ESC14-00719
| General Inspection | 8/15/2016 | 8/15/2016 | 8/16/2016 3:01:00 PM | | PASS |
|
|
Vertical construction in progress. Some trackout from site to Myrtle occurs but is swept periodically. DI bags installed. No discharges or major trackout occuring. No complaints received
|
ESC16-00490
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 4:48:33 PM | P | PASS |
|
|
WIP on cell tower. No trackout. Permit sign posted, stabilzed entrance provided.
|
ESC15-00729
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 4:19:08 PM | | PASS |
|
|
|
ESC15-01224
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 3:59:40 PM | | PASS |
|
|
Materials onsite and concrete washout are contained. No trackout, fugitive dust, or discharges occring. Site is in compliance.
|
ESC16-00390
| Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 3:58:28 PM | P | NR |
|
|
Need to remove temp BMPs and concrete waste in the alley.
|
ESC16-00244
| Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 3:50:58 PM | P | PASS |
|
|
Construction complete and DI bags removed on corner of Wright and Cadet. Yard is landscaped and stabilized.
|
ESC16-00384
| Complaint Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 3:40:27 PM | P | FAIL |
|
|
fugitive dust complaint
Water truck on site but primarily used for compaction and dust control at active excavation areas.
Dust problem is the unstabilized concrete washout entrance and uncontrolled employee parking on site and driving offsite in multiple locations.
Verbal correction request to onsite foreman, awaiting call back from RP Jim.
1. Increase use of water truck on the access routes. Trackout can be swept once dry and DIs have sediment bags installed. Dust control should be primary concern.
2. Install rock over the entrane to lined concrete washout pit at SE corner of site. Extreme dust area by wind and vehicle causes.
If no improvement tomorrow before noon, will issue Re-inspection and 2nd CN with next step being SWO
|
ESC16-00600
| Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 2:01:44 PM | P | PASS |
|
|
Tower installed, surrounding area is in pre-existing condition of dirt/gravel parking lot. No construction waste or materials on site. No furher site work required. ESC permit condtions satisfied
|
ESC15-00720
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:42:31 PM | | PASS |
|
|
Site landscaping and parking lot work is occuring. No sediment or other materials on site. DI bag still installed west of site on Ardene and Hadley. Will need removal upon project completion. No corrections requested.
|
ESC16-00233
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:36:36 PM | P | PASS |
|
|
Exterior of commercial building is complete and has been recentely landscaped. Only the shell is complete, inside work ongoing. No trackout, uncontained debris, or other violations.
Will need to give parking lot/staging area a final sweeping before removal of DI bag on the private onsite storm drain.
|
ESC15-01055
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:36:23 PM | P | PASS |
|
|
Exterior of commercial building is complete and has been recentely landscaped. Only the shell is complete, inside work ongoing. No trackout, uncontained debris, or other violations.
Will need to give parking lot/staging area a final sweeping before removal of DI bag on the private onsite storm drain.
|
ESC16-00427
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:09:14 PM | P | PASS |
|
|
Bridge span is now installed but not yet open for use. No disturbed areas without buffer next to creek. New swale off Peconic has had perimteter sediment control installed.
Landscaping/stabilization around both sides of bride access is not complete. Request to John to make sure crew picks up any loose litter in area and to provide date of SF removal.
|
ESC16-00156
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:05:48 PM | P | PASS |
|
|
Common areas around Tioga culdesac have been landscaped with sod and trees. All DIs in new phase have inlet protection.
Silt fence is still installed along 8 mile creek between both phases of Peppermill from Hollandale to Peconic. Silt fence should be removed once the southeast portion of path shoulder are stabilized/landscaped. No immediate corrections, will continue to monitor. No SFH construction in phase 2 yet.
|
ESC16-00879
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 1:02:01 PM | P | PASS |
|
|
No activity at time of inspection. Only small portion of area has been excavated. Rough grading and grubbing has not occured yet.
Will need to install rock construction entrance once equipment arrives on site. No trackout, dust, or other issues at time of inspection.
|
ESC16-00168
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 12:34:53 PM | P | PASS |
|
|
Inspection or re-located wetland area. Wetlnad vegetation has started to grow within the designated mitigation area. Temporary irrigation water diversion lined channel has been removed. Water is flowing into the area and wate control gates are complete. Construction entrance and SWPPP info located on Victory.
|
ESC15-01119
| Random Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 12:01:12 PM | P | PASS |
|
|
|
ESC15-01150
| Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 11:57:33 AM | | PASS |
|
|
WIP on frame. No trackout, trash and materials contained on site. Approved.
|
ESC15-01210
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 11:01:01 AM | A | PASS |
|
|
No recent activity or construction. All subdivison development work is complete and BMPs are installed and in good condition. BMPs include DI bags, wattles, and a temporary tacifier application.
SFH should begin this Fall, RP with Local Construct stated that in the fall, all lots and open areas not under construction will be hydroseeded in Oct/Nov. Will keep this permit open until this has occured. No corrections, no issues observed.
Multiple lots sold to SFH home builders.
|
ESC15-01565
| Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 10:36:33 AM | A | PASS |
|
|
SFH complete and landscaped. No temp BMP removal is required due to active construction in Somerset Village. Approved for final
|
ESC15-01256
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 10:31:37 AM | | PASS |
|
|
Home complete but not yet landscaped/stabilized. Active projects exist on both sides of home. No violations, no corrections requested.
|
ESC13-00193
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 10:28:42 AM | | PASS |
|
|
One completed home on Sand Dune, no active SFHs at this time.
Sediment control BMPs (wattles, DI filter bags) are installed and in decent condition. No trackout, dust issues). No erosion rills or gullies observed around perimeter and along steep bank on Crestline.
Some debris has been dumped on open lots and should be removed by Jayo .
|
ESC15-01563
| Site Final | 8/15/2016 | 8/15/2016 | 8/15/2016 10:25:12 AM | A | PASS |
|
|
Home complete, landscaped, and culdesace has been cleaned. Somerset Village temp BMPs to remain and inspected under ESC13-00193, no violations. No corrections needed.
|
ESC15-00862
| Random Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 10:22:11 AM | P | PART |
|
|
Checked backyard slope for sediment and erosion controls.
The hillside has been properly horizontally tracked. One section of the bottom of the slope is a 3 ft rock retaining wall. On top of the wall and areas on the sides have a sediment control wattle staked in. Some dirt has started to accumulate on top of the wattle. No hydroseed, hydrolmulch or tacifier has been applied.
Need to provide stabilization of slope and fix areas of wattle that have had sand cross over it. Check progress next inspection... landscaping and stabilization is schedule to start soon
|
ESC15-01040
| Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 9:22:12 AM | | PASS |
|
|
|
ESC15-01287
| General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 8:58:52 AM | | PASS |
|
|
Home near completion, not yet landscaped.
DI bag installed on receiving MS4. Sidewalk and gutter will need thorough sweeping. Reminded RP to be sure and take out DI bags since there are no active projects remaining on Strata Via after this SFH is complete
|