ESC14-00212
| General Inspection | 7/8/2015 | 7/9/2015 | 7/10/2015 2:38:37 PM | A | PEND |
|
|
|
ESC15-00654
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 4:25:16 PM | P | PEND |
|
|
|
ESC15-00266
| BMP Violation | 7/9/2015 | 7/9/2015 | 7/9/2015 4:00:42 PM | P | PART |
|
|
Significant amount of trash has been picked up and contained at site. Now trash container needs to be emptied. Alley ways have been swept but there is still a lot of debris on roadway.
Corrections: -continue pick up of wood scraps and other debris. - provide additional waste bin(s) - sweep roads
Will set up follow-up inspection for next week
|
ESC13-01159
| BMP Violation | 7/7/2015 | 7/9/2015 | 7/9/2015 3:41:36 PM | A | PEND |
|
|
Follow up on CN issued 7/7
Need street sweeping after yesterdays storm. Trash has been picked up, Cement washout pit provdied.
|
ESC13-01323
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 3:25:35 PM | | PASS |
|
|
|
ESC14-00432
| Random Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 3:21:03 PM | P | PART |
|
|
Need to sweep up loose sediment and do maintenance on DI bags after storm event.
McMaster has pulled out and terminated CGP, Hayden Homes has active CGP # IDR12EG62
|
ESC15-00042
| Aging Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 2:36:58 PM | | PASS |
|
|
Project complete, clean and stabile. Permit closed.
|
ESC15-00042
| DOC - Permit Finaled | 7/9/2015 | 7/9/2015 | 7/9/2015 2:36:01 PM | P | PASS |
|
|
|
ESC12-01066
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 2:03:59 PM | | CANC |
|
|
|
ESC14-00751
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 1:42:26 PM | | PASS |
|
|
Work is complete, hard surfaces swept and cleaned, temp BMPs removed. ESC conditions satisfied.
|
ESC14-00751
| DOC - Permit Finaled | 7/9/2015 | 7/9/2015 | 7/9/2015 1:42:11 PM | P | PASS |
|
|
|
ESC14-01011
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 1:05:29 PM | | PASS |
|
|
WIP. Contractors parking on street to avoid trackout. No hillside erosion observed. Permit is posted.
|
ESC15-00477
| BMP Violation | 7/9/2015 | 7/9/2015 | 7/9/2015 12:50:20 PM | P | FAIL |
|
|
WIP.
No site prep inspection completed. Permit sign is not visibly posted. No BMPs per site plan installed.
No discharges or significant issues but need to post permit and install wattle along disturbed areas.
|
ESC15-00177
| BMP Violation | 7/9/2015 | 7/9/2015 | 7/9/2015 12:48:16 PM | P | FAIL |
|
|
Second correction notice:
-Clean up trash, provide trash containment - clean up mud and other material in gutter in front of house - clean out DI bag that is full of mud
Corrections need to be made by tomorrow afternoon or will need to escalate
|
ESC14-00356
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 11:31:42 AM | | PASS |
|
|
Permit posted, activity remaining within limits of disturbance and preserving existing vegetation and rock features. No trackout or discharges. No activity at time of inspection.
|
ESC14-00657
| Random Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 11:19:06 AM | P | PASS |
|
|
Post precipitation event inspection found no BMP failures or other violations at River Heights #6. WIP on SFHs by Brighton Homes. Sites are currently in compliance, workers staying off muddy areas.
|
ESC14-00662
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 11:16:21 AM | | PASS |
|
|
No constrution activity on Harris Ranch 12 staging area. Area has been tracked and bermed and is partially revegetated and water did not pool at the corner of Warm Springs and Old Hickory as in the past. No sediment runoff or discharges.
|
ESC15-00556
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 11:14:58 AM | P | PASS |
|
|
No sediment runoff blowouts to streets and gutters. Hillside remain stable with no rills or areas of concern observed. Appears that rain storm was not as strong at this end of the valley. BMPs in place were adequate. No corrections.
|
ESC15-00099
| Aging Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 10:48:54 AM | | PASS |
|
|
WIP on Mill District Square SFH. Streets, sidewalks, and gutters are clean. No discharges or trackout observed. DI bags installed, trash contained.
|
ESC15-00465
| Random Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 10:46:08 AM | P | PASS |
|
|
Permit posted, perimeter BMPs installed. No trackout, clean site. No corrections needed.
|
ESC14-01025
| Site Final | 7/9/2015 | 7/9/2015 | 7/9/2015 10:33:08 AM | A | PASS |
|
|
Sidewalk and street lamp installation is complete and site has been cleaned of materials and waste from project.
Drop inlet bags to remain for future development.
ESC permit conditions satisfied. Permit closed.
|
ESC14-01083
| BMP Violation | 7/9/2015 | 7/9/2015 | 7/9/2015 10:24:51 AM | P | FAIL |
|
|
No erosion or sediment violations occuring but due to lack of trash and material enclosure some construction related waste and litter has blown into the swale in the park.
Correction request: 1. Pick up trash today and tomorrow in the swale along the length of the project. 2. Provide trash enclosure and make sure it is large enough and serviced frequently. 3. Install perimeter fencing to catch any wind blown material from blowing into swale or towards river.
Correction issued to Brighton Corp RP Danial and Brighton Homes RP Erbie. Danial will provide fencing next week, trash bins will be built for use next week.
Both will work on trash clean up today and tomorrow. Will check back
|
ESC15-00094
| General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 9:46:15 AM | P | PASS |
|
|
Inspected perimeter after > 0.25 rain event. Sediment traps on Windsong appear to have collected a decent amount of sediment and no rills or blowouts are visible. No significant trackout from vehicles. Approved - will remind RP to clean out sediment traps (sandbag wedges)
|
ESC14-01184
| Aging Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 9:30:08 AM | | PART |
|
|
Access to site has been restricted to prevent trackout from future driveway area. Perimeters of site are clean, but the street does not have gutters so there are some muddy puddles along Franklin.
Correction:
Install BMP to protect storm drain on Franklin and Locust.
|
ESC14-00713
| Random Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 9:26:41 AM | P | PASS |
|
|
No trackout or muddy discharges observed at site after significant rain storm yesterday eve. Stockpiles, loose dirt, and other materials has stayed within the curbed area of construction.
|