Inspections for the day of: Thursday, August 17, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01138 General Inspection8/17/20178/17/20178/22/2017 3:37:35 PM CANC
ESC16-01720 General Inspection8/17/20178/17/20178/22/2017 2:17:51 PMPFAIL
Verbal correction request issued 8/16 to clean up sidewalk on Main Street (broken sandbags) and to conduct maintenance on the storm drain inlet there.

ESC13-00524 General Inspection8/17/20178/17/20178/18/2017 2:27:27 PM CANC
ESC16-00989 General Inspection8/17/20178/17/20178/18/2017 2:27:09 PM CANC
ESC16-01608 General Inspection8/17/20178/17/20178/18/2017 2:15:45 PM CANC
ESC13-01279 General Inspection8/17/20178/17/20178/18/2017 2:15:37 PM CANC
ESC16-01428 Aging Inspection8/17/20178/17/20178/18/2017 2:14:04 PM CANC
ESC14-00719 General Inspection8/17/20178/17/20178/18/2017 2:11:24 PM PASS
ESC16-00936 General Inspection8/17/20178/17/20178/18/2017 2:11:12 PM CANC
ESC16-01607 General Inspection8/17/20178/17/20178/18/2017 10:24:41 AM PEND
ESC16-00916 Aging Inspection8/17/20178/17/20178/18/2017 10:22:45 AM CANC
ESC17-00971 General Inspection8/11/20178/17/20178/17/2017 1:33:11 PMPPEND
ESC16-01287 Aging Inspection8/17/20178/17/20178/17/2017 12:59:22 PM CANC
ESC16-01508 Aging Inspection8/17/20178/17/20178/17/2017 12:54:34 PM CANC
ESC17-01033 Random Inspection8/17/20178/17/20178/17/2017 12:53:33 PMPPASS
Residential demolition and lot clearing in progress. Water truck onsite for fugitive dust control. NO trackout
ESC16-01100 DOC - Permit Finaled8/17/20178/17/20178/17/2017 11:38:47 AMPPASS
ESC16-00953 General Inspection8/17/20178/17/20178/17/2017 11:23:06 AM CANC
ESC16-00915 Aging Inspection8/17/20178/17/20178/17/2017 11:22:39 AM CANC
ESC17-00637 Site Preparation8/16/20178/17/20178/17/2017 11:13:17 AMAPEND
discuss dewatering plan and ESC plan @ 9

Plan is to dewater to a 18,000 gallon frack tank that will then gravity discharge into the existing storm drain vault in Albertson's parking lot. The center's stormwater discharges to the DD3 pond south of the center.

Treatment through frac tank should be adequate, but will verify quality with turbidity test samples at frac tank outlet.
ESC16-01561 Site Final8/15/20178/17/20178/17/2017 9:27:45 AMPCANC
intended to be a PW drainage inspection