ESC13-01279
| Tracking Control | 8/19/2014 | 8/19/2014 | 8/19/2014 3:28:22 PM | P | FAIL |
|
|
Follow on Lucky Harris sub corrections.
Wattle on Eckart was replaced and DI bag south of Arrow Junction Street was maintained.
Remaining corrections: 1. Street sweeping along Eckart and Arrow Junction. 2. DI bag on Arrow Junction (north side of street) is full and was not replaced.
|
ESC13-00213
| General Inspection | 8/18/2014 | 8/19/2014 | 8/19/2014 2:18:03 PM | P | PASS |
|
|
No construction activity, active erosion, nor illicit discharges observed. No sediment from site on Castello culdesac.
Project is temporarily on hold and inactive.
|
ESC14-00784
| Site Preparation | 8/18/2014 | 8/19/2014 | 8/19/2014 1:47:22 PM | P | PASS |
|
|
Shawn-please call with a meet time Phone #: ###-####
Homeowner RP with ESC plan experience. Minimal excavation in scope of project, garage on slab to grade. Project boarder a dirt and gravel alley with drainage to a vegetated area where ponding and infiltration occur. Washout will be contained. Work is on Dumars, permit posted on Hays.
Approved for construction.
|
ESC14-00788
| Conference | 8/19/2014 | 8/19/2014 | 8/19/2014 1:00:24 PM | A | DONE |
|
|
Pre-construction held in coordination with Public Works for construction associated with the rough grading permit for Privada Estates sub.
ESC BMPs are to be reinstalled as needed per SWPPP ESC site map by Syman Co. Advised contractors on fugitive dust control, SWPPP inspections, and posting appropriate signage for City of Boise ESC permit and project's Federal CGP.
Work is scheduled to begin next week.
|
ESC13-01073
| Aging Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 12:56:29 PM | | PASS |
|
|
Finaled.
|
ESC13-01073
| DOC - Permit Finaled | 8/19/2014 | 8/19/2014 | 8/19/2014 12:56:17 PM | P | PASS |
|
|
Landscaping is now installed. All ESC conditions satisified.
|
ESC13-01133
| DOC - Permit Finaled | 8/19/2014 | 8/19/2014 | 8/19/2014 11:35:10 AM | P | PASS |
|
|
|
ESC13-01133
| Aging Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 11:33:56 AM | | PASS |
|
|
Project complete. ESC conditions satisfied. All permits finaled.
|
ESC14-00145
| General Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 10:47:53 AM | | PASS |
|
|
Ambulance canopy is in progress. Work and disturbance is within designated limits of construction. No ESC violations or non-stormwater discharges.
|
ESC13-01062
| Aging Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 10:36:54 AM | | PASS |
|
|
Finaled.
|
ESC13-01062
| DOC - Permit Finaled | 8/19/2014 | 8/19/2014 | 8/19/2014 10:36:37 AM | P | PASS |
|
|
House complete and landscaped. Access road has been swept. Adjacent lot is stabilized and will soon be under development. ESC conditions satisfied.
|
ESC13-00997
| General Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 10:26:32 AM | | PASS |
|
|
No construction activity or ESC violations observed. BLD still open. Will follow up on next general inspection.
|
ESC14-00332
| Site Preparation | 8/18/2014 | 8/19/2014 | 8/19/2014 10:05:07 AM | A | PASS |
|
|
Steve Phone #: ###-####
RP Steve on site for walk through inspection. BMPs installed include silt fence perimeter trenched in, desiganted construction entrance, roadside wattles, concrete washout pan, and permit is posted.
Treasure Valley steel site is ready for construction.
|
ESC13-00213
| Site Preparation | 8/18/2014 | 8/19/2014 | 8/18/2014 4:27:10 PM | P | CANC |
|
|
data entry error. Please disregard.
|