Inspections for the day of: Wednesday, August 14, 2019.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01433 General Inspection8/13/20198/14/20198/19/2019 4:54:22 PMPFAIL
Site used neigboring site's concrete washout and filled it/spilled material around washout.

Site will work with adjacent site to clean up and provide new washout.

No trackout or offiste discharges/sediment runoff.
ESC18-01455 General Inspection8/13/20198/14/20198/19/2019 4:53:05 PMPPART
Needs maintenance on construction entrance.
ESC18-01244 General Inspection8/13/20198/14/20198/19/2019 4:52:29 PMAPASS
Site is not yet landscaped. Will need to closely monitor and request temporary or permanent stabilization in September.
ESC17-00954 General Inspection8/13/20198/14/20198/19/2019 4:51:41 PMPPASS
Vegetation growing well. No wind blown trash around subdivsion, street is clean. No spills or discharges observed. Dry, hot conditions, no dust observed. Multiples SFHs in progress, permitted seperately.

Routine maintenance and cleaning is needed on the rock check bags at entrance to subdivsion.
ESC17-00190 General Inspection8/14/20198/14/20198/15/2019 4:53:37 PM PASS
No activity. No discharge or sediment runoff. Will need to assess slopes for additional revegetation this fall when Hackberry Ridge is being seeding. No corrections requested at this time.
ESC18-00540 General Inspection8/14/20198/14/20198/15/2019 4:51:29 PM PASS
ESC16-00406 General Inspection8/14/20198/14/20198/15/2019 4:51:14 PM FAIL
Corrections needed:

-Concrete washout area needs clean up and additional capacity.
- Post subdivsion ESC sign and SWPPP sign at job trailer
- Clean out full sediment bags within phase 1
ESC18-01057 General Inspection8/14/20198/14/20198/15/2019 4:17:35 PM PASS
ESC18-01082 General Inspection8/14/20198/14/20198/15/2019 8:17:17 AM PASS
WIP on back patio. No loose materials leaving site. Trash contained. Will need to install washout prior to the next pour for the patio decks.