Inspections for the day of: Monday, July 6, 2015.
Number of inspections: 32
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00302 Aging Inspection7/6/20157/6/20157/7/2015 3:30:03 PM PASS
Yard is landscaped and stabilized. BLD open but no further ESC inspections necessary.
ESC14-00860 Site Final7/2/20157/6/20157/7/2015 11:33:28 AMANR
WIP on carports. Some loose dirt in unfinished section will be swept up before paint striping. No discharges, spills, or trackout. DI bags were removed previously but will wait till all work, equipment, and loose dirt is swept.
ESC14-01040 General Inspection7/6/20157/6/20157/7/2015 11:16:09 AM PASS
WIP on 4-plex frames. Site is enclosed by construction fencing and some vegetation/weeds was left along the perimeter. No sediment runoff to sidewalks, streets, or gutters. DI on Shelly has inlet bag. Designated lined washout has plenty of capacity for paint and other liquid washouts.

No corrections necessary at this time. Some dirt within site should be swept during weekly housekeeping.
ESC13-00088 Aging Inspection7/6/20157/6/20157/6/2015 4:08:06 PM PASS
No excavation or earth disturbance remaining for addition. Some work appears to be ongoing but no loose sediment or other construction related material leaving site. No activity on BLD permit in over 6 months. Permit closed; no further inspections required.
ESC13-00088 DOC - Permit Finaled7/6/20157/6/20157/6/2015 4:06:08 PMPPASS
ESC13-00444 Aging Inspection7/6/20157/6/20157/6/2015 3:53:06 PM CANC
ESC14-00031 Aging Inspection7/6/20157/6/20157/6/2015 3:52:55 PM PASS
Boise P&R annual permit. No inspection
ESC15-00028 DOC - Permit Finaled7/6/20157/6/20157/6/2015 3:51:33 PMPPASS
ESC14-00266 General Inspection7/6/20157/6/20157/6/2015 3:42:45 PM PASS
Slope revegetating. No issues.
ESC14-00002 Aging Inspection7/6/20157/6/20157/6/2015 3:40:28 PM PASS
Construction complete. No loose sediment or unstabilized areas. BLD open but ESC permit conditions satisfied. Permit finaled.
ESC14-00002 DOC - Permit Finaled7/6/20157/6/20157/6/2015 3:39:34 PMPPASS
ESC14-00650 General Inspection7/6/20157/6/20157/6/2015 3:33:30 PM PASS
WIP. No violations.
ESC14-00572 General Inspection7/6/20157/6/20157/6/2015 3:23:35 PM PASS
Temp BMPs still installed and necessary until full stabilization occurs. No significant rills or issues observed at time of inspection. Will continue to monitor.
ESC15-00619 Site Preparation7/6/20157/6/20157/6/2015 3:16:11 PMPPASS
Dave Phone #: ###-####

Permit sign posted. Perimeter wattles properly installed. RP Dave stated washout pit at bottom of Bent Bow will be used. No corrections. Project approved to start.
ESC15-00681 Site Preparation7/2/20157/6/20157/6/2015 2:53:01 PMAPASS
Brett Phone #: ###-####
ESC14-01105 General Inspection7/6/20157/6/20157/6/2015 2:14:45 PM PASS
ESC15-00129 DOC - Permit Finaled7/6/20157/6/20157/6/2015 12:44:31 PMPPASS
ESC15-00718 Site Preparation7/6/20157/6/20157/6/2015 12:35:45 PMPPASS
Clint Phone #: ###-####

East Valley new SFH. Note street name sign currently says "Marquee" Tahoe Homes in new subdivision are in compliance. No fugitive dust, trash and materials are contained, lined washout onsite, and no trackout or discharges. Approved for construction.
ESC14-01083 General Inspection7/6/20157/6/20157/6/2015 12:26:36 PM PASS
BMPs installed and include lined washout bin, DI protection, and perimeter sediment control. Crews onsite working on foundations and plumbing for new townhomes. Trash is contained. WIP, no corrections needed currently.
ESC15-00670 Site Preparation7/6/20157/6/20157/6/2015 12:22:44 PMPPASS
Inspection requested via web by Erby Gonzales

Permit sign is posted with contact info. Receiving inlet has sediment bag protection, lined concrete washout is provided for Mill District Square. Active projects currently in good condition. Approved.
ESC15-00740 Site Preparation7/6/20157/6/20157/6/2015 12:21:03 PMPPASS
Inspection requested via web by Erby Gonzales



Permit posted. BMPs installed. Site in between two occupied homes. No issues on other Brighton Homes in RH#5
ESC14-01035 General Inspection7/6/20157/6/20157/6/2015 12:02:11 PM PASS
Bowne Crossing medical clinic is complete. Site is stabilized and landscaped, permanent stormwater swale is installed, and temporary BMPs removed. ESC permit conditions satisfied. All other permits have Final status.
ESC14-00824 DOC - Permit Finaled7/6/20157/6/20157/6/2015 12:00:37 PMPPASS
ESC15-00693 Site Preparation7/6/20157/6/20157/6/2015 11:59:35 AMPPASS
Inspection requested via web by Erby Gonzales


New Barber Valley Townhome approved to start. DIs are protecct, lined concrete washout is on site. Active projects are in compliance with no trackout or discharges occuring. Approved.
ESC15-00694 Site Preparation7/6/20157/6/20157/6/2015 11:59:10 AMPPASS
Inspection requested via web by Erby Gonzales


New Barber Valley Townhome approved to start. DIs are protecct, lined concrete washout is on site. Active projects are in compliance with no trackout or discharges occuring. Approved.
ESC15-00613 Site Preparation7/6/20157/6/20157/6/2015 11:57:39 AMPPASS
Inspection requested via web by Erby Gonzales


New Barber Valley Townhome approved to start. DIs are protecct, lined concrete washout is on site. Active projects are in compliance with no trackout or discharges occuring. Approved.
ESC15-00614 Site Preparation7/6/20157/6/20157/6/2015 11:56:57 AMPPASS
Inspection requested via web by Erby Gonzales

New Barber Valley Townhome approved to start. DIs are protecct, lined concrete washout is on site. Active projects are in compliance with no trackout or discharges occuring. Approved.
ESC15-00789 Site Preparation7/6/20157/6/20157/6/2015 11:32:35 AMPPASS
Requested by Jason w/ Andersen Construction ###-####

All DIs on River, 9th and 8th and onsite have inlet protection. Building demo will start Tuesday or Wednesday and water truck is already on site for use by AAI Site surrounded by chainlink fencing.

Site asphalt areas will be kept in place until the new construction begins later this year. Will inspect again after demo complete for stabilization/clean up.
ESC14-00878 General Inspection7/6/20157/6/20157/6/2015 11:02:08 AM PASS
ESC15-00822 Site Preparation7/2/20157/6/20157/6/2015 10:51:39 AMAPASS
Bob Phone #: ###-####

Permit sign posted. Surrounding DI bags are installed. Site grubbing and initial grading to start Wednesday. ESC site map located in job trailer. Discussed rules for fugitive dust control and sweeping up trackout.

Approved.
ESC14-00941 General Inspection7/6/20157/6/20157/6/2015 10:36:34 AM PASS
ESC15-00062 DOC - Permit Finaled7/6/20157/6/20157/6/2015 8:58:28 AMPPASS