Inspections for the day of: Friday, July 27, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01074 Site Preparation7/27/20187/27/20187/27/2018 4:50:14 PMPPASS
project has started, sorry. Call me if you would like to meet me there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
ESC18-00313 General Inspection7/27/20187/27/20187/27/2018 4:34:38 PMPPASS
ESC18-00792 Random Inspection7/27/20187/27/20187/27/2018 3:47:36 PMPPASS
Site grading and infrastructure work is ongoing. Water truck onsite doing good job with fugitive dust control. Some minor trackout and puddle near fire hydrant being used to fill water truck will need to be cleaned up.
ESC17-01172 General Inspection7/27/20187/27/20187/27/2018 3:05:18 PMPPASS
WIP on interior. Shell complete. Parking lot curbs have been poured but not yet paved. No trackout to Shamrock or Fairview. No correcitons requested.
ESC18-00659 General Inspection7/27/20187/27/20187/27/2018 3:04:14 PMPPASS
No activity. Excavators and scrapers still staged on site. No dust occurring.
ESC18-00112 Site Final7/27/20187/27/20187/27/2018 2:48:30 PMPPASS
Monument sign installed. Main building and site under construction. See ESC17-01172
ESC17-00027 General Inspection7/27/20187/27/20187/27/2018 2:47:34 PM CANC
ESC16-01027 General Inspection7/27/20187/27/20187/27/2018 2:47:22 PMPPASS
WIP on painting units and completing landscaping. Trash contained. No significant trackout to Irving. ESC permit sign posted, temp BMPs installed
ESC16-01675 General Inspection7/25/20187/27/20187/27/2018 2:47:12 PMAPASS
WIP on painting units and completing landscaping. Trash contained. No significant trackout to Irving. ESC permit sign posted, temp BMPs installed
ESC17-00375 General Inspection7/27/20187/27/20187/27/2018 2:32:46 PM PASS
1 lot under excavation in Hollowrose. Other units near completion. No violations observed.
ESC17-01388 Site Final7/27/20187/27/20187/27/2018 2:23:26 PMPPASS
Home comoplete, landscaped, and occupied. No ESC requests.
ESC17-01346 General Inspection7/27/20187/27/20187/27/2018 2:17:40 PMPPASS
Vertical construction in progress. No trackout, discharges, or loose material in streets & gutters around site. DIs have sediment protection.
ESC18-00872 General Inspection7/27/20187/27/20187/27/2018 11:52:21 AMPPASS
First section of path from the Friendship bridge to the Greenbelt and road is complete. Second section will be installed around the Zoo perimeter. Stockpile stored along road belongs to pathway project, may require protection or relocation. Not stored next to storm drain.
ESC17-01130 Aging Inspection7/27/20187/27/20187/27/2018 11:00:20 AM PASS
ESC17-01130 DOC - Permit Finaled7/27/20187/27/20187/27/2018 11:00:15 AMPPASS
ESC17-01228 Aging Inspection7/27/20187/27/20187/27/2018 10:10:30 AM PASS
Detached garage is complete. Disturbed area stabilized. No ESC corrections needed.
ESC17-01228 DOC - Permit Finaled7/27/20187/27/20187/27/2018 10:09:44 AMPPASS
ESC17-01044 Aging Inspection7/27/20187/27/20187/27/2018 10:01:09 AM PASS
Home complete and landscaped. All permits finaled. No ESC requests/corrections.
ESC17-01044 DOC - Permit Finaled7/27/20187/27/20187/27/2018 10:00:36 AMPPASS