PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, July 27, 2018
.
Number of inspections:
19
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01074
Site Preparation
7/27/2018
7/27/2018
7/27/2018 4:50:14 PM
P
PASS
project has started, sorry. Call me if you would like to meet me there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
ESC18-00313
General Inspection
7/27/2018
7/27/2018
7/27/2018 4:34:38 PM
P
PASS
ESC18-00792
Random Inspection
7/27/2018
7/27/2018
7/27/2018 3:47:36 PM
P
PASS
Site grading and infrastructure work is ongoing. Water truck onsite doing good job with fugitive dust control. Some minor trackout and puddle near fire hydrant being used to fill water truck will need to be cleaned up.
ESC17-01172
General Inspection
7/27/2018
7/27/2018
7/27/2018 3:05:18 PM
P
PASS
WIP on interior. Shell complete. Parking lot curbs have been poured but not yet paved. No trackout to Shamrock or Fairview. No correcitons requested.
ESC18-00659
General Inspection
7/27/2018
7/27/2018
7/27/2018 3:04:14 PM
P
PASS
No activity. Excavators and scrapers still staged on site. No dust occurring.
ESC18-00112
Site Final
7/27/2018
7/27/2018
7/27/2018 2:48:30 PM
P
PASS
Monument sign installed. Main building and site under construction. See ESC17-01172
ESC17-00027
General Inspection
7/27/2018
7/27/2018
7/27/2018 2:47:34 PM
CANC
ESC16-01027
General Inspection
7/27/2018
7/27/2018
7/27/2018 2:47:22 PM
P
PASS
WIP on painting units and completing landscaping. Trash contained. No significant trackout to Irving. ESC permit sign posted, temp BMPs installed
ESC16-01675
General Inspection
7/25/2018
7/27/2018
7/27/2018 2:47:12 PM
A
PASS
WIP on painting units and completing landscaping. Trash contained. No significant trackout to Irving. ESC permit sign posted, temp BMPs installed
ESC17-00375
General Inspection
7/27/2018
7/27/2018
7/27/2018 2:32:46 PM
PASS
1 lot under excavation in Hollowrose. Other units near completion. No violations observed.
ESC17-01388
Site Final
7/27/2018
7/27/2018
7/27/2018 2:23:26 PM
P
PASS
Home comoplete, landscaped, and occupied. No ESC requests.
ESC17-01346
General Inspection
7/27/2018
7/27/2018
7/27/2018 2:17:40 PM
P
PASS
Vertical construction in progress. No trackout, discharges, or loose material in streets & gutters around site. DIs have sediment protection.
ESC18-00872
General Inspection
7/27/2018
7/27/2018
7/27/2018 11:52:21 AM
P
PASS
First section of path from the Friendship bridge to the Greenbelt and road is complete. Second section will be installed around the Zoo perimeter. Stockpile stored along road belongs to pathway project, may require protection or relocation. Not stored next to storm drain.
ESC17-01130
Aging Inspection
7/27/2018
7/27/2018
7/27/2018 11:00:20 AM
PASS
ESC17-01130
DOC - Permit Finaled
7/27/2018
7/27/2018
7/27/2018 11:00:15 AM
P
PASS
ESC17-01228
Aging Inspection
7/27/2018
7/27/2018
7/27/2018 10:10:30 AM
PASS
Detached garage is complete. Disturbed area stabilized. No ESC corrections needed.
ESC17-01228
DOC - Permit Finaled
7/27/2018
7/27/2018
7/27/2018 10:09:44 AM
P
PASS
ESC17-01044
Aging Inspection
7/27/2018
7/27/2018
7/27/2018 10:01:09 AM
PASS
Home complete and landscaped. All permits finaled. No ESC requests/corrections.
ESC17-01044
DOC - Permit Finaled
7/27/2018
7/27/2018
7/27/2018 10:00:36 AM
P
PASS