Inspections for the day of: Friday, August 11, 2017.
Number of inspections: 21
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01167 General Inspection8/3/20178/7/2017 P 
ESC16-00324 Site Final8/9/20178/11/20178/16/2017 10:04:25 AMAPASS
Project complete, open areas are landscaped & stabilized. No loose dirt or building materials. No temporary BMPs still installed. Permit finaled
ESC16-01369 Aging Inspection8/11/20178/11/20178/16/2017 9:02:30 AM CANC
ESC15-01613 Site Final8/7/20178/11/20178/14/2017 2:24:00 PMAPASS
All exterior work complete. No temporary BMPs or loose dirt/materials around site. No ESC corrections needed, permit conditions satisfied.
ESC16-01486 Aging Inspection8/11/20178/11/20178/14/2017 12:17:18 PM CANC
ESC16-00963 General Inspection8/11/20178/11/20178/14/2017 12:07:13 PM CANC
ESC15-00944 General Inspection8/11/20178/11/20178/14/2017 12:06:33 PM CANC
ESC16-01377 Aging Inspection8/11/20178/11/20178/14/2017 11:47:14 AM CANC
ESC16-00865 General Inspection8/11/20178/11/20178/14/2017 11:46:46 AM CANC
ESC16-00329 General Inspection8/11/20178/11/20178/14/2017 11:46:15 AM CANC
ESC16-00225 General Inspection8/11/20178/11/20178/14/2017 11:38:48 AM CANC
ESC16-01227 Aging Inspection8/11/20178/11/20178/14/2017 11:34:20 AM CANC
ESC16-00841 General Inspection8/11/20178/11/20178/14/2017 11:32:04 AM CANC
ESC16-01394 Aging Inspection8/11/20178/11/20178/14/2017 11:31:24 AM CANC
ESC17-00470 Complaint Inspection8/11/20178/11/20178/14/2017 11:30:48 AMAFAIL
Corrections needed:

- have water truck operate in area along the south property line to prevent dust issues for the residential subdivision there.
- sweep road and gutter on Shamrock
- install sediment protection on storm drain on Shamrock
ESC15-01532 General Inspection8/11/20178/11/20178/14/2017 11:22:53 AM PEND
ESC17-00954 Site Preparation8/9/20178/11/20178/14/2017 10:45:30 AMAPASS
Zeke Phone #: ###-####

Preconstruction site meeting completed. SWPPP on site, permit posted, construction entrance installed. Work will begin on rock retaining walls prior to grading operations. Reviewed phasing, leaving a vegetative buffer and requested that once grading is stared, onsite retention/sediment basins should be provided.

ESC15-01184 General Inspection8/11/20178/11/20178/14/2017 10:30:04 AM PASS
ESC16-00603 General Inspection8/11/20178/11/20178/11/2017 11:37:33 AM CANC
ESC17-00971 General Inspection8/11/20178/11/20178/11/2017 10:28:58 AMPPASS
Site has been graded. Permit sign posted, construction entrance installed and perimeter silt fence in certain areas to protect neighboring properties. No trackout, discharges, or wind blown dust observed. Follow up scheduled to check on stabilization and stockpile protection.
ESC16-01426 Site Final8/11/20178/11/20178/11/2017 10:13:58 AMPPASS
Demo complete. New residential subdivision now in progress and covered under ESC17-00971