ESC18-00164
| Site Preparation | 8/16/2019 | 8/19/2019 | 8/20/2019 12:49:20 PM | A | PASS |
|
|
Corrections completed as requested:
- stabilized construction entrance. - full time water truck working site. - sweeping rocks out of bike lane after each truck exit to Federal Way. - SWPPP info posted, Boise ESC permit is posted - Re-inspection fee paid, site preparation inspection complete.
Will need to watch the drainage areas on the east-northeast perimeter for addition downslope perimeter sediment control. Also need to check that runoff from Amity Road will not flow over the newly disturbed slope.
Correction request: - install sediment protection on storm drain on Federal Way, just west of the construction entrance.
|
ESC18-00920
| Conference | 8/19/2019 | 8/19/2019 | 8/19/2019 5:00:10 PM | P | DONE |
|
|
Met with RP to discuss upcoming schedule and corrections at site
- rubbish pile of vegetation and concrete chunks to be hauled away. - perimeter wattle to be installed has not yet been delivered, but has been re-ordered and installed this week. Access to the future driveway area should either have a construction rock entrance or barricade to prevent people turning around in the mud. - site will build new concrete washout for driveway work that will occur at 146 Skylark. - sweep loose dirt in gutter - install sediment protection on first receiving storm drain down hill
|
ESC16-00935
| Conference | 8/19/2019 | 8/19/2019 | 8/19/2019 4:59:40 PM | P | CANC |
|
|
|
ESC18-00138
| General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 4:54:43 PM | | CANC |
|
|
|
ESC18-00429
| General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 4:54:34 PM | | CANC |
|
|
|
ESC18-00114
| Aging Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 4:49:40 PM | | CANC |
|
|
|
ESC19-00770
| General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 4:09:13 PM | P | PEND |
|
|
WIP on foundation excavation. No trackout, no discharges, dry conditions.
Advance correction request to make sure there is a lined/leakproof concrete washout. It appears they will have some concrete placed this week and a washout was not yet staged.
|
ESC17-01790
| Aging Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 2:12:20 PM | | CANC |
|
|
|
ESC19-00304
| Complaint Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 1:45:07 PM | P | FAIL |
|
|
Dust complaint:
- rock drill and vehicle movement through site is causing fugitive dust.
Corrections needed: - improve and lengthen construction entrance. - sweep apron and Lake Hazel between site and Cole Road. - water truck should be circulating on haul roads when not being used for backfill compaction.
|
ESC18-00900
| Complaint Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 1:42:53 PM | P | FAIL |
|
|
Corrections needed:
- sweep Lake Hazel Rd. between site and Cole - improve and lengthen construction entrance - water the site at the end of each day to "crust" down loose dirt on access roads to limit wind blown dust.
|
ESC19-00351
| General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 10:44:14 AM | A | PASS |
|
|
No activity at site, dry conditions. Site stormwater drains and frontage swale are complete.
No spills, discharges, loose trash, permit sign/SWPPP info posted.
Correction request to install wattles to protect new swales and prevent access to lots through parking lot south of site.
Relocate portapotty > 50 m from storm drain and stake down.
|
ESC19-00907
| Site Preparation | 8/16/2019 | 8/19/2019 | 8/19/2019 10:19:13 AM | A | PASS |
|
|
Alex Phone #: ###-####
Site stromwater retained onsite within the large Darigold facility staging/storage lot. Drainage trench conveys runoff from the work area to a swale that has a silt fence installed for sediment retention in front section of swale.
Will use dust control water as needed, RP to build lined concrete washout pan, will use existing stabilized access to prevent trackout to Allumbaugh.
Approved for construction. Plan is to complete work by November.
|
ESC18-00471
| General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 8:29:35 AM | | CANC |
|
|
|
ESC18-00471
| DOC - Permit Finaled | 8/19/2019 | 8/19/2019 | 8/19/2019 8:29:24 AM | P | PASS |
|
|
see ESC17-01632 for ESC inspections.
|
ESC16-01027
| Aging Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 8:21:12 AM | | CANC |
|
|
|