ESC19-00882
| Site Final | 8/10/2020 | 8/10/2020 | 8/12/2020 1:46:17 PM | P | PASS |
|
|
|
ESC19-00371
| General Inspection | 8/7/2020 | 8/10/2020 | 8/11/2020 8:26:57 AM | P | PASS |
|
|
Small landscaping crew active on upper area and entrance at Trent Point. Water line crew for separate project is also still active in the area.
Dry conditions, no trackout or discharges observed. New stormwater system is complete. Needs further inspection to assess revegetation status..
No correction requests at this time.
|
ESC20-00639
| Site Preparation | 8/7/2020 | 8/10/2020 | 8/10/2020 5:34:37 PM | P | PASS |
|
|
WIP on hauliing out excess rock and material to approved location. Will install BMPs after initial excavation.No trackout or fugtive dust observed.
Posted ESC permit sign.
|
ESC17-00791
| Site Final | 8/7/2020 | 8/10/2020 | 8/10/2020 5:23:55 PM | P | PASS |
|
|
No temp BMP removal requests. Construciton complete, disturbed area revegetated. No new home construction or activity at site. ESC permit finaled.
|
ESC20-00591
| General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 5:21:00 PM | P | PASS |
|
|
WIP. NO trackout or loose dirt around perimeter. Trash contained. Water line or utility cuty on back slope behind home, will need stabilization and/or perimeter sediment control
|
ESC19-01076
| Site Final | 8/10/2020 | 8/10/2020 | 8/10/2020 5:12:04 PM | P | PASS |
|
|
Subdivsion work complete. Prepped for new townhomes. BMPs will be maintained by new homebuilders.
|
ESC17-00791
| Site Final | 8/7/2020 | 8/10/2020 | 8/10/2020 5:11:14 PM | P | CANC |
|
|
|
ESC19-01386
| General Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 5:11:04 PM | P | PASS |
|
|
Home framed, no landspaing yet. No trackout, dust, trash, or discharge issues observed.
|
ESC20-00611
| BMP Violation | 8/10/2020 | 8/10/2020 | 8/10/2020 5:02:51 PM | P | FAIL |
|
|
No site prep requested. Very dusty at time of inspecton due to equipment movement.
Water truck was in fact on site. Rex with Knife River is on job. Permit sign posted, construction entrance installed.
Will follow up this week
|
ESC20-01200
| General Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 5:01:08 PM | P | PASS |
|
|
WIP. Water truck actively controlling dust at time of inspection. ESC permit sign and SwPPP info located off Warm Spring Bypass @ future Barnwood. Construction entrance installed.
|
ESC19-01280
| General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 5:00:05 PM | | PASS |
|
|
|
ESC19-00324
| General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 4:40:39 PM | | CANC |
|
|
|
ESC19-00324
| General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 4:39:44 PM | P | PASS |
|
|
Subdivision infrastructue and grading complete. Stabilization/revegeation of common areas occuring. Dry, hot, condition.
BMPs installed include inlet protection, perimeter silt fence, and slope erosion controls along La Cuesta. No wind blown dust observed.
No correcitons requested.
|
ESC20-00932
| General Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 4:38:08 PM | P | PASS |
|
|
WIP. No ESC issues. Lined washout pit located on corner of Los Carneros and Hakkasan.
Request to install wattle around the east side of staging area on bottom lot.
|
ESC19-01076
| General Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 4:36:19 PM | P | PASS |
|
|
|
ESC19-00882
| General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 8:17:59 AM | | CANC |
|
|
|
ESC18-00369
| Aging Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 8:11:26 AM | | DEFR |
|
|
can be finaled by BLD inspector
|