Inspections for the day of: Friday, August 17, 2018.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01105 Site Final8/16/20188/17/20188/17/2018 4:34:19 PMAPASS
Project complete. No ESC requests. Permit finaled.
ESC18-01063 General Inspection8/17/20188/17/20188/17/2018 3:46:37 PMPPASS
No trackout of fugtive dust observed or reported during project. BMPs installed. Podium is now uncovered from underneath the dirt and sod.
ESC17-00487 General Inspection8/17/20188/17/20188/17/2018 3:45:50 PMPPASS
WIP on interior. Exterior stabilized, landscaped and cleaned.
ESC17-01289 General Inspection8/17/20188/17/20188/17/2018 1:30:54 PM PASS
ESC17-00078 General Inspection8/17/20188/17/20188/17/2018 1:17:35 PM PASS
ESC16-00225 General Inspection8/17/20188/17/20188/17/2018 1:17:17 PM PART
Need to begin clean up and stabilization or secure perimeter for sediment control on the staging area at east end of Trent Point.

No trackout, discharges, or dust occuring. Need to begin to prepare for wet weather in September.
ESC16-00329 Site Final8/16/20188/17/20188/17/2018 12:58:58 PMAPASS
Addition complete. No sediment leaving site. Homeowner finishing landscaping. ESC permit finaled.
ESC18-00892 Random Inspection8/17/20188/17/20188/17/2018 12:07:53 PMPPASS
ESC17-01163 Aging Inspection8/17/20188/17/20188/17/2018 12:00:42 PM PASS
Home complete and landscaped. No ESC requests, permit finaled.
ESC17-01163 DOC - Permit Finaled8/17/20188/17/20188/17/2018 12:00:09 PMPPASS
ESC17-01414 General Inspection8/17/20188/17/20188/17/2018 11:59:16 AM PASS
Phase 6 of DHETH is just now starting foundation work. Silt fence perimeter installed on south side of site. No corrections needed at this time.
ESC17-01413 General Inspection8/17/20188/17/20188/17/2018 11:57:20 AM PASS
DHET phase development complete. New townhomes build and ESC managed by Blackrock Homes. No further ESC inspetions on this permit.
ESC17-01413 DOC - Permit Finaled8/17/20188/17/20188/17/2018 11:56:27 AMPPASS
ESC17-01053 Aging Inspection8/17/20188/17/20188/17/2018 11:54:20 AM PASS
Project complete. Harris Crossing temp BMPs to be removed under main site permit.
ESC17-01053 DOC - Permit Finaled8/17/20188/17/20188/17/2018 11:53:26 AMPPASS
ESC17-01408 General Inspection8/17/20188/17/20188/17/2018 11:39:31 AM PASS
ESC18-00893 Complaint Inspection8/17/20188/17/20188/17/2018 11:21:08 AMAFAIL
No activity at time of inspection. Crew has been installing stormwater system this week

Met project manager Andy with Core Building. Issued warning about Site Preparation Inspection requirement. Next time Core will get fined if Site Prep not completed.

Corrections requested:
- repost ESC permit signs, 1 on south entrance and one on the Greenbelt.
- water truck is required for dust control. Must be onsite.
- sweep gutter at end of work day today.
- construction entrance should be installed after stormwater bed is covered/stabilized.



Receiving storm drain has existing DI bag installed, it is 1/4 full and cemented into the curb. Request to prevent trackout and dirt on roadway by daily sweeping. Recommended writing that into subcontractor contracts.

Follow up inspection scheduled 8/20
ESC04-00730 DOC - Permit Finaled8/17/20188/17/20188/17/2018 8:39:49 AMPPASS
ESC04-00646 DOC - Permit Finaled8/17/20188/17/20188/17/2018 8:12:55 AMPPASS
ESC16-01216 DOC - Permit Finaled8/17/20188/17/20188/17/2018 8:12:23 AMPPASS
work complete and stabilized. BLD did not get finaled and permit is expired. ESC permit closed.
ESC17-01199 Aging Inspection8/17/20188/17/20188/17/2018 8:06:55 AM PASS
backyard pool complete, did not final BLD permit
ESC17-01199 DOC - Permit Finaled8/17/20188/17/20188/17/2018 8:06:35 AMPPASS