Inspections for the day of: Thursday, July 9, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00647 General Inspection7/9/20207/9/20207/9/2020 3:56:02 PM CANC
ESC19-00948 Aging Inspection7/9/20207/9/20207/9/2020 3:55:54 PM CANC
ESC19-00371 Conference7/9/20207/9/20207/9/2020 9:49:29 AMPDONE
Update on project provided by RP Steve with CMG.

Vortex street is prepped for curb, gutters, and paving will start to begin. Concrete trucks will be directed to use the washout pan located in the upper section.

New and reconstructed ponds and stormwater features at Vortex and Ridigepoint to the site discharge point is now complete and has been hydroseeded. The plan is to install supplemental irrigation to keep grass growing through the hotter summer months.

The outlet pipe to the new reservoir will remian plugged until the sediment forebay, holding area, and surrounding slopes have properly revegetated.

No complaints or issues recently reported or observed. Dry weather conditions currently.
ESC19-00875 Aging Inspection7/9/20207/9/20207/9/2020 9:36:37 AM CANC
ESC19-00733 Aging Inspection7/9/20207/9/20207/9/2020 8:07:13 AM PASS
Development inspected on 7/7.
WIP on interiors, exterior of townhomes completed. Site is fenced in, clean, and contained, still needs landscaping. Townhomes on Kootenai are occupied.
ESC19-01035 Aging Inspection7/9/20207/9/20207/9/2020 8:06:56 AM CANC
rescheduled for site final
ESC19-01036 Aging Inspection7/9/20207/9/20207/9/2020 8:06:38 AM CANC
rescheduled for site final