrections for Park Place phase 4/5. This unit complete
ESC18-01409 DOC - Permit Finaled7/24/20197/24/20197/24/2019 1:56:05 PMPPASS
see ESC16-01561 for final site corrections for Park Place phase 4/5. This unit complete
ESC19-00324 General Inspection7/24/20197/24/20197/24/2019 1:54:20 PMPFAIL
Corrections needed and onsite inspection with Granite SWPPP inspector scheduled for next week.

- clean up gutter on Teresa, replace storm drain sediment bag
- provide schedule of next phase of construction.
- extend existing perimter controls along Teresa to have barrier along entire frontage. Recommend silt fence.
- slope interupting wattle placment should also be determined.

Notified James with Granite. Follow up scheduled.
ESC16-01561 General Inspection7/24/20197/24/20197/24/2019 1:48:55 PM PEND
construction complete. See site final corrections needed.
ESC16-01561 Site Final7/24/20197/24/20197/24/2019 1:48:13 PMPNR
Corrections needed to get ESC site final:
- remove all temporary storm drain bags installed on Exacta, Trifecta, and Homestead.
- sweep and clean up dirt and debris in gutter at Walling Creek end of Homestead.
- remove portapots and any other construction materials.
ESC18-00748 Site Final7/24/20197/24/20197/24/2019 1:29:56 PMPPASS
ESC18-00212 Aging Inspection7/24/20197/24/20197/24/2019 1:24:56 PM PASS
townhome complete and landscaped. No ESC requests. Black Rock will pull any remaining storm drain bags.
ESC18-00212 DOC - Permit Finaled7/24/20197/24/20197/24/2019 1:24:46 PMPPASS
ESC18-00211 Aging Inspection7/24/20197/24/20197/24/2019 1:24:36 PM PASS
townhome complete and landscaped. No ESC requests. Black Rock will pull any remaining storm drain bags.
ESC18-00211 DOC - Permit Finaled7/24/20197/24/20197/24/2019 1:23:54 PMPPASS
ESC18-00799 Aging Inspection7/24/20197/24/20197/24/2019 1:17:36 PM PASS
WIP. BMPs installed. Subdivsion needs final sweep and then storm drain bag removal.
ESC17-00774 General Inspection7/24/20197/24/20197/24/2019 12:53:39 PM PASS
ESC18-01069 Site Final7/24/20197/24/20197/24/2019 12:51:25 PMPPASS
Storm drain sedment bag behind home removed as requested. ESC permit finaled.
ESC18-01575 Site Final7/24/20197/24/20197/24/2019 11:52:49 AMPPASS
Home complete and occupied. All permits finaled. No ESC request. Permit finaled
ESC18-01320 General Inspection7/24/20197/24/20197/24/2019 10:57:30 AM CANC
rescheduled for site final
ESC18-00748 Aging Inspection7/24/20197/24/20197/24/2019 10:47:01 AM CANC
ESC18-01355 General Inspection7/24/20197/24/20197/24/2019 8:05:56 AM CANC
ESC18-01354 General Inspection7/24/20197/24/20197/24/2019 8:05:48 AM CANC