Inspections for the day of: Monday, July 25, 2016.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01175 General Inspection7/25/20167/25/20167/25/2016 4:01:50 PM CANC
ESC15-01395 General Inspection7/25/20167/25/20167/25/2016 3:57:44 PM PASS
Need to conduct sweeping on Broad and Myrtle. Walk through inspection scheduled for tomorrow AM
ESC15-01532 General Inspection7/25/20167/25/20167/25/2016 3:34:15 PM PASS
New pathway section is paved and complete under all bridge under passes. Silt fence and wattles still installed while landscaping is in progress. Crews working on installing railings and site improvements and Fairview bridge. No violations observed. BMPs installed. RP-GC Brent with CPC stated he wants to sign off with Boise P&R on August 5th.

Striping, landscaping, and site clean up & material removal to occur this week and next. Will check back in August to see what corrections may remain.
ESC15-01534 General Inspection7/25/20167/25/20167/25/2016 2:41:50 PMPPASS
Offsite utility work occuring at the Darigold engine room upgrade. Most work is complete, no discharges, trackout or fugitive dust issues. Initial site prep inspections and general inspections were conducted under ESC15-01103, which is now closed out.

No corrections requested.
ESC15-01103 General Inspection7/25/20167/25/20167/25/2016 2:39:59 PMPCANC
duplicate inspection
ESC15-01103 DOC - Permit Finaled7/25/20167/25/20167/25/2016 2:37:09 PMPPASS
Project near completion. Remain site and offsite utility work covered under ESC15-01534
ESC03-01478 DOC - Permit Finaled7/25/20167/25/20167/25/2016 2:35:47 PMPPASS
no inspection, old expired permit in system
ESC16-00876 General Inspection7/12/20167/25/20167/25/2016 2:19:56 PMAFAIL
Verbal CN to RP Bobby to have gutter and sidewalk swept ASAP. Cement dust resdue left in street and gutter. Does not appear any BMPs were used for containing waste concrete/cement materials.

Will check back tomorrow PM for follow up clean up....
ESC16-00951 General Inspection7/25/20167/25/20167/25/2016 1:54:19 PMPPASS
Residential in progress. No trackout. Home already removed, so no water truck on site. No corrections issued.
ESC15-00695 Aging Inspection7/25/20167/25/20167/25/2016 1:37:24 PM PASS
ESC15-00729 General Inspection7/25/20167/25/20167/25/2016 1:37:23 PM PASS
Inspection conducted on the upper areas of Harris Ranch North. Slope stabilization BMPs (tracking, wattles, seeding) have worked well. No hillside or slope erosion areas of concern.

The water tank up top is now complete and associated ESC permit has been closed. Surrounding disturbed area has been waddled and hydroseeded/temporary stabilizztion.

Active hauling and grading for roads is in progress. Two water trucks circulating site to keep down dust. Ground is very dry, but the dust suppression is working well on the busy routes.

Some minor trackout to Barber Driver, RP Chad stated that street sweepers come 2x weekly. Will check back this week to see if sweeping has occured.

Retaining wall in Council Springs area is in progress. Damaged silt fence has been removed and will be replaced upon completion.

Road paving is scheduled for late August or early September.

No violations, issues of concern , or corrections requestd. Syman Co. and Hunter Homes monitoring ESC responsibilities well.
ESC16-00217 Site Preparation7/25/20167/25/20167/25/2016 10:52:28 AMPPASS
Clint Phone #: ###-####

East Valley SFHs by Tahoe are in compliance. Permit signs posted, BMPs installed. No loose trash or debris blowing around. Lined washout with capacity. Approved.
ESC15-00850 Site Final7/25/20167/25/20167/25/2016 10:44:53 AMPNR
Need to remove DI bag on River Basin and clean up sediment and dirt accumulated outside of inlet. Will check back 8/5

Verbal correction request left to Alturas Construction to remove DI bag for site final. BLD is finaled.
ESC15-01286 General Inspection7/25/20167/25/20167/25/2016 10:44:23 AMPPART
Need to remove DI bag on River Basin and clean up sediment and dirt accumulated outside of inlet. Will check back 8/5

Verbal correction request left to Alturas Construction to remove DI bag for site final. BLD is finaled.
ESC15-01236 DOC - Permit Finaled7/25/20167/25/20167/25/2016 10:26:31 AMPPASS
SFH complete, permits finaled & ESC conditons satisfied. Tahoe Homes to remove DI bags when construction in area is complete.
ESC15-01054 DOC - Permit Finaled7/25/20167/25/20167/25/2016 10:26:20 AMPPASS
SFH complete, permits finaled & ESC conditons satisfied. Tahoe Homes to remove DI bags when construction in area is complete.
ESC16-00159 General Inspection7/25/20167/25/20167/25/2016 10:21:42 AMPPASS
Subdivision grading, road & utilitiy installation, and parcel prep complete in DHE #14. Silt fence along creek has been removed. Flat parcels do not have temporary stabilization, but not windblown dust or sediment runoff issues occuring.

Will need to re-seed the widened area of creek in fall and remove all temp BMPs installed (check dams, coffer dam and diversion tube, plastice at outlet.
ESC16-00489 General Inspection7/25/20167/25/20167/25/2016 10:14:17 AMPPASS
Utility and telecommunications lines being installed at DHE #15. No roads completed yet. Buffer strip left between graded area and the currently dry Warm Springs Creek. All receiving inlets SW of the work have sediment filter bags that are in good condition with remaining capacity. No trackout, no fugitive dust at time of inspection.
ESC16-00184 General Inspection7/25/20167/25/20167/25/2016 9:57:50 AMAPASS
Home complete, landscaped, and occupied. All permits finaled.
ESC16-00184 DOC - Permit Finaled7/25/20167/25/20167/25/2016 9:57:28 AMPPASS
ESC16-00356 General Inspection7/25/20167/25/20167/25/2016 9:56:56 AMAPASS
Permit sign posted, no trackout, spills or other material leaving site. Yard not yet landscaped/stabilized. WIP
ESC15-00931 General Inspection7/25/20167/25/20167/25/2016 9:51:58 AM PASS
Home complete, landscaped and hard surfaces swept of loose materials.

Request to RP-GC to remove DI bag on Spinnaker and will final all Tianna Park units.
ESC15-00251 Aging Inspection7/25/20167/25/20167/25/2016 8:59:19 AM PASS
Home complete, ESC conditions satisfied. all permits finaled. Temp BMPs to remain while active SFH are in progress at DHE.
ESC15-00251 DOC - Permit Finaled7/25/20167/25/20167/25/2016 8:58:29 AMPPASS