Inspections for the day of: Friday, July 6, 2018.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00440 General Inspection6/21/20187/6/20187/9/2018 3:57:29 PMAPASS
Construction not complete. No trackout or discharges. Hillsides will need stabilization/erosion controls before site final.
ESC18-00592 Complaint Inspection7/6/20187/6/20187/9/2018 11:07:32 AMPFAIL
dust complaint

dust complaint

No trackout or discharges. No loose trash or dust at time of inspection.

Violations:
-no ESC permit sign posted
- loose dirt and sediment on common drive not swept. Causing dust during vehicular traffic.

Correction request via voicemail to RP Braden
- sweep up common driveway. Have workers park on common drive or street to reduce dust.

Posted ESC sign for projects at entrance.
ESC18-00496 Complaint Inspection7/6/20187/6/20187/9/2018 11:07:14 AMPFAIL
dust complaint

No trackout or discharges. No loose trash or dust at time of inspection.

Violations:
-no ESC permit sign posted
- loose dirt and sediment on common drive not swept. Causing dust during vehicular traffic.

Correction request via voicemail to RP Braden
- sweep up common driveway. Have workers park on common drive or street to reduce dust.

Posted ESC sign for projects at entrance.
ESC18-00690 Site Preparation7/6/20187/6/20187/6/2018 4:49:46 PMPPEND
ESC16-01457 Complaint Inspection7/6/20187/6/20187/6/2018 2:48:21 PMPPEND
WIP at site to remove and stabilize former access driveway built in 2016. Temporary BMPs are installed in storm drain. Perimeter wattles installed & staged onsite..

Will refer to PW hillside for inspection. Hillside slope cuts are between 3' - 3.5' vertically, with boulders onsite.
ESC16-01472 General Inspection7/6/20187/6/20187/6/2018 2:44:07 PM PASS
ESC17-01202 Aging Inspection7/6/20187/6/20187/6/2018 2:38:54 PM PASS
Exterior and earthwork complete. No ESC issues/corrections. ESC permit finaled; BLD still open.
ESC17-01202 DOC - Permit Finaled7/6/20187/6/20187/6/2018 2:21:46 PMPPASS
ESC17-01457 General Inspection7/6/20187/6/20187/6/2018 2:10:58 PMPPASS
Townhome near completion. WIP on interior. Front sidewalk and grass median are in good condition.

No ESC corrections needed. Approved.
ESC15-00976 DOC - Permit Finaled7/6/20187/6/20187/6/2018 1:26:08 PMPPASS
ESC16-01278 General Inspection7/6/20187/6/20187/6/2018 12:41:46 PM PASS
Subdivision BMPs installed. Streets and sidewalks are clean. No trackout or discharges out of subdivision. TRash contained at site. Homes permitted individually.
ESC18-00696 Site Preparation7/6/20187/6/20187/6/2018 12:37:16 PMAPASS
rick ###-#### 11 AM

Onsite conference. North border is a grassy area, no receiving waters or storm water drains. Approved not using wattle but preserving clearing limits and grass. Will check after initial work for additional BMPs.

Approved for construction.
ESC18-00614 Site Preparation7/6/20187/6/20187/6/2018 11:16:43 AMPPASS
Permits posted on job trailer window. Posted green ESC sign at front construction sign.

Initial BMPs installed. Private storm drains that receive runoff from site have had sediment bags installed.

Follow up inspection scheduled to discuss use of open lot behind site for staging. No construction entrance to Vinnel. Could become trackout & dust issue. Notified project manager Rick w/ Knoebel.of follow. Approved to start construction.
ESC17-01293 Random Inspection7/6/20187/6/20187/6/2018 10:54:02 AMPPASS
Frame of steel structure is built. No trackout or other ESC issues observed. Approved.
ESC18-00792 Site Preparation7/5/20187/6/20187/6/2018 10:50:25 AMAPASS
James Phone #: ###-####

Permit sign and SWPPP map on site at central entrance. Onsite walk through with project manager James and assistant Zach.

Site is to be cut down below grade, construction entrance installation to be place monday morning, reminded that lining and angular rock must be used. Notified about dust control requirements. RP will have water truck onsite. Excavated dirt will be hauled off site rather than stockpiled.

Perimter silt fence sediment barrier installed. Receiving inlets have sediment protection.

Approved. for construction.
ESC16-01696 Aging Inspection7/6/20187/6/20187/6/2018 8:45:39 AM CANC
ESC16-01695 Aging Inspection7/6/20187/6/20187/6/2018 8:45:29 AM CANC
ESC16-01684 Aging Inspection7/6/20187/6/20187/6/2018 8:45:20 AM CANC
ESC17-00687 General Inspection7/6/20187/6/20187/6/2018 8:45:08 AM CANC
ESC15-01420 General Inspection7/6/20187/6/20187/6/2018 8:44:54 AM CANC
ESC17-00446 General Inspection7/6/20187/6/20187/6/2018 8:44:44 AM CANC
ESC17-00455 General Inspection7/6/20187/6/20187/6/2018 8:44:34 AM CANC
ESC17-00693 General Inspection7/6/20187/6/20187/6/2018 8:44:22 AM CANC
ESC16-00989 General Inspection7/6/20187/6/20187/6/2018 8:44:11 AM CANC
ESC17-00852 Aging Inspection7/6/20187/6/20187/6/2018 8:44:01 AM CANC
ESC17-00682 General Inspection7/6/20187/6/20187/6/2018 8:43:33 AM CANC