ESC19-00601
| BMP Violation | 8/12/2019 | 8/12/2019 | 8/15/2019 4:59:27 PM | P | PART |
|
|
follow up on concrete washout dump.
Concrete washout dumped on Corralero has been cleaned up as requested.
Perimter BMPs installed, no trackout, site is clean.
Correction needed: - install stabilized construction entrance
|
ESC16-01395
| Site Final | 8/12/2019 | 8/12/2019 | 8/15/2019 4:57:32 PM | P | NR |
|
|
Work still in progress.
|
ESC17-00455
| Site Final | 8/12/2019 | 8/12/2019 | 8/15/2019 4:07:19 PM | P | PASS |
|
|
Earth work complete. No disturbed area. ESC permit finaled.
|
ESC18-00446
| General Inspection | 8/9/2019 | 8/12/2019 | 8/13/2019 3:47:06 PM | P | PASS |
|
|
Interior work in progress. Alley work area is clean, no spills or loose materials.
|
ESC19-00574
| Conference | 8/12/2019 | 8/12/2019 | 8/13/2019 3:12:41 PM | P | CANC |
|
|
|
ESC18-01191
| Site Final | 8/12/2019 | 8/12/2019 | 8/13/2019 11:47:56 AM | P | NR |
|
|
Need to pull temporary sediment bag installed in storm drain. No other request, home is landscaped and perimeter clean.
Text notification to RP-GC
|
ESC18-00792
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 4:50:44 PM | P | PASS |
|
|
Street was cleaned up as requested. Will check back for rest of site final.
|
ESC18-01737
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 4:40:53 PM | P | PASS |
|
|
|
ESC18-00983
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 4:16:02 PM | P | PART |
|
|
No discharges, trackout, or fugitive dust. Revegetated slopes have irrigation installed. Roads and gutters are installed.
Corrections need at NW corner of upper level:
- fix break in berm above the start of a large - install check dam in drainage channel, direct channels outflow away from the slope
|
ESC18-00164
| Complaint Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 3:51:33 PM | P | FAIL |
|
|
dust complaints received
- rough grading/grubbing in progress, no dust truck on site at time of inspection. Foreman states dust truck is on a circulating route and was previously at site. Dust plumes are leaving site and the light wind conditions blowing it into the neighborhood below. - no permit sign, no construction entrance, no site preparation inspection requested.
Project manager Jerry notified to halt work until dust control onsite, which he did.
Corrections: - have full time dust control water truck during initial grading/grubbing and dust generating activities. - Install construction entrance, construction entrance and schedule site preparation inspection with ESC division.
|
ESC19-00567
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 12:22:21 PM | P | PASS |
|
|
Parking lot installed, other trade permits still open. Will keep open for follow up. No issues observed.
|
ESC19-00576
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 10:37:50 AM | P | PEND |
|
|
Notified RP Joel (wrong RP listed) to make sure foundation crew is aware of the concrete washout location.
Request to keep close eye on trash, prohibit any construction access/activity outside of the subdivsion fence.
Permits posted, washout and storm sediment protection installed.
|
ESC17-01360
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 10:35:47 AM | | FAIL |
|
|
Correction needed:
Maintenance and loose material clean up is needed around the concrete washout pan.
RP notified.
|
ESC17-00455
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 8:21:59 AM | | CANC |
|
|
|
ESC16-01395
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 8:21:31 AM | | CANC |
|
|
|
ESC16-00225
| General Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 8:18:57 AM | | CANC |
|
|
|