Inspections for the day of: Tuesday, July 30, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00398 General Inspection7/30/20197/30/20198/2/2019 3:09:32 PMPCANC
ESC17-01473 Site Final7/31/20197/30/20198/1/2019 2:02:22 PMPCANC
ESC19-00506 BMP Violation7/31/20197/30/20197/31/2019 5:39:27 PMPFAIL
Multiple violations at site:

Compliance date:
- complete all listed corrections by end of day Monday August
ESC16-00935 General Inspection7/30/20197/30/20197/31/2019 12:29:09 PMPPEND
Storm drain sumps in road way and for the house drainage system have been hydro-vac'd.

Need to get geotechnical report on slope that was damaged during the water line break in early July.
ESC16-01457 General Inspection7/30/20197/30/20197/31/2019 8:24:08 AM PASS
No new activity
ESC16-01472 General Inspection7/30/20197/30/20197/31/2019 8:23:54 AM PASS
Landscaping still in progress. Downslope silt fence system is still installed.
ESC18-01383 General Inspection7/30/20197/30/20197/30/2019 2:47:30 PM CANC
rescheduled for site final
ESC19-00574 Site Preparation7/30/20197/30/20197/30/2019 2:34:22 PMPNR
check on project

Project manager/RP is currently on vacation.

Tree removal is in progress. New fence post installation utilized a concrete washout pan.

Correction request to install sediment protection in the storm drain at end of the Lander Street parking area valley drain. There is loose dirt and material on parking lot surface from the tree removal/landscape grubbing.

RP is to return next week. Will conduct Site Preparation inspection walk through at that time.
ESC18-01754 Site Final7/29/20197/30/20197/30/2019 12:15:40 PMANR
Gary Phone #: ###-####

Remove DI bags installed within parking lot after sweeping the staging area. Follow up scheduled. Unclear if bags now installed on Broad and Capitol are associated with a road project.
ESC18-00792 Site Final7/30/20197/30/20197/30/2019 12:13:08 PMPNR
ESC items remaining for site final.

- finish landscaping and site improvements.
- sweep up gutters surrouding site on Denton, Curtis, and Emerald
- Remove DI bag on west side access road

Note: CSC responsible for finshing road work on Curtis northbound lanes and cleaning up gutter between road patch and intersectioin
ESC18-00792 BMP Violation7/30/20197/30/20197/30/2019 12:09:01 PMPFAIL
Landscaping crew has allowed concrete truck to dump washout on gound. Notified RP to clean up and provide new washout ASAP
ESC19-00740 Site Final7/30/20197/30/20197/30/2019 11:32:12 AMPPASS
Sign installed. See ESC18-00792 for remaining ESC corrections for site final.
ESC18-00980 Aging Inspection7/30/20197/30/20197/30/2019 10:17:53 AM CANC
rescheduled for site final
ESC18-00972 Aging Inspection7/30/20197/30/20197/30/2019 10:17:17 AM CANC