Inspections for the day of: Monday, August 13, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00452 General Inspection8/13/20188/13/20188/14/2018 12:21:13 PM PASS
ESC17-00779 Aging Inspection8/13/20188/13/20188/14/2018 11:21:14 AM CANC
ESC17-00121 General Inspection8/13/20188/13/20188/14/2018 11:01:04 AM PASS
Garage frame complete, driveway paved. Some minor site work and exterior siding remains to be completed. No ESC issues
ESC18-00866 General Inspection8/13/20188/13/20188/13/2018 4:11:57 PMPPASS
Corrections needed:

- sweep up street, gutter and sidewalk in front of site
- clean up concrete slurry (dried) in the gutter
- install sediment protection on receiving storm drain just west of site
ESC18-00863 General Inspection8/13/20188/13/20188/13/2018 4:11:47 PMPFAIL
Corrections needed:

- sweep up street, gutter and sidewalk in front of site
- clean up concrete slurry (dried) in the gutter
- install sediment protection on receiving storm drain just west of site
ESC16-00935 BMP Violation8/13/20188/13/20188/13/2018 2:49:06 PMPFAIL
illegal stockpile on top of a storm drain reported Thursday Aug 9th has still not be cleaned or relocated as requested to RP Cleve via text message.

No clean up of road mix material dumped around storm drains. DI bags full and unmaintained. Spill absorbent/kitty litter left in gutter.

Lined swale is full of dirt, weeds and some trash. Grass on slopes is not watered and probably dying. May require additional revegetation this fall.
ESC17-00072 Aging Inspection8/13/20188/13/20188/13/2018 12:51:02 PM PASS
BLD expired. No ESC requests
ESC17-00072 DOC - Permit Finaled8/13/20188/13/20188/13/2018 12:50:44 PMPPASS
ESC18-00678 General Inspection8/13/20188/13/20188/13/2018 12:42:18 PMPPASS
follow up

No actvity at time of inspection. No dust occuring. Road was swept up in front of project. No further complaints received. Approved.
ESC17-01754 Tracking Control8/13/20188/13/20188/13/2018 12:17:10 PMPFAIL
Significant amount of dust and trackout on Hudson.

Verbal correction request to RP JC w/ Petra to have more rock added to construction entrance and clean up road and gutter

RP on duty, dust control water truck on site and in use (the reason for some of the trackout), lined concrete washout onsite, permit signs posted.

Compliance follow-up scheduled
ESC16-01205 General Inspection8/13/20188/13/20188/13/2018 11:49:39 AM PASS
ESC39-00001 Aging Inspection8/13/20188/13/20188/13/2018 8:12:38 AM CANC