Inspections for the day of: Friday, July 29, 2016.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01287 General Inspection7/29/20167/29/20167/29/2016 3:32:48 PM PASS
ESC16-00175 General Inspection7/29/20167/29/20167/29/2016 3:00:31 PMPPASS
Boise Hills Park project is currently inacvited. BMPs installed, ESC permit posted. No issues at site.
ESC16-00353 General Inspection7/29/20167/29/20167/29/2016 2:59:42 PMPPASS
Crew on site preping road base for Nature View extension into Somerset Ridge #6. Receiving storm water gutter and drain has sediment protection. Water truck on site for compaction and dust control as needed. No dust issues at time of inspection. No trackout to Clubview, no discharges. Approved.
ESC15-01502 Site Final7/29/20167/29/20167/29/2016 2:32:44 PMPNR
Need to clean up loose dirt around site perimeter in alley. Appears some still occuring on the Children School playground across alley...will monitor for further clean up/stabilization.
ESC16-00558 BMP Violation7/28/20167/29/20167/29/2016 2:17:49 PMPPEND
verbal notice issued to CBH RP. Inspection to occur Monday
ESC15-01256 General Inspection7/29/20167/29/20167/29/2016 2:17:12 PM PASS
Home construction complete. Not yet landscaped/stabilized. Active projects on both sides. Painted Rock will need final site clean up to get ESC permits closed. No discharges or pollution sources onsite.
ESC13-00193 General Inspection7/29/20167/29/20167/29/2016 2:16:57 PM PASS
Only 3 open parcels left. Subdivision DIs have protection, open lots on Mesa Verde have perimeter sediment control wattles installed. No violations observed.
ESC15-01368 Aging Inspection7/29/20167/29/20167/29/2016 2:12:35 PM PASS
Clean infill project. No trackout, no loose construction materials or waste. No acitvity at time of inspection. No corrections necessary.
ESC16-00178 BMP Violation7/29/20167/29/20167/29/2016 2:08:36 PMPPEND
ESC15-01224 General Inspection7/28/20167/29/20167/29/2016 10:15:18 AMAPASS
Library foundation and footprint are complete. Walls and beams are erected. Site surrounded by construction fencing. Permanent stormwater retention system and parking lot paving is near complete, except for a few areas.

No fugitive dust, spills/discharges. Trash and materials contained. No corrections needed.
ESC15-00729 Tracking Control7/29/20167/29/20167/29/2016 9:54:25 AMAPART
No active trackout to traffic lanes on Barber from main HRN entrance, however bike lanes have been dirty since inspection conducted earlier this week.

Correction request to have the sweepers specifically address the bike lanes and curbs on bike lanes.
ESC15-01375 DOC - Permit Finaled7/29/20167/29/20167/29/2016 9:49:39 AMPPASS
Home complete, landscaped and occupied. No temp BMP removal since new DHE phases will soon start SFH construction east of Shadywood.
ESC15-01376 Aging Inspection7/29/20167/29/20167/29/2016 9:49:21 AM PASS
Home complete, landscaped and occupied. No temp BMP removal since new DHE phases will soon start SFH construction east of Shadywood.
ESC15-01376 DOC - Permit Finaled7/29/20167/29/20167/29/2016 9:49:10 AMPPASS
ESC15-01378 Aging Inspection7/29/20167/29/20167/29/2016 9:49:02 AM PASS
Home complete, landscaped and occupied. No temp BMP removal since new DHE phases will soon start SFH construction east of Shadywood.
ESC15-01378 DOC - Permit Finaled7/29/20167/29/20167/29/2016 9:48:47 AMPPASS
ESC15-00885 General Inspection7/29/20167/29/20167/29/2016 9:07:51 AM PASS
Townhome complete. Subdivsion BMPs in good condition. Active projects ongoing. RP onsite. All permits finaled.
ESC15-00885 DOC - Permit Finaled7/29/20167/29/20167/29/2016 9:07:03 AMPPASS
ESC16-00178 Site Preparation7/26/20167/29/20167/29/2016 9:06:20 AMACANC
data entry error, see BMP violation inspection
ESC16-00611 Site Preparation7/28/20167/29/20167/28/2016 3:00:58 PMPCANC
data entry