Inspections for the day of: Thursday, August 10, 2017.
Number of inspections: 21
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01167 General Inspection8/3/20178/7/2017 P 
ESC17-00648 General Inspection8/7/20178/10/20178/18/2017 2:12:58 PMPPEND
follow up
ESC17-00726 General Inspection8/10/20178/10/20178/18/2017 2:11:53 PMPCANC
ESC15-00556 General Inspection8/7/20178/10/20178/18/2017 9:31:02 AMPPEND
street sweeping?
ESC17-00102 Complaint Inspection8/10/20178/10/20178/14/2017 2:22:35 PMPPEND
No construction activity at site. No windblown dust observed.

Site needs to begin implementing temporary or permanent stabilization on disturbed area.
ESC16-01421 General Inspection8/10/20178/10/20178/14/2017 2:20:56 PM CANC
ESC16-00879 General Inspection8/10/20178/10/20178/14/2017 12:07:57 PM CANC
ESC16-01395 General Inspection8/10/20178/10/20178/14/2017 11:46:59 AM CANC
ESC16-01512 General Inspection8/8/20178/10/20178/14/2017 11:46:02 AMPCANC
ESC16-01163 Aging Inspection8/10/20178/10/20178/14/2017 11:45:22 AM CANC
ESC16-01281 Aging Inspection8/10/20178/10/20178/14/2017 11:45:08 AM CANC
ESC15-00094 General Inspection8/10/20178/10/20178/14/2017 11:44:52 AM CANC
ESC16-01410 General Inspection8/10/20178/10/20178/14/2017 11:35:17 AM CANC
ESC16-01469 Aging Inspection8/10/20178/10/20178/14/2017 11:34:45 AM CANC
ESC16-01397 General Inspection8/10/20178/10/20178/14/2017 11:33:43 AM CANC
ESC39-00007 Aging Inspection8/10/20178/10/20178/14/2017 10:54:56 AM CANC
ESC16-00849 General Inspection8/10/20178/10/20178/14/2017 10:54:21 AM CANC
ESC16-01432 General Inspection8/10/20178/10/20178/14/2017 10:41:11 AM CANC
ESC16-01434 General Inspection8/10/20178/10/20178/14/2017 10:25:53 AM CANC
ESC16-01162 Aging Inspection8/10/20178/10/20178/11/2017 10:51:52 AM CANC
ESC17-00302 Site Preparation8/9/20178/10/20178/10/2017 10:19:52 AMAPASS
9:30 AM site conference

RP/GC Dan onsite with approved ESC plans. Crew in progress of installing perimeter wattle and cutting the driveway access so that RPC can install a boulder wall. Wall will have drainage behind it to divert run-on from the disturbed area. RP is planning to preserve as much vegetation as possible during wall installation. Permit sign to be posted on the temporary power pole.

Approved for construction. Follow inspection scheduled