Inspections for the day of: Monday, August 10, 2015.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00524 General Inspection8/10/20158/10/20158/14/2015 3:34:10 PM CANC
rescheduled 8/18
ESC14-00212 General Inspection8/10/20158/10/20158/11/2015 2:18:52 PM PEND
WIP on final landscaping. Discussed final requirements with RP Jose B. with McAlvain:

1. Complete landscaping and sweep up all loose landscaping materials and sediment from hard surfaces.
2. Sweep gutter between south culdesdac and MS4 drop inlet.
3. Remove inlet bag and dispose of capture sediment.
4. Pay Re-inspection fee that was issued in response to an illicit discharge investigation.

Site final inspection schedule for Friday and will check for these actions.
ESC15-00706 BMP Violation8/6/20158/10/20158/11/2015 10:25:08 AMAPASS
follow up inspection:

Corrections completed as requested including sweeping up street and sidewalks, install DI bag and re-posting permit sign.

Approved. Site is back in compliance. No follow up complaints received.
ESC15-00033 General Inspection8/7/20158/10/20158/10/2015 4:45:50 PMAPASS
WIP on new dealearship. Gratz Drive improvements around site are still in progress. New construction entrance installed at site has cut down trackout. Site receives runoff from surrounding drives and parking areas and it is infiltrating on site.

No corrective actions issued.
ESC13-00924 General Inspection8/10/20158/10/20158/10/2015 4:24:00 PM PASS
Only 2 remaining units are in progress at Pine Tree Village.

No corrections but developers will need to remove all drop inlet bags. Reminder issued to RP. Will check next general inspection.
ESC14-00432 General Inspection8/10/20158/10/20158/10/2015 4:19:14 PM PASS
ESC13-01323 General Inspection8/10/20158/10/20158/10/2015 4:17:13 PM PASS
WIP on west end of Cantabria complex. Many units are complete and occupied. No spills or discharges observed. No trackout. DI bags and silt fence along canal are still installed.
ESC13-01345 Site Final8/10/20158/10/20158/10/2015 4:08:32 PMPPASS
Cantabria 4-plex complete and landscaped. ESC conditions satisified. Main Cantabria ESC permit open for remaining work within complex.
ESC13-01337 Site Final8/10/20158/10/20158/10/2015 4:05:53 PMPPASS
Cantabria 4-plex complete and landscaped. ESC conditions satisified. Main Cantabria ESC permit open for remaining work within complex.
ESC14-00356 General Inspection8/10/20158/10/20158/10/2015 1:00:43 PM PASS
WIP. Frame is up. No trackout or discharges observed. Permit sign posted. Staying well within clearing limits to preserve existing vegetation.
ESC14-00657 General Inspection8/10/20158/10/20158/10/2015 12:46:59 PM CANC
access to Warm Springs Road EB from Eckert restricted currently. Inspection to be rescheduled.
ESC11-00525 Aging Inspection8/10/20158/10/20158/10/2015 12:45:51 PM PASS
Mill District Square SFHs are in progress. Subdivision BMPs are installed including DI bags and concrete washout. Trash for individual homes contained. RP available for corrections as needed. No corrective actions required at this time. West side of square is still not developed so permit will remain open.
ESC14-00662 General Inspection8/10/20158/10/20158/10/2015 12:32:42 PM PASS
No activity in staging area. Area has revegetated with weeds and wildflowers. Some debris stockpiles remain on site. No dirt leaving site, access is restricted. Noted that KR terminated related CGP permits that were opened in summer 2014. Tahoe Homes and Hunter have seperate CGPs issued.
ESC15-00518 Random Inspection8/10/20158/10/20158/10/2015 11:09:53 AMAPASS
WIP on Popeye's and Broadway Retail project. No trackout, surrounding DIs have inlet protection. No fugtive dust issues. Site perimeter well defined and contains sediment from activity.
ESC14-00442 Aging Inspection8/10/20158/10/20158/10/2015 10:46:14 AM PASS
Construction complete. Site is landscaped and stabilized. No loose dirts. Permit finaled.
ESC14-00442 DOC - Permit Finaled8/10/20158/10/20158/10/2015 10:45:39 AMPPASS
ESC15-01028 Site Preparation8/7/20158/10/20158/10/2015 10:35:08 AMAPASS
Jeff Phone #: ###-####// please call before

Homeowner RP project; familiar with permit requirements and conditions. Tuff Shed accessory building to be installed near alley. Permit sign posted. Site has inward drainage and retains runoff. No MS4 infrastructure on Bella. Approved to start.
ESC13-00702 Aging Inspection8/10/20158/10/20158/10/2015 10:18:28 AM PASS
WIP. Homeowner RP. Multiple permits still open. Some minor construction occuring. Yard is mostly stabilized. Some material and equipment storage on driveway off alley. No corrections.
ESC13-01052 Aging Inspection8/10/20158/10/20158/10/2015 9:46:15 AM PASS
BLD open, no activity since January; expired ESC permit. Earthwork phase of project is complete. No sediment or other materials leaving site. No further inspections required. Permit closed.
ESC13-01052 DOC - Permit Finaled8/10/20158/10/20158/10/2015 9:44:46 AMPPASS
ESC12-01066 General Inspection8/10/20158/10/20158/10/2015 9:32:53 AM PEND
Working on DI bag removal. Permit contact is unresponsive.
ESC14-00694 Aging Inspection8/10/20158/10/20158/10/2015 8:47:03 AM PASS