ESC13-00524
| General Inspection | 8/10/2015 | 8/10/2015 | 8/14/2015 3:34:10 PM | | CANC |
|
|
rescheduled 8/18
|
ESC14-00212
| General Inspection | 8/10/2015 | 8/10/2015 | 8/11/2015 2:18:52 PM | | PEND |
|
|
WIP on final landscaping. Discussed final requirements with RP Jose B. with McAlvain:
1. Complete landscaping and sweep up all loose landscaping materials and sediment from hard surfaces. 2. Sweep gutter between south culdesdac and MS4 drop inlet. 3. Remove inlet bag and dispose of capture sediment. 4. Pay Re-inspection fee that was issued in response to an illicit discharge investigation.
Site final inspection schedule for Friday and will check for these actions.
|
ESC15-00706
| BMP Violation | 8/6/2015 | 8/10/2015 | 8/11/2015 10:25:08 AM | A | PASS |
|
|
follow up inspection:
Corrections completed as requested including sweeping up street and sidewalks, install DI bag and re-posting permit sign.
Approved. Site is back in compliance. No follow up complaints received.
|
ESC15-00033
| General Inspection | 8/7/2015 | 8/10/2015 | 8/10/2015 4:45:50 PM | A | PASS |
|
|
WIP on new dealearship. Gratz Drive improvements around site are still in progress. New construction entrance installed at site has cut down trackout. Site receives runoff from surrounding drives and parking areas and it is infiltrating on site.
No corrective actions issued.
|
ESC13-00924
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 4:24:00 PM | | PASS |
|
|
Only 2 remaining units are in progress at Pine Tree Village.
No corrections but developers will need to remove all drop inlet bags. Reminder issued to RP. Will check next general inspection.
|
ESC14-00432
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 4:19:14 PM | | PASS |
|
|
|
ESC13-01323
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 4:17:13 PM | | PASS |
|
|
WIP on west end of Cantabria complex. Many units are complete and occupied. No spills or discharges observed. No trackout. DI bags and silt fence along canal are still installed.
|
ESC13-01345
| Site Final | 8/10/2015 | 8/10/2015 | 8/10/2015 4:08:32 PM | P | PASS |
|
|
Cantabria 4-plex complete and landscaped. ESC conditions satisified. Main Cantabria ESC permit open for remaining work within complex.
|
ESC13-01337
| Site Final | 8/10/2015 | 8/10/2015 | 8/10/2015 4:05:53 PM | P | PASS |
|
|
Cantabria 4-plex complete and landscaped. ESC conditions satisified. Main Cantabria ESC permit open for remaining work within complex.
|
ESC14-00356
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 1:00:43 PM | | PASS |
|
|
WIP. Frame is up. No trackout or discharges observed. Permit sign posted. Staying well within clearing limits to preserve existing vegetation.
|
ESC14-00657
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 12:46:59 PM | | CANC |
|
|
access to Warm Springs Road EB from Eckert restricted currently. Inspection to be rescheduled.
|
ESC11-00525
| Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 12:45:51 PM | | PASS |
|
|
Mill District Square SFHs are in progress. Subdivision BMPs are installed including DI bags and concrete washout. Trash for individual homes contained. RP available for corrections as needed. No corrective actions required at this time. West side of square is still not developed so permit will remain open.
|
ESC14-00662
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 12:32:42 PM | | PASS |
|
|
No activity in staging area. Area has revegetated with weeds and wildflowers. Some debris stockpiles remain on site. No dirt leaving site, access is restricted. Noted that KR terminated related CGP permits that were opened in summer 2014. Tahoe Homes and Hunter have seperate CGPs issued.
|
ESC15-00518
| Random Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 11:09:53 AM | A | PASS |
|
|
WIP on Popeye's and Broadway Retail project. No trackout, surrounding DIs have inlet protection. No fugtive dust issues. Site perimeter well defined and contains sediment from activity.
|
ESC14-00442
| Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 10:46:14 AM | | PASS |
|
|
Construction complete. Site is landscaped and stabilized. No loose dirts. Permit finaled.
|
ESC14-00442
| DOC - Permit Finaled | 8/10/2015 | 8/10/2015 | 8/10/2015 10:45:39 AM | P | PASS |
|
|
|
ESC15-01028
| Site Preparation | 8/7/2015 | 8/10/2015 | 8/10/2015 10:35:08 AM | A | PASS |
|
|
Jeff Phone #: ###-####// please call before
Homeowner RP project; familiar with permit requirements and conditions. Tuff Shed accessory building to be installed near alley. Permit sign posted. Site has inward drainage and retains runoff. No MS4 infrastructure on Bella. Approved to start.
|
ESC13-00702
| Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 10:18:28 AM | | PASS |
|
|
WIP. Homeowner RP. Multiple permits still open. Some minor construction occuring. Yard is mostly stabilized. Some material and equipment storage on driveway off alley. No corrections.
|
ESC13-01052
| Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 9:46:15 AM | | PASS |
|
|
BLD open, no activity since January; expired ESC permit. Earthwork phase of project is complete. No sediment or other materials leaving site. No further inspections required. Permit closed.
|
ESC13-01052
| DOC - Permit Finaled | 8/10/2015 | 8/10/2015 | 8/10/2015 9:44:46 AM | P | PASS |
|
|
|
ESC12-01066
| General Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 9:32:53 AM | | PEND |
|
|
Working on DI bag removal. Permit contact is unresponsive.
|
ESC14-00694
| Aging Inspection | 8/10/2015 | 8/10/2015 | 8/10/2015 8:47:03 AM | | PASS |
|
|
|