ESC14-01083
| General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 4:15:02 PM | | PASS |
|
|
BMPs installed and maintained. No violations observed. WIP on townhomes.
|
ESC16-00384
| BMP Violation | 8/16/2016 | 8/16/2016 | 8/16/2016 2:49:09 PM | P | PART |
|
|
Road mix delivered to site and spread so that trucks can access washout from within site.
No dust blowing across lines but no water truck and road mix was not fully supplied by time of compliance. Re-inspection fee issued.
|
ESC15-01391
| General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 1:45:14 PM | | PASS |
|
|
|
ESC15-00556
| General Inspection | 8/11/2016 | 8/16/2016 | 8/16/2016 1:11:29 PM | A | PART |
|
|
Crews working on cutting road areas.
Correction needed:
No trackout but need to have water truck with its own designated driver. Verbal notice given to RP.
|
ESC15-01397
| General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 12:27:25 PM | | PASS |
|
|
WIP. Most work occuring on interior. Staging area is clean. No trackout or spills observed. No corrections.
|
ESC15-01404
| Aging Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 11:20:09 AM | | PASS |
|
|
Garage structure complete and disturbed area stabilzied. No temp BMP removal needed. All permit finaled.
|
ESC15-01404
| DOC - Permit Finaled | 8/16/2016 | 8/16/2016 | 8/16/2016 11:19:27 AM | P | PASS |
|
|
|
ESC16-00384
| BMP Violation | 8/15/2016 | 8/16/2016 | 8/16/2016 11:08:19 AM | A | PEND |
|
|
RP called to inform two loads of road mix are being brought to site to stabilize the extreme dust area at the washout pit entrance.
Adminitstrative change to have all employees park on street as much as possible has been requested to sub-contractor foremen.
Watering has increased and site supervisor is monitoring dust levels regularly.
Will check at 2 PM. Extended compliance.
|
ESC15-00221
| General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 10:01:16 AM | | PASS |
|
|
|
ESC13-01159
| General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 9:25:16 AM | | PASS |
|
|
No subdivison activity. SFHs by CBH in progress. No trackout from sites, designated washout has been in use (no foundation work at this time), and storm drains have sediment protection. Silt fence installed along 8 Mile Creek. Phase 2 has seperate permit ESC16-00156
|