ESC18-01102
| General Inspection | 7/9/2019 | 7/9/2019 | 7/12/2019 11:36:15 AM | | CANC |
|
|
|
ESC18-01162
| General Inspection | 7/9/2019 | 7/9/2019 | 7/10/2019 10:33:54 AM | | PASS |
|
|
Work on interior still occuring. Exterior not yet landscaped. BMPs installed and maintained, no trackout, loose trash, or discharges
|
ESC18-01088
| Site Final | 7/5/2019 | 7/9/2019 | 7/10/2019 10:10:57 AM | P | PASS |
|
|
Home complete, landscaped, and occupied. Street, sidewalk and gutter are clean. No ESC requests, permit finaled.
|
ESC18-00847
| Site Final | 7/5/2019 | 7/9/2019 | 7/10/2019 10:08:40 AM | A | PASS |
|
|
Home complete, landscaped, and occupied. No ESC requests. Permit finaled.
|
ESC17-01132
| General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 2:32:40 PM | | PASS |
|
|
WIP on site improvements. 29th street is closed and gutter, sidewalk, and storm drains have been removed and will replaced. Existing drain at Idaho and Whitewater has protection.
No trackout, discharges, dust or other issues observed on site. Approved.
|
ESC19-00862
| BMP Violation | 7/9/2019 | 7/9/2019 | 7/9/2019 2:26:50 PM | P | FAIL |
|
|
Dirty street, evidence of some washout spillage or dump in front of project.
Verbal correction request to sweep up dirt and then rinse to the grass in front of home.
Follow up Friday AM
|
ESC18-00430
| General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 1:48:00 PM | P | PASS |
|
|
WIP. Access to gym from Anderson is now paved. No discharges, trackout or other issues observed. Close to completion.
|
ESC17-00406
| Site Final | 7/1/2019 | 7/9/2019 | 7/9/2019 1:39:42 PM | A | PEND |
|
|
notify contractor to remove DI bag
|
ESC18-00882
| Site Final | 7/5/2019 | 7/9/2019 | 7/9/2019 1:38:42 PM | A | PASS |
|
|
Permit expired. No ESC requests
|
ESC18-01531
| BMP Violation | 7/2/2019 | 7/9/2019 | 7/9/2019 1:34:47 PM | A | PASS |
|
|
If any washout dumped or not cleaned around site, issue fine and pacel hold
Washout container placed on site on top of dumped washout. Washout was utiliized. Approved.
Will still expect that the dumped material is scraped off of ground and hauled to landfill.
No discharges, trackout, or windblown trash. Minimal activity at site.
|
ESC18-01210
| General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 10:45:06 AM | | CANC |
|
|
rescheduled for site final.
|
ESC19-00402
| Conference | 7/8/2019 | 7/9/2019 | 7/9/2019 10:44:26 AM | A | DONE |
|
|
10:15
Review ESC permit requirements and proper gator guard installation.
GC to take next City RP class. Will re-install gatorguard today. Plan is to use an excavated and lined washout pit.
Backfill to begin around the 15th of July.
|
ESC19-00376
| Conference | 7/9/2019 | 7/9/2019 | 7/9/2019 10:14:30 AM | A | PEND |
|
|
call about dirt not being watered down
Notified RP to send water truck to crust site and stockpiles. Track Utility crew should also have water truck available if the activity is causing dust.
RP to follow up.
|
ESC19-00241
| Site Preparation | 7/1/2019 | 7/9/2019 | 7/9/2019 9:53:53 AM | A | PASS |
|
|
9 josh with CM
Site walk through with RP Josh and project manager Isaac with CM Company. SWPPP sign and placement for Boise ESC permit is being made. Will need to check for it next inspection. SWPPP binder and ESC plan in job trailer, NOI is active. Site will do 14 day inspections and after 0.25" 24-hr rain events.
For demolition phase, controls will include dust control with water and using existing asphalt for haul off.
After demolition a new 2" fractured rock and fabric construction entrance will be installed at the NE corner of site from Curling. This will be the exit, there will be a one way loop road where entrance is closer to Bogus Basin Road. Staging area will be within the fence on south side of school. The lined concrete washout pit will be in this location. It is not yet installed. Warner Construction will do the earthwork.
Requested that instead of drop inlet sediment protection on the high volume storm drains at Curling discharging to Crane Creek, utilize daily trackout sweeping/monitoring and gutter sediment check bags. Drop inlet filter could causing overflow and road flooding due to high volume.
Perimeter sediment control wattle is properly installed, grass will be preserved on inside of wattle as well as outside. There is more than 50' buffer to Crane Creek.
Approved for construction.
|
ESC17-00954
| General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 9:44:19 AM | P | PASS |
|
|
No trackout or discharges in subdivision. No sediment runoff from slopes onto sidewalk. Site vegetation has grown. Dry weather conditions.
Site needs to continue to do regular maintenance on gutter sediment check bags and sweep up broken bags as needed.
|
ESC18-01184
| General Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 8:05:35 AM | | CANC |
|
|
|
ESC18-00861
| Aging Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 8:04:44 AM | | CANC |
|
|
|
ESC19-00402
| General Inspection | 7/2/2019 | 7/9/2019 | 7/8/2019 12:25:04 PM | P | CANC |
|
|
|