ESC16-00406
| Conference | 8/15/2019 | 8/16/2019 | 8/22/2019 7:37:34 AM | A | PEND |
|
|
notify RP of corrections needed
|
ESC18-01237
| General Inspection | 8/16/2019 | 8/16/2019 | 8/19/2019 4:49:26 PM | | PASS |
|
|
Home near completion. Grass where concrete washout was dumped and spilled is brown and not growing well. No discharges or material leaving site. Will follow up for site final next week.
|
ESC19-00114
| BMP Violation | 8/16/2019 | 8/16/2019 | 8/16/2019 4:21:49 PM | P | FAIL |
|
|
Dumped washout and/or wallboard joint material rinsed onto ground and front of slope. White stain in gutter. Loose dirt and debris in gutter, no sediment barrier installed at bottom of site.
|
ESC18-01235
| General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 4:15:36 PM | | PASS |
|
|
|
ESC17-01473
| Site Final | 8/15/2019 | 8/16/2019 | 8/16/2019 3:24:34 PM | A | NR |
|
|
No temporary BMPs left around the perimeter, wattles along the water feature have been removed. CM company still has a staging and work area at the southeast corner of the zoo, will keep open till all work is complete
|
ESC19-00365
| Site Final | 8/12/2019 | 8/16/2019 | 8/16/2019 2:58:04 PM | A | PASS |
|
|
Temporary BMPs removed, work and staging areas cleaned up. Dog Island open for human and canine recreation. No ESC corrections. Boise Parks will control disturbed area in the staging area.
|
ESC17-00748
| General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 12:51:39 PM | P | PASS |
|
|
WIP on interior and exterior site clean up.
Will require street sweeping on Bird before getting ESC site final approval
|
ESC18-01460
| General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 12:50:53 PM | | PASS |
|
|
No trackout. Site below grade of Orchard, surrounding by airport pavement
|
ESC19-00428
| Complaint Inspection | 8/15/2019 | 8/16/2019 | 8/16/2019 11:46:34 AM | A | PASS |
|
|
Dumped concrete + washout reported has been cleaned up as requested. New concrete washout pit with lining has been installed on SW corner of site. Water truck did a full site soaking last night to help keep down dust. No dust at time of inspection, surface is damp and compacted at the time.
Construction entrance installed, minor trackout with request to sweep sidewalk. Permit sign posted, trash contained.
Dirt in gutter is mostly from Petra and Humane Society, so that will be getting a final sweep & clean up.
|
ESC19-00703
| Site Final | 8/16/2019 | 8/16/2019 | 8/16/2019 11:43:49 AM | P | PASS |
|
|
Signs installed. Landscaping around signs complete. Main project still in progress on interior and demobilization of exterior, see ESC17-00748
|
ESC18-00792
| Site Final | 8/16/2019 | 8/16/2019 | 8/16/2019 11:06:05 AM | P | PASS |
|
|
Site walk with James from MJ Harris.
All disturbed areas are landscaped/stabilized. Denton Street had oil spills and dirt cleaned as requested. Facility management will be redoing the swale along Curtis to rake back bark chips from storm drain and install drain rock. At that time sediment bags will be removed.
Sediment bags on Curtis are for CSC to return to work.
Scope of this permit and ESC requests are complete. ESC permit finaled.
|
ESC18-00756
| Aging Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 8:24:26 AM | | CANC |
|
|
|
ESC18-00756
| DOC - Permit Finaled | 8/16/2019 | 8/16/2019 | 8/16/2019 8:24:21 AM | P | PASS |
|
|
|
ESC18-00109
| General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 8:24:02 AM | | CANC |
|
|
|